This Statement of Work (SOW) details a contract for the purchase and replacement of four laboratory fume hoods at the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) in Bremerton, Washington. The project involves removing four existing fume hoods and installing four new BMC Airfoil Bypass Fume Hoods with specific configurations: two 6-foot and two 8-foot models, each equipped with various utilities including air, gas, electrical outlets, switches, and digital airflow monitors. Each fume hood will be accompanied by epoxy resin work surfaces, acid and flammable storage cabinets, and will undergo functionality checks and SEFA testing. The estimated work hours are 40, and the contractor must be a U.S. citizen with access to the controlled industrial area, with work limited to Building 59's laboratory. The source of the estimate is a vendor quote, and the contractor is responsible for quality assurance to ensure the newly installed equipment is in good working order.

View the file

Other files for this federal contract opportunity

Other files attached to FUME HOOD, newest first.
File Type Posted
51678704 UU DRAWING.pdf PDF
51678704 UU CDRL.pdf PDF
25Q2572 FUME HOOD.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSNS&IMF 4200/43 (2-16) Page 2 of 5

3. DELIVERABLE ITEMS: List deliverable products and schedules; test reports, time sheets, Government furnished property (GFP), etc. to be provided to the Government representative and/or contracting officer upon task completion.

4. CONTRACTOR FURNISHED MATERIAL: See JML(s) for an estimated list of prices for the following items:

The contractor shall provide services for

• Demo and removal of four current fume hoods.

• Installation of four replacement, including functionality checks and SEFA testing for the four new fume hoods, sizes/specifications below:

Fume Hood 1:

• 6 ft BMC Airfoil Bypass Fume Hood with:

o (1) Air, (1) Gas, (1) Light Switch, (1) Blower Switch, (2) 115V Electrical Duplexes, (2) 220V Single Electrical Outlets, (1) 3” Dia Port @ Right Side, (1) Sash Stop and (1) digital Airflow Monitor/Alarm o (1) 6 ft Epoxy Resin Work Surface – NO Cup Sink (color: black) o (1) 36” Acid storage cabinet w/vent kit (vented to fume hood) o (1) 36” Base storage cabinet w/vent kit (vented to fume hood)

Fume Hood 2:

• 8 ft BMC Airfoil Bypass Fume Hood with:

o (1) Cold Water Gooseneck, (1) Air, (1) Gas, (1) Light Switch, (1) Blower Switch, (2) 115V Electrical Duplexes, (2) 220V Single Electrical Outlets, (1) Sash Stop and (1) Digital Airflow Monitor/Alarm o (1) 8 ft epoxy resin work surface – with cup sink (color: black) o (1) 48” Flammable storage cabinet w/self-closing doors (NO venting) o (1) 48” Acid storage cabinet w/vent kit (vented to fume hood)

PSNS&IMF 4200/43 (2-16) Page 3 of 5

Fume Hood 3:

• 6 ft BMC Airfoil Bypass Fume Hood with:

o (1) Air, (1) Gas, (1) Light Switch, (1) Blower Switch, (2) 115V Electrical Duplexes, (1) Sash Stop and (1) Digital Airflow Monitor/Alarm, Combination Sash, and Custom 8” Dia Duct Collar at Custom Location o (1) 6 ft epoxy resin work surface – NO cup sink (color: black) o (1) 36” Acid storage cabinet w/vent kit (vented to fume hood) o (1) 36” Flammable storage cabinet w/self-closing doors (NO

Fume Hood 4:

• 8 ft BMC Airfoil Bypass Fume Hood with:

o (1) Air, (1) Gas, (1) Light Switch, (1) Blower Switch, (2) 115V Electrical Duplexes, (1) Sash Stop and (1) Digital Airflow Monitor/Alarm o (1) 8 ft Epoxy Resin Work Surface – NO cup sink (color: black) o (2) 48” Flammable Storage Cabinets w/Self-Closing Doors (NO

5. GOVERNMENT-FURNISHED PROPERTY:

5.1 Original acquisition value of material:

5.2 Location of GFP:

5.3 Manufacturer, model number, and type. Include serial number(s):

5.4 Government provided or contractor pickup:

6. QUALITY ASSURANCE REQUIREMENTS:

PSNS & IMF –or- Contractor is responsible for quality assurance.

The newly installed equipment must be in good working order.

PSNS&IMF 4200/43 (2-16) Page 4 of 5

7. SECURITY REQUIREMENTS: Contractor personnel must be a US citizen, with proof of citizenship document, and will require access to PSNS&IMF controlled industrial area (Green, Yellow, or Red security badge).

Originator determines if a Department Of Defense Contract Security Classification Specification (DD254) is required.

8. TRAVEL REQUIREMENTS: PSNS&IMF, Bldg 59, 1400 Farragut Ave, Bremerton, WA 98314

Is carrier onboard delivery (COD) required? (i.e., when the contractor is transported to a vessel underway.)

9. GOVERNMENT REPRESENTATIVE:

10. OTHER CONSIDERATIONS:

10.1 Estimated Work Hours: 40

10.2 All technical clarifications will be coordinated through the Government representative.

10.3 Environmental and safety concerns: Contractor personnel

will be limited to Bldg 59, laboratory.

10.4 Laydown and utilities requirements: Fume Hoods have

electric power, water, and natural gas. Contractor may need to coordinate with NAVFAC for utility isolation (power, water, natural gas) during demo/install.

12. JUSTIFICATION FOR HIGH-RISK FLAG: -NA-

Date:

Code 413 Statement of Work review

Cognizant technical code review

Cognizant APS/PLM or WIM Review

PSNS&IMF 4200/43 (2-16) Page 5 of 5

Notes:

1. Code 413 reviews SOW for contractual adequacy.

2. Cognizant technical code reviews SOW for technical adequacy.

3. Cognizant APS/PLM or WIM reviews SOW to ensure project requirements are adequately described.

File details come from the government source that posted it. Updated .