This solicitation requests proposals for renovating Building 35 at the Thomas E. Creek VA Medical Center in Amarillo, Texas into a residential rehabilitation treatment program facility. Key requirements include removing existing walls and installing new walls and doors, replacing air handling units and HVAC systems, installing new ductwork and supply drops, and performing electrical, plumbing, fire alarm, and camera installation work. Proposals are due within 120 calendar days of award, and the period of performance is 120 calendar days with a one-year warranty. Additional deliverables include quality control and safety plans due within 5 days of notice to proceed, operations and maintenance manuals, and staff training. Proposers must follow all applicable construction codes and OSHA standards.

View the file

Other files

File Type Posted
36C25722B0025 0005.docx DOCX document
Pre Bid RFIs 2.docx DOCX document
36C25722B0025 0004.docx DOCX document
Pre-Bid RFIs.docx DOCX document
504-22-125 Sign in sheet Site Visit.pdf PDF
36C25722B0025 0003.docx DOCX document
36C25722B0025 0002.docx DOCX document
36C25722B0025 0001.docx DOCX document
36C25722B0025_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6A

5A

7A

3A

8A

4A

2A

1A2

BED ROOM

149 sf

BED ROOM

149 sf

BED ROOM

153 sf

STAFF WORK RM

153 sf

LIVING ROOM

210 sf

BED ROOM

153 sf

BED ROOM

149 sf

BED ROOM

145 sf

BED ROOM

149 sf

KITCHEN

210 sf

10A

LINEN CLOSET

6 sf

HAC

45 sf

MECHANICAL

28 sf

CONSTRUCTION NOTES CONT.:

G) REMOVE EXISTING KITCHEN COUNTERTOP AND INSTALL A NEW SOLID, NONPOROUS COUNTERTOP WITH A SMOOTH SEAMLESS APPEARANCE.

EASY TO CLEAN AND MAINTAIN AND WITH PROPER CLEANING DOES NOT SUPPORT THE GROWTH OF MOLD. AN ACRYLIC-BASED SOLID

PRODUCT. STANDARD THICKNESS OF 1", AND A 4" BUTT BACKSPLASH/CURB. (COLOR TBD).

H) REMOVE ALL EXISTING INTERIOR DOORS, FRAMES, AND HARDWARE. BED ROOM DOORS WILL SWING OUT INTO THE CORRIDOR, AND BATH ROOM DOORS WILL SWING OUT INTO THE BEDROOMS. ALL DOOR OPENINGS, WITH THE EXCEPTION OF THE LINEN CLOSET DOOR, WILL NEED TO ACCOMMODATE A NEW 42" WIDE DOOR. ALL NEW INTERIOR DOORS WILL BE 3'-6" X 7'-0" X 1-34" SOLID-CORE, FLUSH-PANEL WOOD DOORS

WITH HOLLOW METAL FRAMES.

I) ALL BEDROOM DOORS WILL USE ANTI LIGATURE HARDWARE TO INCLUDE:

HINGES (QUANTITY AND TYPE AS REQUIRED)

1 GUESTROOM CARD LOCK (LOCK TO BE COMPATIBLE TO CAMPUS AMAG SYSTEM) (LOCK TO ALSO BE KEY ENTRY ONLY)

(CARD WILL BE PROGRAMMED TO UNLOCK ROOM DOOR AND THE FRONT DOOR)

1 CLOSER (RATED FOR THE DOOR) (CLOSURE INSTALLED ON CORRIDOR SIDE)

1 FLOOR STOP

2 DOOR VIEWERS

2 SETS SELF-ADHESIVE SEALS

J) ALL BATH ROOMS DOORS WILL USE ANTI LIGATURE HARDWARE TO INCLUDE:

PIANO HINGES

1 RESTROOM PRIVACY LOCK (TOOL TO OPEN)

1 CLOSER (RATED FOR THE DOOR)

1 FLOOR STOP

2 SETS SELF-ADHESIVE SEALS

K) INSTALL NEW SELF-CLOSING CLOSER ON ALL EXISTING EXTERIOR EXIT DOORS.

L) DOOR TO STAFF WORK ROOM WILL BE TIED INTO THE HOSPITAL'S AMAG SYSTEM.

M) RESIDENT ROOMS AND STAFF TO HAVE STORE ROOM LOCK FUNCTION, ALWAYS LOCK, WITH 7 PIN BEST CORES FOR KEY ENTRY.

N) REMOVE THE EXISTING EXTERIOR DOOR IN THE KITCHEN. INSTALL NEW EXTERIOR DOOR AND FRAME WITH NEW HARDWARE TO MATCH

EXISTING.

O) REMOVE ALL EXISTING WINDOWS AND REPLACE WITH A NEW DOUBLE GLAZED WINDOWS. THE INTERIOR FACE OF THE WINDOW SHALL BE LAMINATE GLAZING. NEW WINDOWS MUST HAVE A CLEAR OPENING NOT LESS THAN 5.7 SQ. FT. AND NOT LESS THAN 20" WIDE AND 24"HEIGHT.

