5110_Proposal.pdf

PDF 2 MB Posted

Attached to
224th Street East – Asphalt Overlay (SR-7 to 70th Ave E) - CRP 5110
Solicitation number
2025-MPW-236
Issued by
Pierce County, Tacoma City, Washington

About this file

This is a proposal and contract form for a public works project administered by Pierce County Planning & Public Works in Tacoma, Washington, involving the resurfacing and reconstruction of 224th Street East from east of State Route 7 to 70th Avenue East (CRP 5110, Federal Aid No. NHPP-3176(004)). The project encompasses Hot Mix Asphalt overlay, pavement repair, curb ramp reconstruction, removal of existing pavement markings and traffic control devices, and ancillary site work. The bid opening is scheduled for Wednesday, September 30, 2026, at 1:00 p.m. Major work items include 10,110 square yards of bituminous pavement planing, 7,550 tons of Hot Mix Asphalt (Class 1/2 inch PG58H-22), 87 square yards of self-adhering rubberized asphalt membrane, 210 tons of crushed surfacing top course, traffic control and pavement markings totaling thousands of linear feet, erosion control measures, utility coordination, and construction signage. The project also includes price adjustment provisions for compaction and asphalt costs, temporary traffic control labor, flaggers, and a work zone safety contingency of $25,000.

Bidders must submit proposals with unit prices for all items, extensions, and total bid amounts, with all entries typed or in ink. A proposal guaranty of five percent of the total bid is required, payable to Pierce County Treasurer in the form of cash, cashier's check, certified check, or proposal bond. The project is federally funded through the National Highway Performance Program (NHPP), and bidders must comply with federal requirements including nonsegregated facilities certification, non-collusion declaration, and local agency certification for federal-aid contracts. Bidders are required to certify wage law compliance under Washington State law and propose a percentage of recycled materials to be incorporated into the project within allowable limits. Prevailing wage rates apply in accordance with project special provisions. Additional submittals required include contractor's license number, UBI number, Industrial Insurance Account number, Excise Tax number, and Employment Security Account number, along with notarization of the proposal signature.

View the file

Other files

File Type Posted
5110_Contract.pdf PDF
5110_ConstructionPlans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL AND CONTRACT FORMS

FOR

224TH STREET EAST – ASPHALT OVERLAY

(East of State Route 7 to 70th Avenue East)

CRP 5110, Federal Aid No. NHPP-3176(004)

BID OPENING DATE:

Date: WEDNESDAY, SEPTEMBER 30, 2026 Bid Delivery Time: 1:00 p.m.

Bid Opening Time: 1:00 p.m., or as soon thereafter as possible.

PROPOSAL

TO THE PIERCE COUNTY DIRECTOR OF PLANNING & PUBLIC WORKS

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 Mobilization at .

2 207 S.Y. Removing Cement Conc. Sidewalk at . S.Y. .

3 343 L.F. Removing Cement Conc. Curb and Gutter at . L.F. .

4 83 S.Y. Removing Asphalt Conc. Pavement at . S.Y. .

5 107 L.F. Removing Plastic Line at . L.F. .

6 25 EACH Removing Plastic Traffic Marking at . EACH .

7 540 S.F. Removing Plastic Crosswalk Line at . S.F. .

8 16.3 HUND Removing Raised Pavement Marker at . HUND .

GRADING

9 60 C.Y. Roadway Excavation Incl. Haul at . C.Y. .

10 14 S.Y. Pavement Repair Excavation Incl. Haul at . S.Y. .

SURFACING

11 80 TON Crushed Surfacing Base Course at . TON .

12 210 TON Crushed Surfacing Top Course at . TON .

HOT MIX ASPHALT

13 10,110 S.Y. Planing Bituminous Pavement at . S.Y. .

Federal Aid No. NHPP-3176(004)

224TH STREET EAST - ASPHALT OVERLAY

East of SR-7 to 70th Avenue East

LUMP SUM LUMP SUML.S.

