52000PR240005439_SOW.doc

DOC document 84 KB Posted

Attached to
FM-200 Repair and Inspection
Solicitation number
70Z04024QSBPL0071
Issued by

About this file

This document is a Statement of Work (SOW) for the repair and annual certification of the FM-200 fire extinguishing system on a 45' Response Boat-Medium (RBM) with Hull # 45670 located at U.S. Coast Guard Station Miami Beach. The SOW outlines the specific tasks required, which include annual inspection, recommissioning/decommissioning, rebuilding the discharge control head, hydro-testing and recharging the system cylinders, and notifying the Coast Guard upon completion. The contractor must provide qualified personnel to perform the work. The period of performance is not to exceed completion by July 1, 2024, and the work shall be conducted at the Coast Guard station during normal business hours. This SOW is related to a federal contract opportunity (Solicitation # 70Z04024QSBPL0071) issued by the U.S. Coast Guard Surface Forces Logistics Center for FM-200 repair and inspection services, to be awarded on a lowest-priced, technically-acceptable basis.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #:

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

Fuel tank leak for USCG 45’ RBM Hull # 45670, USCG STA MIAMI BEACH

1.0 GENERAL

1.1 Background

Work to be accomplished is necessary for getting the RBM, Hull # 45670 operational in for Station Miami Beach operations. Asset’s FM-200 fire extinguisher system repair is mission critical.

1.2 Scope

This work item describes the requirements for the contractor to repair and complete annual certification of the FM-200 fire extinguishing system by a National Fire Protection Association or certified technician on Coast Guard RBM Hull # 45670 IAW MPC N31030.D. The contractor shall make all repairs IAW 45 RBM Standard MPC N31030.D. Inspect entire FM-200 system for proper function and, if parts are damaged contractor shall repair all parts. Finally, after the FM-200 system is repaired, contractor shall check the FM-200 system for proper operation.

1.3 OBJECTIVE

To repair 45’ RBM FM-200 fire extinguishing system to ensure full mission capability.

1.4 APPLICABLE DOCUMENTS

1.4.1 Compliance Documents

The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:

1.4.2 Reference Documents

The following documents will be provided upon request and may be helpful to the Contractor in performing the work described in this document:

1. MPC N31030.D

2. MPC N31003.D

3. MPC N31004.D

4. MPC N31006.D

5. MPC N31009.D

6. MPC N31002.D

7. MPC N31019.0

2.0 SPECIFIC REQUIREMENTS/TASKS

2.1 TASK ONE. Annual Inspection FM-200 Engine Room System with time delay, pressure switch & time delay.

2.2 TASK TWO. Recommission & Decommission FM-200 System.

2.3 TASK THREE. Rebuild discharge control head on main system

2.5 TASK FOUR. Hydro-test and refill FM-200 main system cylinder

2.7 TASK SIX. Hydro-test and recharge pilot cylinder

2.8 TASK SEVEN. Hydro-test and recharge time delay

2.9 TASK EIGHT. Rebuild discharge control head for time delay cylinder

3.0. Notify CG.

3.0 CONTRACTOR PERSONNEL

3.1 QUALIFIED PERSONNEL

The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.

3.2 CONTINUITY OF SUPPORT

The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.

3.3 KEY PERSONNEL

3.3.1 None.

3.4 PROJECT MANAGER

The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this SOW. The Project Manager shall be a single point of contact for the Contracting Officer and the COR. It is anticipated that the Project Manager shall be one of the senior level employees provided by the Contractor for this work effort. The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the Project Manager, shall be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates shall be able to read, write, speak and understand English. Additionally, the Contractor shall not replace the Project Manager without prior approval from the Contracting Officer.

3.4.1 The Project Manager shall be available to the COR via telephone between the hours of 0800 and 1600 EST, Monday through Friday, and shall respond to a request for discussion or resolution of technical problems within 02 hours of notification.

4.0 OTHER APPLICABLE CONDITIONS

4.1 SECURITY

Contractor access to classified information is not currently required under this SOW.

4.2 Period of Performance

The period of performance for this contract shall not exceed completion after 01-JUL-2024.

4.3 PLACE OF PERFORMANCE

The primary place of performance will be at Coast Guard Station Miami Beach, which is located at 100 MacArthur Causeway Miami Beach, FL 33139.

4.4 HOURS OF OPERATION

Contractor employees shall generally perform all work between the hours of 0800 and 1600 EST, Monday through Friday (except Federal holidays).

4.7 PROJECT PLAN

The Contractor shall provide a draft Project Plan at the Post Award Conference for Government review and comment. The plan, at a minimum, shall include: (a) list of work to be performed;(b) project schedule; (c) description of intended results; (d) role of key personnel, if applicable and (e) how quality of service (project) will be maintained throughout life of contract. The Contractor shall provide a final Project Plan to the COR not later than 01 business day after the Post Award Conference.

4.8 PROTECTION OF INFORMATION

Contractor access to proprietary information is required under this SOW. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.

5.0 GOVERNMENT FURNISHED RESOURCES

The Government will not furnish any resources to the Contractor in support of this contract.

7.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

7.2 The COR will have 01 business day to review deliverables and make comments. The Contractor shall have 01 business day to make corrections and redeliver.

7.3 All other review times and schedules for deliverables shall be agreed upon by the parties based on the final approved Project Plan. The Contractor shall be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor shall work with personnel reviewing the deliverables to assure that the established schedule is maintained.

LAST UPDATED: 31MAY2022