CONTRACTOR TO SUPPLY AND INSTALL NEW PULL DOWN SHADE FOR EACH WINDOW.

P) REMOVE ALL EXISTING BATH TUBS (4) AND SHOWERS (4). ALL BATH ROOMS TO RECEIVE A NEW PORCELAIN TILE TO THE CEILING, STAND-ALONE WALK-IN SHOWER PROVIDED AND INSTALLED BY THE CONTRACTOR. PLUMBING FOR THE NEW SHOWERS SHALL BE REWORKED

TO ACCOMMODATE A NEW SHOWER MIXING VALVE AS PER CODE.

Q) REMOVE ALL ACCESS PANELS LOCATED IN THE BATH ROOMS. REPAIR, PATCH, AND APPLY A LEVEL 4 FINISH TO REPAIRED WALLS. PAINT

WALLS TO MATCH THE REST OF THE PAINTED WALLS.

R) REMOVE ALL CABINETS, COUNTERTOPS, AND SINKS IN THE BATHROOMS. INSTALL NEW LAVATORIES WITH BUILT-IN SINK APRONS.

S) REMOVE AND INSTALL NEW TOILETS IN ALL BATHROOMS.

T) INSTALL NEW GRAB BARS AROUND EXISTING TOILETS. THE CONTRACTOR WILL MAKE SURE THAT ALL NECESSARY BLOCKING FOR EACH GRAB

BAR IS INSTALLED.

U) INSTALL A MINIMUM SIZE, 4 12" x 4 12" PORCELAIN WALL TILE, 4 FOOT HIGH ON ALL THE WALLS OF EACH BATH ROOMS.

V) REMOVE ALL SURFACE MOUNTED CEILING FANS AND LIGHT FIXTURES. INSTALL FOUR (4) NEW RECESSED, TAMPER RESISTANT, LED CAN LIGHTING FIXTURES IN EACH ROOM. BATHROOMS WILL HAVE ONE (1) NEW RECESSED, TAMPER RESISTANT, LED CAN LIGHTING FIXTURE, AND ONE (1) NEW RECESSED, TAMPER RESISTANT, LED CAN LIGHTING FIXTURE CENTERED IN THE SHOWER. EACH CORRIDOR WILL RECEIVE THREE (3) NEW RECESSED, TAMPER RESISTANT, LED CAN LIGHTING FIXTURES, EVENLY SPACED. ALL LIGHTS WILL AN AUTO OCCUPANCY

DIMMER SWITCH.

W) REPLACE ALL ELECTRICAL LIGHT AND OUTLET COVERS.

X) REPLACE BOTH AIR HANDLER UNITS LOCATED IN THE ATTIC SPACE AT EACH END OF THE CORRIDORS. NEW AIR HANDLER UNITS WILL BE SIZED TO MEET HVAC PEAK LOADING DESIGNS FOR HEATING AND COOLING IN THE AMARILLO AREA. AIR HANDLER UNITS WILL HAVE (2) TWO PRE-FILTER, PF-1 MERV 7 AND PF-2 MERV11, AND A AFTER FILTER, AF MERV 14, BUILT IN TO THE UNIT. NEW AIR HANDLER WILL MEET THE HVAC

NOISE CRITERIA OF 35 NC. INSTALL NEW THERMOSTAT IN EACH ROOM.

Y) HVAC WILL BE SIZED TO HANDLE THE FOLLOWING AIR CHANGES A HOUR; 6 ACH IN THE BEDROOMS, STAFF WORK ROOM, KITCHEN, AND

VESTIBULE AREAS. ALL AREAS ARE TO HAVE 2 OA ACH.

Z) EXISTING HVAC DUCTWORK TO BE REMOVED AND REPLACED WITH NEW MINIMUM DUCT SIZE (RECTANGULAR DUCTS 8" x 6" or ROUND DUCTS 6") GALVANIZED STEEL DUCT THROUGH OUT THE BUILDING. INSTALL NEW 6" ROUND GALVANIZED STEEL DUCT FROM THE HVAC UNIT RETURN TO EACH ROOM. TERMINATE IN THE ROOM'S CEILING WITH A PLENUM BOX AND LOUVERED 14 X 14 CEILING FILTER REGISTER. REMOVE

EXISTING RETURN DUCT AND PATCH WALL ACCORDINGLY.

AA) REMOVE EXISTING KITCHEN HOOD AND INSTALL NEW KITCHEN HOOD IN THE SAME LOCATION. KITCHEN EXHAUST NEGATIVE TO DINING AREA.

NEW HOOD WILL EXHAUST OUT OF THE BUILDING. SOUND LEVEL TO BE LESS THAN 0.9 SONE RATING.

AB) INSTALL NEW EXHAUST FAN IN ALL BATHROOMS. EXHAUST FANS ARE TO EXHAUST OUT OF THE BUILDING AND HAVE 10 AIR CHANGES A HOUR

WHEN OPERATING. SOUND LEVEL TO BE LESS THAN 0.9 SONE RATING.

AC) CONTRACTOR TO RE-INSULATE THE ATTIC SPACE TO A MINIMUM OF R30 (13" THICK).

AD) PROVIDE AND INSTALL A SMOKE DETECTOR IN ALL ROOMS. DETECTORS WILL BE WIRED TO THE EXISTING CAMPUS FIRE ALARM SYSTEM. ALL

WIRING WILL BE INSTALLED IN 3 / 4 INCH CONDUIT.

AE) CONTRACTOR TO PROVIDE AND INSTALL CAMERAS FACING EACH DOOR PROVIDING 100% VIEW OF THE CORRIDORS AND COMMON SPACE.

CAMERAS WILL BE MONITORED FROM THE STAFF WORK ROOM.

SCALE: 1/4" = 1'

Building 35 Existing Floor Plan1

GENERAL NOTES:

1) CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY DEMOLITION WORK TO CONFIRM ACCURACY IN DRAWINGS.

REPORT ANY DISCREPANCIES TO THE VA COR. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS.

2) PRIOR TO BEGINNING WORK, GENERAL CONTRACTOR AND COR WILL WALK THE SITE AND VERIFY ALL EXISTING CONDITIONS OF THE SURROUNDING AREAS. THE GENERAL CONTRACTOR WILL FIX ANY DAMAGED TO THE EXISTING SURROUNDING AREA DURING CONSTRUCTION.

3) WORK TO BE COMPLETED WITHOUT INTERRUPTION TO DAILY HOSPITAL ACTIVITY.

4) DURING DEMOLITION, PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN PLACE DURING THE RENOVATION WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR ANY DAMAGE TO ADJACENT FINISHED TO MATCH EXISTING.

5) COVER ALL RETURN AIR GRILLS WITHIN THE AREA OF CONSTRUCTION TO PREVENT PARTICULATE MATERIAL FROM EXHAUSTING INTO

SURROUNDING SPACES.

6) CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SUPERVISION, AND CONSTRUCTION SERVICES NECESSARY TO

ACHIEVE A 100% FUNCTIONAL SYSTEMS.

7) CONTRACTOR WILL BE REQUIRED TO PERFORM ALL NECESSARY TESTING.

CONSTRUCTION NOTES:

A) REPAIR ALL EXTERIOR EFIS DAMAGE TO THE BUILDING. THIS WORK WILL INCLUDE, BUT NOT LIMITED TO, REPAIRING THE UNDER STRUCTURE IF

NEEDED, APPLYING A NEW BASE COAT AND FINISH COAT. THE COLOR OF THE EFIS TO MATCH EXISTING EFIS COLOR.

B) INSTALL A 3 FOOT NEW MOW STRIP ON THE FRONT OF THE BUILDING TO MATCH EXISTING MOW STRIP OF THE BUILDING. TIE IN NEW MOW STRIP

INTO THE EXISTING MOW STRIPS ON THE SIDE OF THE BUILDING.

C) REMOVE ALL EXISTING WALL COVERINGS THROUGH OUT THE BUILDING. REPAIR, PATCH, AND APPLY A LEVEL 4 FINISH TO ALL WALLS. ALL

WALLS TO BE PAINTED A NATURAL COLOR. PAINT COLOR TBD.

D) REMOVE ALL THE EXISTING FLOOR THROUGH OUT THE BUILDING. PORCELAIN TILE WILL BE INSTALLED IN ALL BATH ROOMS (COLOR TBD).

LUXURY VINYL TILE WILL BE INSTALLED THROUGH OUT THE REST OF THE BUILDING (COLOR TBD).

E) REMOVE ALL EXISTING 4" COVE BASE THROUGH THE BUILDING. INSTALL A NEW 4" VINYL COVE BASE. COVE BASE COLOR TBD.

F) REFINISH EXISTING KITCHEN CABINETS AND INSTALL NEW CABINET HARDWARE.

AutoCAD SHX Text

DN

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

DN

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg.

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text B

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text of

AutoCAD SHX Text Thomas E. Creek VA Medical Center Amarillo Texas

AutoCAD SHX Text 504-22-125

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AMARILLO

AutoCAD SHX Text

TEXAS

AutoCAD SHX Text Renovate Building 35

AutoCAD SHX Text to RRTP

AutoCAD SHX Text Building. 35, 1st Floor

AutoCAD SHX Text B35-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AJW

AutoCAD SHX Text

AutoCAD SHX Text 3/10/2022

AutoCAD SHX Text

AVAMC ENGINEERING

Sheets and Views
504-22-125 Renovate Building 35 to RRTP-Plan Set