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

CRP 5110

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

Proposal 08 13 2026.xlsx

P 1 8/13/2026

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

14 87 S.Y.

Self-Adhering Rubberized Asphalt

Membrane at . S.Y. .

15 8 TON

HMA for Pavement Repair Cl 1/2 in.

PG58H-22 at . TON .

16 7,550 TON HMA Cl. 1/2 in. PG58H-22 at . TON .

17 16,628$ DOLLAR Compaction Price Adjustment at 1$ . 00 per CALC 16,628$ . 00

18 41,986$ DOLLAR Asphalt Cost Price Adjustment at 1$ . 00 per CALC 41,986$ . 00

19 2,537 L.F. Approach Finishing at L.F. .

EROSION CONTROL AND ROADSIDE

PLANTING

20 15 DAY Esc Lead at . per DAY .

21 2 EACH Inlet Protection at . per EACH .

22 5,000$ DOLLAR Erosion/Water Pollution Control at 1$ . 00 per EST 5,000$ . 00

23 59 S.Y. Straw Mulch at . per S.Y. .

24 59 S.Y. Seeding and Fertilizing by Hand at . per S.Y. .

25 59 S.Y. Topsoil Type C at . per S.Y. .

TRAFFIC

26 370 L.F. Cement Conc. Traffic Curb and Gutter at . per L.F. .

27 128 L.F. Cement Conc. Pedestrian Curb at . per L.F. .

28 45,301 L.F. Paint Line at . per L.F. .

29 935 L.F. Painted Wide Line at . per L.F. .

30 540 S.F. Plastic Crosswalk Line at . per S.F. .

31 107 L.F. Plastic Stop Line at . per L.F. .

32 17 EACH Plastic Traffic Arrow at . per EACH .

33 8 EACH Plastic Traffic Letter at . per EACH

34 10.4 HUND Raised Pavement Marker Type 1 at . per HUND

35 5.8 HUND Raised Pavement Marker Type 2 at . per HUND

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 2 8/13/2026

NO. at $ . ct $ . ct

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

36 Permanent Signing at

37 34,514 L.F.

Temporary Pavement Marking - Short

Duration at . per L.F. .

38 49 EACH

Temporary Misc. Pavement Markings -

Short Duration at . per EACH .

39 198 L.F. Temporary Stop Line - Short Duration at . per L.F. .

40 1,080 L.F.

Temporary Crosswalk Line - Short

Duration at . per L.F. .

41 Traffic Signal System Modifications at .

42 4 EACH Replace Junction Box - Type 8 at . per EACH .

43 100 HR Uniformed Law Enforcement Personnel at . per HR .

44 1,800 HR Portable Changeable Message Sign at . per HR .

45 Other Temporary Traffic Control Devices at .

46 1,080 HR Flaggers at . per HR .

47 130 HR Other Traffic Control Labor at . per HR .

48 Traffic Control Supervisor at .

49 25,000$ DOLLAR Work Zone Safety Contingency at 1$ . 00 per EST 25,000$ . 00

50 119 S.F. Construction Signs Class A at . per S.F. .

LUMP SUM

LUMP SUM

LUMP SUM

L.S. LUMP SUM

L.S. LUMP SUM

L.S. LUMP SUM

LUMP SUM L.S. LUMP SUM

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 3 8/13/2026

NO. at $ . ct $ . ct

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

OTHER ITEMS

51 Utility Coordination at .

52 50 MGAL Water at . per MGAL .

53 11 EACH Monument at . per EACH .

54 121 S.Y. Cement Conc. Sidewalk at . per S.Y. .

55 10 EACH Cement Conc. Curb Ramp Type Parallel at . per EACH .

56 11 EACH Adjust Existing Sanitary Sewer Structure at . per EACH .

57 4 EACH Adjust Catch Basin at . per EACH .

