ADA Improvement Program – 2026: 112th St S (Sheridan Ave South to C Street South) CRP 5109
Solicitation number
2025-MPW-235
Issued by
Pierce County, Washington

About this file

This is a proposal and contract form for the ADA Improvement Program – 2026, issued by Pierce County Planning & Public Works in Tacoma, Washington. The project involves improvements to 112th Street South from Sheridan Avenue South to C Street South (CRP 5109), including removal and reconstruction of curb ramps, replacement of damaged sidewalk segments, installation of accessible pedestrian signal components, and related work. The scope encompasses 49 line items organized into preparation, grading, surfacing, hot mix asphalt, erosion control, traffic, and other categories. Representative quantities include 516 square yards of cement concrete sidewalk removal, 945 linear feet of curb and gutter removal, 1,009 linear feet of new cement concrete traffic curb and gutter installation, 648 square feet of plastic crosswalk lines, 230 square yards of new cement concrete sidewalk, 14 curb ramps, and various traffic control and temporary signage elements. The bid opening is scheduled for Wednesday, July 22, 2026, at 1:00 p.m., with bids to be delivered by the same time.

Bidders must submit proposals with unit prices for all line items and extensions to calculate the total contract amount. A proposal guaranty of five percent of the total bid is required in the form of cash, cashier's check, certified check, or proposal bond, payable to Pierce County. Bidders must comply with prevailing wage requirements, provide subcontractor lists for certain trades including structural steel, rebar, HVAC, plumbing, and electrical work as defined by state law, and submit certifications regarding nonsegregated facilities, non-collusion, debarment status, and wage law compliance. Bidders are encouraged to propose recycled materials within allowable limits, with recycled material percentages serving as a tiebreaker only if two or more lowest responsive bids are equal. Bidders must provide proof of Washington contractor's license, UBI number, industrial insurance account number, excise tax number, and employment security account number. Proposals must be notarized and signed by authorized officials.

View the file

Other files

File Type Posted
5109_Contract.pdf PDF
5109_ConstructionPlans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL AND CONTRACT FORMS

FOR

ADA IMPROVEMENT PROGRAM – 2026

112TH STREET SOUTH

Sheridan Avenue South to C Street South

CRP 5109

BID OPENING DATE:

Date: WEDNESDAY, JULY 22, 2026 Bid Delivery Time: 1:00 p.m.

Bid Opening Time: 1:00 p.m., or as soon thereafter as possible.

PROPOSAL

TO THE PIERCE COUNTY DIRECTOR OF PLANNING & PUBLIC WORKS

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 Mobilization at .

2 Removal of Structures and Obstructions at .

3 516 S.Y. Removing Cement Conc. Sidewalk at S.Y. .

4 945 L.F. Removing Cement Conc. Curb and Gutter at L.F. .

5 105 S.Y. Removing Asphalt Conc. Pavement at S.Y. .

6 1 EACH Removing Tree and Stump at EACH .

7 25 L.F. Removing Paint Line at L.F. .

8 115 L.F. Removing Plastic Line at L.F. .

9 648 S.F. Removing Plastic Crosswalk Line at S.F. .

10 0.1 HUND. Removing Raised Pavement Markers at HUND. .

11 50 L.F. Removing Fence at L.F. .

GRADING

12 150 C.Y. Roadway Excavation Incl. Haul at C.Y. .

ADA IMPROVEMENT PROGRAM - 2026

LS LUMP SUM

(Sheridan Avenue South to C Street South)

LUMP SUM LUMP SUMLS

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

CRP 5109

LUMP SUM

112TH STREET SOUTH

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

5109-Prop-EngEst-06 16 2026.xlsx

P 1 6/16/2026

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

SURFACING

13 420 TON Crushed Surfacing Base Course at TON .

HOT MIX ASPHALT

14 110 TON HMA Cl. 1/2 In. PG58H-22 at TON .

EROSION CONTROL AND

ROADSIDE PLANTING

15 14 DAY Esc Lead at DAY .

16 15 EACH Inlet Protection at EACH .

17 1,000$ DOLLAR Erosion/Water Pollution Control at 1$ . 00 EST. 1,000$ . 00

18 80 S.Y. Seeding and Fertilizing by Hand at S.Y. .

19 80 S.Y. Topsoil Type C at S.Y. .

TRAFFIC

20 1,009 L.F. Cement Conc. Traffic Curb and Gutter at L.F. .

21 53 L.F. Modified Cement Conc. Pedestrian Curb at L.F. .

22 97 L.F. Cement Conc. Pedestrian Curb at L.F. .

23 648 S.F. Plastic Crosswalk Line at S.F. .

24 115 L.F. Plastic Stop Line at L.F. .

25 0.1 HUND. Raised Pavement Marker Type 1 at HUND. .

26 Permanent Signing at .

27 115 L.F.

Temporary Pavement Marking -

Short Duration at L.F. .

28 648 L.F.

Temporary Crosswalk Line -

Short Duration at L.F. .

29 Traffic Signal System Modifications at .

30 720 HR Portable Changeable Message Sign at HR .

31 Other Temporary Traffic Control Devices at .

LUMP SUM LS LUMP SUM

LUMP SUM

LUMP SUM LS LUMP SUM

LS LUMP SUM

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 2 6/16/2026

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

32 960 HR Flaggers at HR .

33 144 HR Other Traffic Control Labor at HR .

34 Traffic Control Supervisor at .

35 6,000$ DOLLAR Work Zone Safety Contingency at 1$ . 00 EST. 6,000$ . 00

36 364 S.F. Construction Signs Class A at S.F. .

OTHER ITEMS

37 Utility Coordination at .

38 230 S.Y. Cement Conc. Sidewalk at S.Y. .

39 28 S.Y. Cement Conc. Approach at S.Y. .

40 14 EACH Cement Conc. Curb Ramp Type Parallel at EACH .

41 13 EACH

Cement Conc. Curb Ramp Type

Single Direction at EACH .

42 8 EACH Adjust Catch Basin at EACH .

43 1,000$ DOLLAR Roadside Cleanup at 1$ . 00 EST. 1,000$ . 00

44 5,000$ DOLLAR Reimbursement for Third Party Damage at 1$ . 00 EST. 5,000$ . 00

45 20,000$ DOLLAR Minor Change at 1$ . 00 CALC. 20,000$ . 00

46 SPCC Plan at .

47 FDC Plan at .

48 4 EACH Mailbox Support Type 1 at EACH .

49 3 EACH Mailbox Support Type 2 at EACH .

CONTRACT TOTAL

LUMP SUM

LUMP SUM

LUMP SUM

LS LUMP SUM

LS LUMP SUM

LUMP SUM LS LUMP SUM

LUMP SUM LS

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 3 6/16/2026

ADA Improvement Program – 2026, CRP 5109 112TH STREET SOUTH (Sheridan Avenue South to C Street South) _26WORD.SPC\5109-LocalPack 06 05 2026.docx P 4

Proposal--Continued

The bidder is hereby advised that by signature of this proposal he/she is deemed to have acknowledged all requirements and signed all certificates contained herein.

The undersigned hereby agrees to pay not less than the prevailing rates of wages in accordance with the requirements of the special provisions for this project.

A proposal guaranty in an amount of five percent (5%) of the total bid, based upon the approximate estimate of quantities at the above prices and in the form as indicated below, is attached hereto:

CASH IN THE AMOUNT OF

CASHIER’S CHECK

CERTIFIED CHECK ($_________) PAYABLE TO PIERCE COUNTY

PROPOSAL BOND TREASURER IN THE AMOUNT OF 5% OF THE BID

Receipt is hereby acknowledged of addendum(s) No.(s) _____, _____, and _____.

PROPOSAL MUST BE SIGNED

SIGNATURE OF AUTHORIZED OFFICIAL(S)

By: By:

(Print Name) (Print Name)

FIRM NAME

ADDRESS

Street City State Zip

PHONE FAX E-MAIL

The following information is required per RCW 39.04.350

Contractor’s License No. Contractor’s UBI No.

Industrial Insurance Account No. Excise Tax No.

Employment Security Account No.

Signed and sworn to (or affirmed) before me this day of , 20____.

Notary Public in and for the State of Washington

Residing at My Appointment Expires

Note: (1) This proposal form is not transferable, and any alteration of the firm’s name entered hereon without prior permission from the County will be cause for considering the proposal irregular and subsequent rejection of the bid.

(2) Please refer to Section 1-02.6 of the Standard Specifications, re: “Preparation of Proposal.”

_26WORD.SPC\5109-LocalPack 06 05 2026.docx P 5

PIERCE COUNTY PLANNING & PUBLIC WORKS

PROPOSAL BOND

KNOW ALL MEN BY THESE PRESENTS, That we of as principal, and the a corporation duly organized under the laws of the State of and authorized to do business in the State of Washington, as surety, are held and firmly bound unto Pierce County, State of Washington, in the full and penal sum of five (5) percent of the total amount of the bid proposal of said principal for the work hereinafter described, pursuant to and in compliance with the provisions of RCW 36.77.030, for the payment of which, well and truly to be made, we bind our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents.

The conditions of this bond are such, that whereas the principal herein is hereby submitting his/her or its sealed proposal for the following public works construction, to wit:

said bid and proposal, by reference thereto, being made a part hereof.

NOW, THEREFORE, if said proposal bid by said principal be accepted, and the contract be awarded to said principal, said principal shall duly make and enter into and execute said contract and shall furnish bond as required by RCW 36.77.040 within ten (10) days after notice of the award, exclusive of the day of notice, then this obligation shall be null and void, otherwise it shall remain and be in full force and effect.

IN TESTIMONY WHEREOF, the principal and the surety have caused these presents to be signed and sealed this __________________ day of __________________________, 20___.

Principal

Surety

Attorney-in-fact

P 6

Local Agency Subcontractor List Prepared in compliance with RCW 39.30.060 as amended.

To Be Submitted with the Bid Proposal

Project Name ___________________________________________________________________________________________

Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform the same work will result in your bid being non-responsive and therefore void.

Subcontractor(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name.

If RCW 39.30.060 requires a proof of license, the license number of that Subcontractor is required. To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bidder itself, or (ii) be performed by a lower tier subcontractor who will not contract directly with the bidder.

Subcontractor Name ____________________________________________________________________________________ (and License Number if required)

Work to be performed ___________________________________________________________________________________

Subcontractor Name ____________________________________________________________________________________ (and License Number if required)

Work to be performed ___________________________________________________________________________________

Subcontractor Name ____________________________________________________________________________________ (and License Number if required)

Work to be performed ___________________________________________________________________________________

Subcontractor Name ____________________________________________________________________________________ (and License Number if required)

Work to be performed ___________________________________________________________________________________

Subcontractor Name ____________________________________________________________________________________ (and License Number if required)

Work to be performed ___________________________________________________________________________________

*Bidders are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc., are considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical current is connected during the project.

Tacoma Mall Plaza 2702 South 42nd Street Suite 109 Tacoma, WA 98409

Pierce County Planning & Public Works

_26WORD.SPC\5109-LocalPack 06 05 2026.docx P 7

CERTIFICATION OF NONSEGREGATED FACILITIES

The contractor certifies that no segregated facilities are maintained and will not be maintained during the execution of this contract at any of contractor’s establishments.

The contractor further certifies that none of the contractor’s employees are permitted to perform their services at any location under the contractor’s control during the life of this contract where segregated facilities are maintained. The contractor certifies further segregated facilities will not be maintained or provided for employees at any of the contractor’s establishments, and that employees will not be permitted to perform their services at any location, under the contractor’s control, where segregated facilities are maintained.

The contractor agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this certification, the term “segregated facilities” means any waiting rooms, work area, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color or national origin, because of habit, local custom, or otherwise.

The contractor agrees that identical certifications from proposed contractors will be obtained prior to the award of any subcontracts. Contractor will retain a copy of any subcontractor’s certification and will send original to Contract Compliance Division.

NON-COLLUSION AND DEBARMENT AFFIDAVIT

State of Washington, County of

As an authorized representative of the firm of , I do hereby certify that said person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted.

I further certify that, except as noted below, the firm, association or corporation or any person in a controlling capacity associated therewith or any position involving the administration of federal funds; is not currently under suspension, debarment, voluntary exclusion, or determination of eligibility by any federal agency; has not been suspended, debarred, voluntarily excluded or determined ineligible by any federal agency within the past three (3) years; does not have a proposed debarment pending; and has not been indicted, convicted or had a civil judgment rendered against said person, firm, association or corporation by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past three years.

I further acknowledge that by signing the signature page of the proposal, I am deemed to have signed and have agreed to the provisions of this affidavit.

Note: Exceptions will not necessarily result in denial of award but will be considered in determining bidder responsibility. For any exception noted, indicate above to whom it applies, initiating agency, and dates of action. Providing false information may result in criminal prosecution or administrative sanctions.

“A suspending or debarring official may grant an exception permitting a debarred, suspended, or excluded person to participate in a particular transaction upon a written determination by such official stating the reason(s) for deviating from the Presidential policy established by Executive Order 12549...” (49CFR Part 29 Section 29.215).

_26WORD.SPC\5109-LocalPack 06 05 2026.docx P 8

Proposal for Incorporating Recycled Materials into the Project

In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall propose below, the total percent of construction aggregate and concrete materials to be incorporated into the Project that are recycled materials. Calculated percentages must be within the amounts allowed in Section 9-03.21(1)F, Table on Maximum Allowable Percent (By Weight) of Recycled Material, of the Standard Specifications.

Proposed total percentage: _____________________________ percent.

Note: Use of recycled materials is highly encouraged within the limits shown above, but does not constitute a Bidder Preference, and will not affect the determination of award, unless two or more lowest responsive Bid totals are exactly equal, in which case proposed recycling percentages will be used as a tiebreaker, per the APWA GSP in Section 1-02.6 of the Special

Provisions. Regardless, the Bidder’s stated proposed percentages will become a goal the

Contractor should do its best to accomplish. Bidders will be required to report on recycled materials actually incorporated into the Project, in accordance with the APWA GSP in Section

1-06.6 of the Special Provisions.

Bidder Name:

Signature of Authorized Official:

Date:

_26WORD.SPC\5109-LocalPack 06 10 2026.docx P 9

CONTRACTOR CERTIFICATION WAGE LAW COMPLIANCE

The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (July 22, 2026), the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.

I declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct.

Bidder’s Business Name

Signature of Authorized Official*

Printed Name

Title

Date

City

State

Check One:

Sole Proprietorship ☐ Partnership ☐ Joint Venture ☐ Corporation ☐

State of Incorporation, or if not a corporation, State where business entity was formed:

If a co-partnership, give firm name under which business is transacted:

* If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner.

File details come from the government source that posted it. Updated .