58 2,000$ DOLLAR Roadside Cleanup at 1$ . 00 per EST 2,000$ . 00

59 5,000$ DOLLAR Reimbursement for Third Party Damage at 1$ . 00 per EST 5,000$ . 00

60 25,000$ DOLLAR Minor Change at 1$ . 00 per EST 25,000$ . 00

61 SPCC Plan at .

62 FDC Plan at .

CONTRACT TOTAL

LUMP SUM L.S. LUMP SUM

LUMP SUM L.S. LUMP SUM

LUMP SUM L.S. LUMP SUM

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 4 8/13/2026

224TH STREET EAST – ASPHALT OVERLAY

CRP 5110, Federal Aid No. NHPP-3176(004)

_26WORD.SPC\5110-Federal Pack 05 05 2026.docx P 5

Proposal--Continued

The bidder is hereby advised that by signature of this proposal he/she is deemed to have acknowledged all requirements and signed all certificates contained herein.

The undersigned hereby agrees to pay not less than the prevailing rates of wages in accordance with the requirements of the special provisions for this project.

A proposal guaranty in an amount of five percent (5%) of the total bid, based upon the approximate estimate of quantities at the above prices and in the form as indicated below, is attached hereto:

CASH IN THE AMOUNT OF

CASHIER’S CHECK

CERTIFIED CHECK ($_________) PAYABLE TO PIERCE COUNTY

PROPOSAL BOND TREASURER IN THE AMOUNT OF 5% OF THE BID

Receipt is hereby acknowledged of addendum(s) No.(s) _____, _____, and _____.

PROPOSAL MUST BE SIGNED

SIGNATURE OF AUTHORIZED OFFICIAL(S)

By: By:

(Print Name) (Print Name)

FIRM NAME

ADDRESS

Street City State Zip

PHONE FAX E-MAIL

The following information is required per RCW 39.04.350

Contractor’s License No. Contractor’s UBI No.

Industrial Insurance Account No. Excise Tax No.

Employment Security Account No.

Signed and sworn to (or affirmed) before me this day of , 20____.

Notary Public in and for the State of Washington

Residing at My Appointment Expires

Note: (1) This proposal form is not transferable, and any alteration of the firm’s name entered hereon without prior permission from the County will be cause for considering the proposal irregular and subsequent rejection of the bid.

(2) Please refer to Section 1-02.6 of the Standard Specifications, re: “Preparation of Proposal.”

CRP 5110, Federal Aid No. NHPP-3176(004)

_26WORD.SPC\5110-Federal Pack 05 05 2026.docx P 6

PIERCE COUNTY PLANNING & PUBLIC WORKS

PROPOSAL BOND

KNOW ALL MEN BY THESE PRESENTS, That we of as principal, and the a corporation duly organized under the laws of the State of and authorized to do business in the State of Washington, as surety, are held and firmly bound unto Pierce County, State of Washington, in the full and penal sum of five (5) percent of the total amount of the bid proposal of said principal for the work hereinafter described, pursuant to and in compliance with the provisions of RCW 36.77.030, for the payment of which, well and truly to be made, we bind our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents.

The conditions of this bond are such, that whereas the principal herein is hereby submitting his/her or its sealed proposal for the following public works construction, to wit:

said bid and proposal, by reference thereto, being made a part hereof.

NOW, THEREFORE, if said proposal bid by said principal be accepted, and the contract be awarded to said principal, said principal shall duly make and enter into and execute said contract and shall furnish bond as required by RCW 36.77.040 within ten (10) days after notice of the award, exclusive of the day of notice, then this obligation shall be null and void, otherwise it shall remain and be in full force and effect.

IN TESTIMONY WHEREOF, the principal and the surety have caused these presents to be signed and sealed this __________________ day of __________________________, 20___.

Principal

Surety

Attorney-in-fact

P 7

_26WORD.SPC\5110-Federal Pack 05 05 2026.docx P 8

REQUIRED CONTRACT PROVISIONS

FEDERAL-AID CONSTRUCTION CONTRACTS

III. NONSEGREGATED FACILITIES

(Applicable to all Federal-aid construction contracts and to all related subcontracts of $10,000 or more.)

a. By submission of this bid, the execution of this contract or subcontract, or the consummation of this material supply agreement or purchase order, as appropriate, the bidder, Federal-aid construction contractor, subcontractor, material supplier, or vendor, as appropriate, certifies that the firm does not maintain or provide for its employees any segregated facilities at any of its establishments, and that the firm does not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The firm agrees that a breach of this certification is a violation of the EEO provisions of this contract. The firm further certifies that no employee will be denied access to adequate facilities on the basis of sex or disability.

b. As used in this certification, the term “segregated facilities” means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, time clocks, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive, or are, in fact, segregated on the basis of race, color, religion, national origin, age or disability, because of habit, local custom, or otherwise. The only exception will be for the disabled when the demands for accessibility override (e.g., disabled parking).

c. The contractor agrees that it has obtained or will obtain identical certification from proposed subcontractors or material suppliers prior to award of subcontractors or consummation of material supply agreements of $10,000 or more and that it will retain such certifications in its files.

_26WORD.SPC\5110-Federal Pack 05 05 2026.docx P 9

Failure to return this Declaration as part of the bid proposal package will make the bid nonresponsive and ineligible for award.

NON-COLLUSION DECLARATION

I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States, that the following statements are true and correct:

1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted.

2. That by signing the signature page of this proposal, I am deemed to have signed and have agreed to the provisions of this declaration.

NOTICE TO ALL BIDDERS

To report bid rigging activities call: 1-800-424-9071

The U.S. Department of Transportation (USDOT) operates the above toll-free “hotline” Monday through Friday, 8:00 a.m. to 5:00 p.m., Eastern Time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report such activities.

The “hotline” is part of USDOT’s continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the USDOT Inspector General. All information will be treated confidentially, and caller anonymity will be respected.

_26WORD.SPC\5110-Federal Pack 05 05 2026.docx P 10

LOCAL AGENCY CERTIFICATION FOR FEDERAL-AID CONTRACTS

The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:

1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub-recipients shall certify and disclose accordingly.

DOT 272-040A EF

7/2011

_26WORD.SPC\5110-Federal Pack 05 05 2026.docx P 11

Proposal for Incorporating Recycled Materials into the Project

In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall propose below, the total percent of construction aggregate and concrete materials to be incorporated into the Project that are recycled materials. Calculated percentages must be within the amounts allowed in Section 9-03.21(1)F, Table on Maximum Allowable Percent (By Weight) of Recycled Material, of the Standard Specifications.

Proposed total percentage: _____________________________ percent.

Note: Use of recycled materials is highly encouraged within the limits shown above, but does not constitute a Bidder Preference, and will not affect the determination of award, unless two or more lowest responsive Bid totals are exactly equal, in which case proposed recycling percentages will be used as a tiebreaker, per the APWA GSP in Section 1-02.6 of the Special

Provisions. Regardless, the Bidder’s stated proposed percentages will become a goal the

Contractor should do its best to accomplish. Bidders will be required to report on recycled materials actually incorporated into the Project, in accordance with the APWA GSP in Section

1-06.6 of the Special Provisions.

Bidder Name:

Signature of Authorized Official:

Date:

_26WORD.SPC\5110-Federal Pack 08 12 2026.docx P 12

CONTRACTOR CERTIFICATION WAGE LAW COMPLIANCE

The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (September 30, 2026), the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.

I declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct.

Bidder’s Business Name

Signature of Authorized Official*

Printed Name

Title

Date

City

State

Check One:

Sole Proprietorship ☐ Partnership ☐ Joint Venture ☐ Corporation ☐

State of Incorporation, or if not a corporation, State where business entity was formed:

If a co-partnership, give firm name under which business is transacted:

* If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner.