504-20-105 Drawings.pdf
PDF 38 MB Posted
- Solicitation number
- 36C25723B0059
About this file
This federal contract opportunity is for upgrading fire alarm systems at a Veterans Affairs medical center. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 for project number 504-20-105. Offerors are to provide all labor, materials, equipment and supervision required to upgrade existing fire alarm systems at the specified location. Proposals are due by July 15, 2024 and the period of performance is 365 calendar days from date of award. Pricing is to be submitted as a firm fixed price for the base requirement and any optional items. The anticipated award date is August 15, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25723B0059 0004.docx | DOCX document | |
| 36C25723B0059 0003.docx | DOCX document | |
| RFIs for IFB 36C25723B0059.docx | DOCX document | |
| 36C25723B0059 0002.docx | DOCX document | |
| Sign Sheet-In for Fire Alarm.pdf | ||
| 36C25723B0059 0001.docx | DOCX document | |
| 504-20-105 Specifications_Part2.pdf | ||
| 504-20-105 Specifications_Part4.pdf | ||
| 504-20-105 Specifications_Part3.pdf | ||
| 504-20-105 Specifications_Part5.pdf | ||
| 36C25723B0059_1.docx | DOCX document | |
| 504-20-105 Specifications_Part1.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
OCMI
6110 EXECUTIVE BLVD.
SUITE 200
ROCKVILLE, MD 20852
202-229-0530
CONSULTANT:
COFFMAN ENGINEERS
8171 MAPLE LAWN BLVD.
SUITE 320
FULTON, MD 20759
202-655-4035
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
THOMAS E. CREEK VA MEDICAL CENTER
6010 West Amarrilo Blvd.
Amarillo, TX 79106
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
SEALED WITH SIGNATURE
05/26/2023
504-20-105
JSAL
UPGRADE FIRE ALARM SYSTEM AT
THOMAS E. CREEK
VA MEDICAL CENTER
BID SET SUBMISSION
COVER SHEET
GI100
-2
-1
G I1
.p d f
Department of Veterans Affairs
UPGRADE FIRE ALARM SYSTEM
THOMAS E. CREEK VA MEDICAL CENTER
6010 West Amarrilo Blvd.
Amarillo, TX 79106
LOCATION MAP DRAWING LIST PROJECT DIRECTORY
Medical Center Director
Director of Facility Management Service
Medical Director
Project COR
Project CO
Infection Control
Safety Officer
CONTRACTING OFFICER REPRESENTATIVE (COR)
Andrew Wieck
Thomas E. Creek VAMC 6010 West Amarrilo Blvd.
Amarillo, TX 79106
PHONE: (806) 673-8618
andrew.weick@va.gov
ARCHITECT
CB DESIGN GROUP, INC
Att: Arnaud Longeau 421 King St. Suite 301 Alexandria, VA 22314
PHONE: (888) 585-CBDG (2234)
alongeau@cbdg-ae.com
MEP/FP/STRUCTURAL ENGINEER
COFFMAN ENGINEERS
Att: Chris Butterworth 8171 Maple Lawn Blvd. Suite 320 Fulton, MD 20759
PHONE: (202) 655-4035
chris.butterworth@coffman.com
CONTRACTING OFFICER (CO)
Joyce Mills
Central Texas Veterans Health Care System 2002 Scott Blvd Temple, TX 76504
PHONE: (254) 899-6026
joyce.mills@va.gov
APPROVALS
BID SET SUBMISSION
NOT TO SCALE TRUE NORTH
FA2.21 BUILDING 33, 1ST FLOOR FIRE ALARM NEW WORK PLAN
FA2.22 BUILDING 44, 1ST & 2ND FLOOR FIRE ALARM NEW WORK PLAN
FA2.23 BUILDING 45, 1ST FLOOR FIRE ALARM NEW WORK PLAN
FA2.24 BUILDING 46, 1ST & 2ND FLOOR FIRE ALARM NEW WORK PLAN
FA2.25 BUILDING 48, 1ST & 2ND FLOOR FIRE ALARM NEW WORK PLAN
FA2.26 BUILDING 49, FIRE ALARM NEW WORK PLAN
FA2.27 BUILDING 53, 1ST & 2ND FLOOR FIRE ALARM NEW WORK PLAN
FA2.28 BUILDING 54, 1ST FLOOR FIRE ALARM NEW WORK PLAN
FA2.29 BUILDING 32, 34, 35, 37, 39 & 56 FIRE ALARM NEW WORK PLAN
FA1.16 BUILDING 28, 3RD FLOOR FIRE ALARM DEMOLITION PLAN
FA1.17 BUILDING 28, PENTHOUSE & 4TH FLOOR FIRE ALARM DEMOLITION PLAN
FA1.18 BUILDING 29, 1ST FLOOR FIRE ALARM DEMOLITION PLAN
FA1.19 BUILDING 29, 2ND FLOOR FIRE ALARM DEMOLITION PLAN
FA1.20 BUILDING 29, BASEMENT FIRE ALARM DEMOLITION PLAN
FA1.21 BUILDING 33, 1ST FLOOR FIRE ALARM DEMOLITION PLAN
FA1.22 BUILDING 44, 1ST & 2ND FLOOR FIRE ALARM DEMOLITION PLAN
FA1.23 BUILDING 45, 1ST FLOOR FIRE ALARM DEMOLITION PLAN
FA1.24 BUILDING 46, 1ST & 2ND FLOOR FIRE ALARM DEMOLITION PLAN
FA1.25 BUILDING 48, 1ST & 2ND FLOOR FIRE ALARM DEMOLITION PLAN
FA1.26 BUILDING 49, 1ST FLOOR FIRE ALARM DEMOLITION PLAN
FA1.27 BUILDING 53, 1ST & 2ND FLOOR FIRE ALARM DEMOLITION PLAN
FA1.28 BUILDING 54, 1ST FLOOR FIRE ALARM DEMOLITION PLAN
FA1.29 BUILDING 32, 34, 35, 37, 39 & 56 FIRE ALARM DEMOLITION PLAN
FA2.0 BUILDING 1, 1ST FLOOR FIRE ALARM NEW WORK PLAN
FA2.1 BUILDING 1, 2ND FLOOR FIRE ALARM NEW WORK PLAN
FA2.2 BUILDING 1, 3RD FLOOR FIRE ALARM NEW WORK PLAN
FA2.3 BUILDING 1, 4TH FLOOR FIRE ALARM NEW WORK PLAN
FA2.4 BUILDING 1, 5TH FLOOR FIRE ALARM NEW WORK PLAN
FA2.5 BUILDING 4, ATTIC, 1ST & 2ND FLOOR FIRE ALARM NEW WORK PLAN
FA2.6 BUILDING 7, BASEMENT, 1ST & 2ND FLOOR FIRE ALARM NEW WORK PLAN
FA2.7 BUILDING 8, 1ST FLOOR FIRE ALARM NEW WORK PLAN
FA2.8 BUILDING 9, 1ST FLOOR FIRE ALARM NEW WORK PLAN
FA2.9 BUILDING 10, 1ST FLOOR FIRE ALARM NEW WORK PLAN
FA2.10 BUILDING 11, 14, 19, & 21 FIRE ALARM NEW WORK PLAN
FA2.11 BUILDING 12 & 13 FIRE ALARM NEW WORK PLAN
FA2.12 BUILDING 20 & 36 FIRE ALARM NEW WORK PLAN
FA2.13 BUILDING 26 & 30 FIRE ALARM NEW WORK PLAN
FA2.14 BUILDING 28, 1ST FLOOR FIRE ALARM NEW WORK PLAN
FA2.15 BUILDING 28, 2ND FLOOR FIRE ALARM NEW WORK PLAN
FA2.16 BUILDING 28, 3RD FLOOR FIRE ALARM NEW WORK PLAN
FA2.17 BUILDING 28, PENTHOUSE & 4TH FLOOR FIRE ALARM NEW WORK PLAN
FA2.18 BUILDING 29, 1ST FLOOR FIRE ALARM NEW WORK PLAN
FA2.19 BUILDING 29, 2ND FLOOR FIRE ALARM NEW WORK PLAN
FA2.20 BUILDING 29, BASEMENT FIRE ALARM NEW WORK PLAN
GENERAL INFORMATION
GI100 COVER SHEET
GI200 SYMBOLS & ABBREVIATIONS
GI300 GENERAL NOTES & REFERENCES
GI301 UL ASSEMBLY REFERENCE FOR BASIS OF DESIGN
GI302 UL ASSEMBLY REFERENCE FOR BASIS OF DESIGN
ELECTRICAL
E0.0 ELECTRICAL GENERAL NOTES
E2.0 BUILDING 1, 1ST FLOOR ELECTRICAL NEW WORK PLAN
E2.1 BUILDING 7, BASEMENT ELECTRICAL NEW WORK PLAN
E2.2 BUILDING 9, 1ST FLOOR ELECTRICAL NEW WORK PLAN
E2.3 BUILDING 11 & 19 ELECTRICAL NEW WORK PLAN
E2.4 BUILDING 28, 1ST FLOOR ELECTRICAL NEW WORK PLAN
E2.5 BUILDING 35, 1ST FLOOR ELECTRICAL NEW WORK PLAN
FIRE PROTECTION
FA0.0 FIRE ALARM COVER SHEET, INDEX AND NOTES
FA0.1 FIRE ALARM LEGEND, DETAILS, AND EXISTING EVACUATION SEQUENCE
FA0.2 EXISTING CAMPUS FIRE ALARM NETWORK
FA0.3 NEW CAMPUS FIRE ALARM NETWORK
FA0.4 CONCEPTUAL RISER DIAGRAMS AND SEQUENCE OF OPERATIONS
FA0.5 CONCEPTUAL OUTBUILDING CONNECTION DIAGRAMS
FA1.0 BUILDING 1, 1ST FLOOR FIRE ALARM DEMOLITION PLAN
FA1.1 BUILDING 1, 2ND FLOOR FIRE ALARM DEMOLITION PLAN
FA1.2 BUILDING 1, 3RD FLOOR FIRE ALARM DEMOLITION PLAN
FA1.3 BUILDING 1, 4TH FLOOR FIRE ALARM DEMOLITION PLAN
FA1.4 BUILDING 1, 5TH FLOOR FIRE ALARM DEMOLITION PLAN
FA1.5 BUILDING 4, ATTIC, 1ST & 2ND FLOOR FIRE ALARM DEMOLITION PLAN
FA1.6 BUILDING 7, BASEMENT, 1ST & 2ND FLOOR FIRE ALARM DEMOLITION PLAN
FA1.7 BUILDING 8, 1ST FLOOR FIRE ALARM DEMOLITION PLAN
FA1.8 BUILDING 9, 1ST FLOOR FIRE ALARM DEMOLITION PLAN
FA1.9 BUILDING 10, 1ST FLOOR FIRE ALARM DEMOLITION PLAN
FA1.10 BUILDING 11, 14, 19, & 21 FIRE ALARM DEMOLITION PLAN
FA1.11 BUILDING 12 & 13 FIRE ALARM DEMOLITION PLAN
FA1.12 BUILDING 20 & 36 FIRE ALARM DEMOLITION PLAN
FA1.13 BUILDING 26 & 30 FIRE ALARM DEMOLITION PLAN
FA1.14 BUILDING 28, 1ST FLOOR FIRE ALARM DEMOLITION PLAN
FA1.15 BUILDING 28, 2ND FLOOR FIRE ALARM DEMOLITION PLAN
WOOD
ALUMINUM
STEEL
EARTH
CONCRETE MASONRY UNITS
RIGID INSULATION
CONCRETE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
BRICK
WOOD-FINISHED
WOOD ROUGH
PLYWOOD
GYPSUM - PLASTER
ACOUSTIC TILE
CAST STONE
ALL METALS - SMALL SCALE
GLASS - LARGE SCALE
BATT INSULATION
CERAMIC TILE
CARPET
GRAVEL
CENTER LINE
DETAIL INDICATOR
DETAIL INDICATIOR
DIMENSION LINE
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
ELEVATION INDICATOR, INTERIOR, SINGLE VIEW
SECTION INDICATOR
TYPICAL DETAIL INDICATOR
COLUMN GRID
KEYNOTE
NORTH ARROW
A
DETAIL NUMBER
SHEET WHERE
DRAWN
XXxxx
XXxxx
X
DRAWING TITLE
SCALE: 1 1/2" = 1'-0"
1 1/2"
XXxxx
XXxxx
XXxxx
REVISION
REVISION CLOUD
NORTH
BREAK LINE
DEMOLITION KEYNOTE
A
XXxxx
D
BC
COLUMN NUMBER
COLUMN LETTER
XXxxx
ELEVATION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
SHEET WHERE
DRAWN
ELEVATION NUMBER
DOOR / BORROWED LIGHT TAG
FURNITURE, FIXTURE, & EQUIPMENT TAG
WALL/PARTITION TAG
x'-x" VERTICAL HEIGHT INDICATOR
ROOM NAME
3333333333
150 SF
500 SF
ROOM NAME
150 SF
A3
ROOM NUMBER
ROOM AREA
PROGRAM AREA
D1
E EAST, EXISTING
EA EXHAUST AIR, EACH
EC EPOXY COATING
EFS EXTERIOR FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATION
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
ERF EPOXY RESIN FLOORING
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXIST EXISTING
EXP EXPANSION, EXPOSED DIVIDER STRIPS
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FC FLUOROCARBON
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FG FOOT GRILLE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FM FLOOR MATS & FRAMES
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FP FOLDING PANEL PARTITION
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE, FEATURE STRIPS
FT FOOT OR FEET, FLOOR TILE MOSAIC
FTCT CERAMIC MOSAIC TILE
FTG FOOTING
FUR FURRING
FUT FUTURE
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GCMU GLAZED FACE CMU
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GT GRANITE
GUMU GLASS MASONRY UNIT
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWD HARDWOOD
HDWR HARDWARE
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HPDL PLASTIC LAMINATE
HR HANDRAIL, HOUR
HSPL HIGH STRENGTH PLASTER
HT HEIGHT
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER /
DIMENSION
IN INCH
INCL INCLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KC PLASTER KEENE CEMENT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LG LONG
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LL LEAD LINED
LLV LONG LEG VERTICAL
LM LATEX MASTIC FLOORING
LMC LINEAR METAL CEILING
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
LWC LINEAR WOOD CEILING
M MORTAR
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MB MARBLE
MC MULTI-COLOR COATING
MECH MECHANICAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
MTL METAL
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NF NATURAL FINISH
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND, OVERHEAD
OPNG OPENING
OPP OPPOSITE
OZ OUNCE
P PAINT
PAV PAVING
PC PRECAST CONCRETE
PCT PORTLAND CEMENT TERRAZZO
PFW POLYPROPYLENE FABRIC WALLCOVERING
PL PLATE, PLASTER
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLYWD PLYWOOD
PMF PREMOLDED FILLER, PERFORATED METAL
FACING (TILE OR PANELS)
PPT PORCELAIN PAVER TILE
PR PAIR
PT POINT
PTN PARTITION
PVT PAVER TILE
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER BASE
RCP REFLECTED CEILING PLAN,
RADIANT CEILING PANEL SYSTEM
RD ROOF DRAIN
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RL ROOF LEADER
RM ROOM
RO ROUGH OPENING
RST RESILIENT STAIR TREAD
RT RUBBER TILE FLOORING
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE, HIGH GLAZED COATING,
STRUCTURAL CLAY
SCHED SCHEDULE
SCT FACING TILE
SDG SUSPENSION DECORATIVE GRIDS
SECT SECTION
SF SQUARE FEET, STONE FLOORING
SFTU GLAZED STRUCTURAL FACING TILE
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SLG SPANDREL GLASS
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
ST STAIN
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
T&G TONGUE AND GROOVE
TEL TELEPHONE
TEMP TEMPERED
TGC TEXTURED GYPSUM CEILING PANEL
THK THICK
TIL TECHNICAL INFORMATION LIBRARY (VA)
TMC TEXTURED METAL CEILING PANEL
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TST THIN SET TERRAZZO
TT TERRAZZO TILE
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
VB VAPOR BARRIER, VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VP VENEER PLASTER
VSF VINYL SHEET FLOORING
VTR VENT THRU ROOF
W WEST, VINYL COATED FABRIC
WALLCOVERING
W/ WITH
WB WALL BORDER
WD WOOD
WF FABRIC WALLCOVERING
W/O WITHOUT
WP WATERPROOF
WSF VINYL SHEET FLOORING (WELDED SEAMS)
WT WEIGHT
WWF WELDED WIRE FRAME
NOTES
1. ALL ABBREVIATIONS SHOWN MAY NOT BE USED ON THIS PROJECT.
2. CERTAIN COMMON ABBREVIATIONS MAY NOT BE SHOWN.
3. TEXT IN BOLD DENOTES ABBREVIATIONS FROM THE TIL.
L
& AND
@ AT
C CENTERLINE
# NUMBER, POUND
AA ANODIZED ALUMINUM, NATURAL FINISH
AAC ANODIZED ALUMINUM, COLORED
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJUSTABLE
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFP ACCORDION FOLDING PARTITION
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
ALT ALTERNATE
ALUM ALUMINUM
AMP ACOUSTICAL METAL PLAN CEILING
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AT ACOUSTICAL CEILING TILE
AT (SP) ACOUSTICAL CEILING, SPECIAL FACED
AUTO AUTOMATIC
AVG AVERAGE
AWF ACOUSTICAL WALLCOVERING
AWP ACOUSTICAL WALL PANEL
AWT ACOUSTICAL WALL TREATMENT
BD BOARD
BE BAKED ON ENAMEL
BEL BELOW
BF BRICK FLOORING
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BP BRICK PAVING
BR BUMPER RAIL, BRICK FACE
BRG BEARING
BRK BRICK
C, CONC CONCRETE
CAB CABINET
CAF CARPET ATHLETIC FLOORING
CB CATCH BASIN
CCT CUBICLE CURTAIN TRACK
CEM CEMENT
CG CORNER GUARD
CGFB CERAMIC GLAZED FACING BRICK
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CLOSET
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
CONF CONFERENCE
CONT CONTINUOUS
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CARPET
CPT CARPET MODULE TILE
CT CERAMIC TILE
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DS MB DIVIDER STRIPS, MARBLE
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
OCMI
6110 EXECUTIVE BLVD.
SUITE 200
ROCKVILLE, MD 20852
202-229-0530
CONSULTANT:
COFFMAN ENGINEERS
8171 MAPLE LAWN BLVD.
SUITE 320
FULTON, MD 20759
202-655-4035
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
THOMAS E. CREEK VA MEDICAL CENTER
6010 West Amarrilo Blvd.
Amarillo, TX 79106
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
SEALED WITH SIGNATURE
05/26/2023
504-20-105
JSAL
UPGRADE FIRE ALARM SYSTEM AT
THOMAS E. CREEK
VA MEDICAL CENTER
BID SET SUBMISSION
SYMBOLS & ABBREVIATIONS
GI200
-2
-1
G I2
.p d f
SYMBOLS OF MATERIALS DRAWING KEY ARCHITECTURAL ABBREVIATIONS
G1 ITEMS AND CONDITIONS NOTED, DETAILED, OR OTHERWISE IDENTIFIED ON DRAWINGS ARE APPLICABLE AND BINDING TO SIMILAR CONDITIONS ON ALL DRAWINGS. FOR CONDITIONS NOT NOTED OR NOT DETAILED, PROVIDE MATERIALS OF EQUAL QUALITY AND PERFORMANCE TO OTHER SIMILAR CONDITIONS
ON THE JOB.
G2 SECTIONS SHOWN ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE INDEXED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR SECTIONS THROUGHOUT THE PROJECT WHICH DO NOT HAVE SPECIFIC SECTIONS DRAWN. THE MOST SIMILAR SECTION SHALL BE ADAPTED TO ANY SECTION NOT DETAILED. ANY SPECIFIC QUESTIONS CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE ABOVE SHOULD BE DIRECTED TO
THE ARCHITECT DURING THE BID PERIOD.
G3 ALL CONSTRUCTION IS TO BE ASSUMED NEW AND FURNISHED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED OTHERWISE.
G4 REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR NOTES PERTAINING TO THEIR PARTICULAR TRADES. COORDINATE THE WORK OF ALL TRADES AND REPORT TO THE ARCHITECT ANY PERCEIVED DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING SEQUENCES OF CONSTRUCTION AND MEANS AND METHODS FOR HOW TO PERFORM THE WORK REQUIRED IN THE CONTRACT DOCUMENTS. ALL CONTRACTORS SHALL CAREFULLY REVIEW ALL EXISTING CONDITIONS AND DETERMINE THE MOST FEASIBLE SEQUENCE FOR PERFORMING THE NEW WORK SO AS TO AVOID CONFLICTS IN THE FIELD.
G5 ANY AREAS OR SPACES NOT CLEARLY DEFINED OR INDICATED BY NOTES SHALL BE OF SAME MATERIAL AND FINISH AS AREAS OF SIMILAR USE OR FUNCTION
ELSEWHERE IN THE BUILDING.
G6 WALL AND CEILING FINISHES SHALL INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, PILASTERS AND OTHER SIMILAR ITEMS.
G7 ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, WINDOWS, DUCTS, FRAMES, LOUVERS, GRILLES, MECHANICAL WORK, ETC., SHALL FIT SNUGLY AND BE THOROUGHLY SEALED AROUND PERIMETERS. INSTALL FIRE SEALANT AROUND ALL PENETRATIONS THROUGH FLOORS, FIRE RATED WALLS AND SMOKE PARTITIONS. WORK AT EXTERIOR WALLS SHALL BE FLASHED OR OTHERWISE WATERPROOF SEALED.
G8 FIELD CHECK ROUGH AND/OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF CABINETS, COUNTERS, STOREFRONT, DOORS, FRAMES, FIXTURES, MILLWORK AND ALL OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATION. PROVIDE AND INSTALL NECESSARY FILLER STRIPS, SCRIBE STRIPS, BASES, CLOSURES, FINISHES AND TRIM TO COMPLETE SUCH INSTALLATIONS. DIMENSIONS OF SUCH INSTALLATIONS SHALL BE CONSIDERED "NOMINAL".
CONTRACTORS SHALL ACCOUNT FOR ALL MANUFACTURER'S REQUIRED TOLERANCES, CLEARANCES AND SHIM SPACE TO ENSURE PROPER INSTALLATION
OF THE NEW WORK.
G9 SEE EQUIPMENT PLANS AND FLOOR PLANS FOR CASEWORK, CABINETS, MILLWORK AND OTHER BUILT-IN ITEMS. COORDINATE WITH MEP DRAWINGS FOR
SINKS, OUTLETS, AND OTHER ITEMS TO BE BUILT INTO SUCH ITEMS.
G10 IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS OF DIFFERENT SCALES, CONSULT ARCHITECT FOR CLARIFICATION.
G11 IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS AND/OR SPECIFICATIONS, THE MORE STRINGENT (TYPICALLY THE MORE COSTLY) REQUIREMENT SHALL APPLY. ITEMS DESCRIBED ON DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. CONTRACTOR SHALL BE RESPONSIBLE TO SUBMIT AN RFI TO SEEK CLARIFICATION OF ANY PERCEIVED DISCREPANCY DURING BID PHASE.
G12 WRITTEN INFORMATION ON DRAWINGS TAKES PRECEDENT OVER DRAWING LINES.
G13 IN THE ABSENCE OF A WRITTEN DIMENSION, OR IN CASE OF DOUBT AS TO THE PROPER MEASUREMENT, CONSULT ARCHITECT. DO NOT SCALE DRAWINGS.
ASSUMPTIONS MADE, OR ACTIONS TAKEN, BASED ON SCALED DIMENSIONS SHALL BE AT THE CONTRACTOR'S RISK AND ANY RESULTING CORRECTIONS
SHALL BE PERFORMED BY CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
G14 EACH CONTRACTOR OR SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE WORK OF OTHER TRADES SHOWN THROUGHOUT THE COMPLETE SET OF CONTRACT DOCUMENTS. CHANGES RESULTING FROM A CONTRACTOR OR SUB-CONTRACTOR'S FAILURE TO OBTAIN AND REVIEW A COMPLETE SET OF CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
G15 AT ALL CHANGES IN FLOOR FINISHES, PROVIDE AND INSTALL AN APPROPRIATE TRANSITION STRIP AS SHOWN ON THE DRAWINGS.
G16 CONSULT HVAC AND ELECTRICAL DRAWINGS FOR LOCATIONS AND DESCRIPTIONS OF ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILINGS OR FLOORS AND PROVIDE NECESSARY LINTELS, SUPPORT OR A
NCHORING.
G17 ELECTRIC SWITCHES, OUTLETS, THERMOSTATS, CONTROLS, CLOCKS, SPEAKERS, OR OTHER WALL-MOUNTED ACCESSORIES SHALL BE INSTALLED IN LOCATIONS WHICH ARE UNOBSTRUCTED BY CABINETS, COUNTERS, RACKS, MARKER AND TACKBOARDS, FIXTURES, SHELVING OR OTHER FURNISHING OR EQUIPMENT DESIGNATED FOR SPACES SHOWN ON DRAWINGS. ITEMS FOR WALL-MOUNTING ARE NOT TO BE INSTALLED ON, THROUGH, OR INTO, ANY
EQUIPMENT OTHER THAN WALLS, UNLESS SPECIFICALLY NOTED OTHERWISE.
G18 ELECTRICAL OUTLETS, CLOCKS, P.A. SPEAKERS, PULL STATIONS, EXIT SIGNS, OR OTHER DEVICES SHOWN DIAGRAMMATICALLY ON THE ARCHITECTURAL DRAWINGS SERVE TO ALERT CONTRACTORS OF THE PRESENCE OF SUCH DEVICES. CONSULT THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION AND ADVISE ARCHITECT OF ANY PERCEIVED DISCREPANCY BETWEEN ARCHITECTURAL AND ELECTRICAL DRAWINGS REGARDING LOCATION OR TYPE OF
DEVICES SHOWN PRIOR TO PREPARING SUBMITTALS.
G19 ELECTRIC SWITCHES, THERMOSTATS OR OTHER ELECTRONIC CONTROLS IN THE SAME VICINITY SHALL BE MOUNTED AT THE SAME HEIGHT FROM FLOOR
(UNLESS NOTED OTHERWISE) IN A UNIFORM, ORDERLY FASHION.
G20 SUBMITTAL REVIEW - THE CONTRACT DOCUMENTS PROVIDE SIZES, DIMENSIONS, PRODUCT REQUIREMENTS, ETC. CONTRACTOR SHALL VERIFY THAT SUBMITTALS ARE COORDINATED WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS PRIOR TO SUBMISSION. A/E REVIEW OF SUBMITTALS IS NOT FOR THE PURPOSE OF DETERMINING THAT SIZES, DIMENSIONS, ETC MATCH WHAT HAS ALREADY BEEN PROVIDED IN THE CONTRACT DOCUMENTS. ALL DEVIATIONS FROM WHAT IS SHOWN ON THE CONTRACT DOCUMENTS SHALL BE CLOUDED ON THE SUBMITTAL OR OTHERWISE CLEARLY BROUGHT TO THE A TTENTION OF THE REVIEWER. FAILURE TO CLEARLY BRING ANY DEVIATION(S) TO THE ATTENTION OF THE REVIEWER SHALL BE UNDERSTOOD BY ALL PARTIES THAT WHAT IS SHOWN IN THE SUBMITTAL COMPLIES WITH THE CONTRACT DOCUMENTS REGARDLESS OF WHETHER OR NOT THE REVIEWER DISCOVERS THE DEVIATION. CHANGES RESULTING FROM THE CONTRACTOR'S FAILURE TO CLEARLY IDENTIFY DEVIATIONS IN SUBMITTALS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY AND SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
G21 CONTRACTORS SHALL CAREFULLY REVIEW EXISTING FIELD CONDITIONS AND COORDINATE ALL QUANTITIES, DIMENSIONS, AND TOLERANCES REQUIRED TO PERFORM THE WORK SHOWN ON THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFORMATION THAT PERTAINS SOLELY TO FABRICATION PROCESSES, INSTALLATION TECHNIQUES (MEANS AND METHODS), AND SEQUENCING OF THE WORK TO MEET THE REQUIREMENTS OF THE PROJECT SCHEDULE. EACH SUBCONTRACTOR SHALL COORDINATE WITH OTHER TRADES PRIOR TO BEGINNING THEIR PORTION OF THE WORK.
G22 PUBLIC EXITS SHALL REMAIN CLEAR AT ALL TIMES WHILE THE BUILDING IS OCCUPIED. NO STORAGE SHALL BE PERMITTED IN THE EXIT ACCESS.
G23 PATCH ALL HOLES IN FLOORS, WALLS AND CEILINGS WITHIN THE PROJECT LIMITS AFTER DEMOLITION AND NEW WORK IS COMPLETE.
G24 UNLESS SPECIFIC DIMENSIONS ARE PROVIDED, MEP DRAWINGS ARE CONSIDERED "DIAGRAMMATIC". IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR(S) TO FIELD COORDINATE LOCATIONS, SEQUENCES, ETC FOR UNOBSTRUCTED INSTALLATION OF ITEMS THAT ARE SHOWN ON MEP DRAWINGS IN DIAGRAMMATIC FORM. COORDINATE ABOVE-CEILING WORK OF MEP TRADES TO THAT EACH TRADE LOCATES THEIR WORK AS TIGHT TO THE STRUCTURE / DECK ABOVE AS IS FEASIBLE. EACH SUCCESSIVE TRADE SHALL LOCATE THEIR WORK AS TIGHT TO THE TRADE BEFORE.
G25 THE DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY AND NEITHER SHALL TAKE PRECEDENT OVER THE OTHER. WHAT IS REQUIRED BY EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE INTERPRETED AS BEING REQUIRED AS PART OF THE SCOPE OF WORK FOR THIS PROJECT. ITEMS SPECIFIED, BUT NOT INDICATED ON THE DRAWINGS, SHALL BE PROVIDED. ITEMS SHOWN ON THE DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO SEEK CLARIFICATION PRIOR TO SUBMITTING A BID AMOUNT IF THERE SHOULD APPEAR TO BE A DISCREPANCY BETWEEN DRAWINGS AND/OR THE SPECIFICATIONS. OTHERWISE, THE MOST STRINGENT (TYPICALLY THE MOST EXPENSIVE) REQUIREMENT SHALL APPLY AT
THE DISCRETION OF THE COR.
G26 ABOVE-CEILING COORDINATION – PRIOR TO PERFORMING ANY ABOVE-CEILING WORK, CONTRACTOR, WORKING WITH ALL SUB-CONTRACTORS, SHALL CREATE DRAWINGS THAT SHOW COORDINATION OF ALL ABOVE-CEILING WORK ITEMS WITH EXISTING CONDITIONS AND PROPOSED CEILINGS. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE SEQUENCES OF INSTALLATION TO ENSURE THAT ABOVE-CEILING ITEMS CAN FIT ABOVE THE CEILING HEIGHTS INDICATED ON THE REFLECTED CEILING PLAN(S). CONTRACTOR SHALL BRING ALL PERCEIVED CONFLICTS TO THE ATTENTION OF THE ARCHITECT / ENGINEER FOR RESOLUTION PRIOR TO THE START OF THE WORK. CONFLICTS RESULTING FROM INACCURATE COORDINATION DRAWINGS AND / OR FAILURE TO IDENTIFY CONFLICTS PRIOR TO INSTALLATION OF THE WORK SHALL BE CORRECTED / ADJUSTED AT THE CONTRACTOR’S EXPENSE AND
SHALL RESULT IN NO ADDITIONAL COST TO THE GOVERNMENT.
1. PROVIDE TEMPORARY/ PERMANENT RATED ICRA PARTITIONS AS REQUIRED. CONTRACTOR SHALL SUBMIT AN ICRA PLAN FOR
APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS
SHALL AUTOMATICALLY LOCK UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL
ICRA DOORS.
4. CONTRACTOR TO COMPLY WITH ALL OSHA REQRUIEMENTS PERTAINING TO SILICA AND DUST CONTAINMENT/ REMEDIATION.
5. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
6. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, AND PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
7. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. BALL IN THEWALL IS NOT ACCEPTABLE FOR MONITORING.
8. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/ OR FIRE SEAL AS REQUIRED.
9. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
10. ALL PERSONNEL ENTERING WORK SITE ARE REQRUIED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH
TIME THE WORKER EXITS THE WORK AREA.
11. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
12. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630.
13. CONTRACTOR TO USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS THROUGH THE
FACILITY.
14. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
15. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
16. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT
RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
17. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISINFECTANT.
ICRA NOTES
1. VA DESIGN MANUAL (PG-18-0)
2. VA DESIGN, QUALITY, AND STANDARD ALERTS
3. VA DESIGN GUIDES (PG-18-12)
4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES
6. VA FIRE PROTECTION DESIGN MANUAL
7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)
8. VA SIGNAGE DESIGN GUIDE
9. NFPA 101: LIFE SAFETY CODE - LATEST VERSION
10. NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
11. NFPA 70: NATIONAL ELECTRICAL CODE
12. ASHRAE 62.1: VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
13. ASHRAE 90.1: ENERGY STANDARD FOR BUILDINGS
14. VA NATIONAL CAD STANDARD APPLICATION GUIDE
15. NFPA NATIONAL FIRE CODES (EXCEPT NFPA 5000 & 900)
16. VA MASTER SPECIFICATIONS
17. NEC NATIONAL ELECTRICAL CODE - LATEST VERSION
18. VA SUSTAINABLE DESIGN MANUAL
19. INTERNATIONAL BUILDING CODE (IBC) - LATEST VERSION
REFERENCES, CODES, AND STANDARDS
IN STRIVING TO PROVIDE A HEALTHY AND SAFE ENVIRONMENT AT VA FACILITIES, VHA IS
IMPLEMENTING A SMOKE-FREE POLICY FOR ALL VHA HEALTH CARE FACILITIES AND PROPERTY
ASSIGNED TO VHA THAT IS UNDER THE CHARGE AND CONTROL OF VA. THE POLICY APPLIES TO
CIGARETTES, CIGARS, PIPES OR ANY OTHER COMBUSTION OF TOBACCO, INCLUDING BUT NOT
LIMITED TO ELECTRONIC OR E-CIGARRETES, VAPE PENS OR E-CIGARS.
UNDER VHA DIRECTIVE 1085, ALL VHA HEALTH CARE FACILITIES WILL BE SMOKE-FREE FOR
PATIENTS, VISITORS, CONTRACTORS, VOLUNTEERS AND VENDORS EFFECTIVE OCTOBER 1, 2019.
SMOKING POLICY
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE, INCLUDING
SHARP CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR TO THE START OF THE
PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF
IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOUNTERED.
MEDICAL WASTE NOTES
ICRA REFERENCE NOTES
1. BARRIER WALLS:
a. THE CONSTRUCTION AREAS MUST BE KEPT SEPARATED FROM PATIENT CARE AREAS BY BARRIERS THAT KEEP THE
DUST AND DIRT INSIDE THE WORKSITE.
b. THE WALLS MUST PROVIDE A COMPLETE SEAL OF THE CONSTRUCTION AREA FROM ADJACENT AREAS (WALLS MAY BE
RIGID OR 4 OR 6 MIL THICKNESS PLASTIC).
2. ENVIRONMENTAL CONTROL:
a. NEGATIVE AIR PRESSURE MUST BE MAINTAINED WITHIN THE CONSTRUCTION AREA WHEN POSSIBLE. IF UNABLE TO
MAINTAIN NEGATIVE PRESSURE A HEPA AIR-SCRUBBER MUST BE USED AND LEFT ON FOR THE DURATION OF THE
PROJECT (24/7).
b. DEMOLITION DEBRIS IS REMOVED IN TIGHTLY FITTED COVERED CARTS – USE SPECIFIED TRAFFIC PATTERNS.
c. STICKY OR WALK-OFF MATS ARE PLACED IMMEDIATELY OUTSIDE THE CONSTRUCTION ZONE AND CHANGED WHENEVER
NECESSARY TO CONTROL THE SPREAD OF DUST AND DIRT.
d. EXTERIOR WINDOW SEALS ARE TO BE USED TO REDUCE THE AMOUNT OF OUTSIDE EXCAVATION DEBRIS COMING INTO
THE BUILDING.
e. IF DEMOLITION CHUTES ARE USED, THEY MUST BE SEALED WHEN NOT IN USE; THE CHUTE AND DAMPER SHOULD BE
SPRAYED WITH WATER, AS NECESSARY TO MAINTAIN DUST CONTROL.
f. CONTROL, COLLECTION AND DISPOSAL MUST BE PROVIDED FOR ANY DRAIN LIQUID OR SLUDGE FOUND WHEN
DEMOLISHING PLUMBING.
1. TRAFFIC CONTROL:
a. USE DESIGNATED ENTRY AND EXIT PROCEDURES.
b. KEEP ALL EGRESS PATHWAYS FREE OF DEBRIS.
c. NO UNAUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER CONSTRUCTION AREAS.
d. USE DESIGNATED ELEVATORS ONLY.
2. CLEANING:
a. KEEP THE CONSTRUCTION AREA CLEAN ON A DAILY BASIS.
b. DUST AND DIRT MUST BE KEPT TO A MINIMUM.
3. WORKERS:
a. CLOTHING MUST BE FREE OF LOOSE SOIL AND DEBRIS WHEN EXITING THE CONSTRUCTION AREA.
b. USE PERSONAL PROTECTIVE EQUIPMENT (MASKS, FACE SHIELDS, ETC.) AS INDICATED FOR THE TASK AT HAND.
ICRA MATRIX
CONSTRUCTION PROJECT TYPE
A B C D
LOW I II II III/IV
MEDIUM I II III IV
HIGH I II III/IV IV
HIGHEST II III/IV III/IV IV
PATIENT
RISK GROUP
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING
DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED
FOR VISUAL INSPECTION.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
1. CLEAN ANY DUST/DEBRIS GENERATED BY PROJECT.
C
LA
S
I
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST
FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST
WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK
AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
1. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
2. WET MOP AND/OR VACUUM WITH HEPA FILTERED
VACUUM BEFORE LEAVING WORK AREA.
3. REMOVE ISOLATION OF HVAC SYSTEM WHEN JOB IS
COMPLETED.
4. CLEAN TRACKED DUST/DEBRIS IN COMMON AREAS AS
NEEDED; CLEAN AREA AT THE END IF THE WORK DAY.
5. AREA SHOULD BE TERMINALLY CLEANED BY
ENVIRONMENTAL SERVICES PRIOR TO USE.
C
LA
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE
WORK IS BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK
AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM OR VACUUMING PRIOR
TO EXIT) BEFORE CONSTRUCTION BEGINS).
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS; OR
HEPA AIR SCRUBBER IF UNABLE TO ACHIEVE NEGATIVE
PRESSURE; FILTER CHANGED AS NEEDED.
4. MAINTAIN STICKY MATS AT ENTRANCE. AVOID TRACKING
DUST/DEBRIS OUTSIDE OF WORK AREA, CLEAN AREA AS
NEEDED.
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
PROJECT IS COMPLETED AND DIRT AND DEBRIS HAS
BEEN REMOVED.
2. WET MOP AND/OR VACUUM WORK AREA WITH HEPA
FILTERED VACUUM.
3. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
5. AREA SHOULD BE TERMINALLY CLEANED BY
ENVIRONMENTAL MANAGEMENT SERVICES
DEPARTMENT PRIOR TO USE
C
LA
II
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE
WORK IS BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK
AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM OR VACUUMING PRIOR
TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES
APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL
TO PASS THROUGH THIS ROOM SO THEY CAN BE
VACUUMED USING A HEPA VACUUM CLEANER BEFORE
LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR
PAPER COVERALLS THAT ARE REMOVED EACH TIME
THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE AREA
REQUIRED TO WEAR SHOE COVERS. SHOE COVERS
MUST BE CHANGED EACH TIME THE WORKER EXITS THE
WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
PROJECT IS COMPLETED PROJECT AND INSPECTED.
8. AREA SHOULD BE TERMINALLY CLEANED BY THE
OWNER’S ENVIRONMENTAL SERVICES DEPARTMENT
PRIOR TO USE.
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE
COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
C
LA
V
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
OCMI
6110 EXECUTIVE BLVD.
SUITE 200
ROCKVILLE, MD 20852
202-229-0530
CONSULTANT:
COFFMAN ENGINEERS
8171 MAPLE LAWN BLVD.
SUITE 320
FULTON, MD 20759
202-655-4035
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
THOMAS E. CREEK VA MEDICAL CENTER
6010 West Amarrilo Blvd.
Amarillo, TX 79106
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
SEALED WITH SIGNATURE
05/26/2023
504-20-105
JSAL
UPGRADE FIRE ALARM SYSTEM AT
THOMAS E. CREEK
VA MEDICAL CENTER
BID SET SUBMISSION
GENERAL NOTES & REFERENCES
GI300
-2
-1
G I3
.p d f
GENERAL NOTES
THROUGH PENETRATION FIRESTOP SYSTEMS
System No. W-L-1001 (June 15, 2005)
F Ratings: 1, 2, 3 and 4-Hr., T-Rating: 0, 1, 2, 3 and 4-Hr.
L Rating At Ambient: Less than 1 CFM/sq ft, L Rating At 400 F: Less than 1 CFM/sq ft
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.
1. Wall Assembly — The 1, 2, 3 or 4 hr fire-rated gypsum wallboard/stud wall assembly shall be constructed of the materials and in the manner described in the individual U300 or U400 Series Wall or Partition Designs in the UL Fire Resistance Directory and shall include the following construction features:
A. Studs — Wall framing may consist of either wood studs (max 2 h fire rated assemblies) or steel channel studs. Wood studs to consist of nom 2 by 4 in. (51 by 102 mm) lumber spaced 16 in. (406 mm) OC with nom 2 by 4 in. (51 by 102 mm) lumber end plates and cross braces. Steel studs to be min 3-5/8 in. (92 mm) wide by 1-3/8 in. (35 mm) deep channels spaced max 24 in. (610 mm) OC.
B. Gypsum Board* — Nom 1/2 or 5/8 in. (13 or 16 mm) thick, 4 ft. (122 cm) wide with square or tapered edges. The gypsum wallboard type, thickness, number of layers, fastener type and sheet orientation shall be as specified in the individual U300 or U400 Series Design in the UL Fire Resistance Directory. Max diam of opening is 26 in. (660 mm).
2. Through-Penetrant — One metallic pipe, conduit or tubing installed either concentrically or eccentrically within the firestop system.
The annular space between pipe, conduit or tubing and periphery of opening shall be min of 0 in / (0 mm). (point contact) to max 2 in.
(51 mm) Pipe, conduit or tubing to be rigidly supported on both sides of wall assembly. The following types and sizes of metallic pipes, conduits or tubing may be used:
A. Steel Pipe — Nom 24 in. (610 mm) diam (or smaller) Schedule 10 (or heavier) steel pipe.
B. Iron Pipe — Nom 24 in. (610 mm) diam (or smaller) service weight (or heavier) cast iron soil pipe, nom 12 in (305 mm) diam (or smaller) or Class 50 (or heavier) ductile iron pressure pipe.
C. Conduit — Nom 6 in. (152 mm) diam (or smaller) steel conduit or nom 4 in (102 mm) diam (or smaller) steel electrical metallic tubing D. Copper Tubing — Nom 6 in. (152 mm) diam (or smaller) Type L (or heavier) copper tubing E. Copper Pipe — Nom 6 in. (152 mm) diam (or smaller) Regular (or heavier) copper pipe.
F. Through Penetrating Product* — Flexible Metal Piping The following types of steel flexible metal gas piping may be used:
1. Nom 2 in. (51 mm) diam (or smaller) steel flexible metal gas piping. Plastic covering on piping may or may not be removed on both sides of floor or wall assembly.
OMEGA FLEX INC
2. Nom 1 in. (25 mm) diam (or smaller) steel flexible metal gas piping. Plastic covering on piping may or may not be removed on both sides of floor or wall assembly.
GASTITE, DIV OF TITEFLEX
3. Nom 1 in. (25 mm) diam (or smaller) steel flexible metal gas piping. Plastic covering on piping may or may not be removed on both sides of floor or wall assembly.
WARD MFG L L C
3. Fill, Void or Cavity Material* — Caulk or Sealant — Min 5/8. , 1-1/4,1-7/8 and 2-1/2 in. (16, 32, 48 and 64 mm) thickness of caulk for 1, 2, 3 and 4 hr rated assemblies, respectively, applied within annulus, flush with both surfaces of wall. Min 1/4 in. (6 mm) diam bead of caulk applied to gypsum board/penetrant interface at point contact location on both sides of wall. The hourly F Rating of the firestop system is dependent upon the hourly fire rating of the wall assembly in which it is installed, as shown in the following table.
The hourly T Rating of the firestop system is dependent upon the type or size of the pipe or conduit and the hourly fire rating of the wall assembly in which it is installed, as tabulated below:
+When copper pipe is used, T Rating is 0 h.
3M COMPANY — CP 25WB+ or FB-3000 WT.
THROUGH PENETRATION FIRESTOP SYSTEMS
System No. W-L-1054 (October 14, 2015)
F Rating: 1 and 2-Hr., T-Rating: 0-Hr.
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.
1. Wall Assembly — The 1 or 2 hr fire-rated gypsum wallboard/stud wall assembly shall be constructed of the materials and in the manner specified in the individual U300 or U400 Series Wall and Partition Designs in the UL Fire Resistance Directory and shall include the following construction features:
A. Studs — Wall framing may consist of either wood studs or steel channel studs. Wood studs to consist of nom 2 by 4 in. (51 by 102
mm) lumber spaced 16 in. (406 mm) OC. Steel studs to be min 2-1/2 in. (64 mm) wide and spaced max 24 in. (610 mm) OC. When steel studs are used and the diam of opening exceeds the width of stud cavity, the opening shall be framed on all sides using lengths of steel stud installed between the vertical studs and screw-attached to the steel studs at each end. The framed opening in the wall shall be 4 to 6 in. (102 to 152 mm) wider and 4 to 6 in. (102 to 152 mm) higher than the diam of the penetrating item such that, when the penetrating item is installed in the opening, a 2 to 3 in. (51 to 76 mm) clearance is present between the penetrating item and the framing on all four sides.
B. Gypsum Board* — 5/8 in. (16 mm) thick, 4 ft (122 cm) wide with square or tapered edges. The gypsum board type, thickness, number of layers, fastener type and sheet orientation shall be as specified in the individual U300 or U400 Series Design in the UL Fire Resistance Directory. Max diam of opening is 32-1/4 in. (819 mm) for steel stud walls. Max diam of opening is 14-1/2 in. (368 mm) for wood stud walls.
The F and FH Ratings of the firestop system are equal to the fire rating of the wall assembly.
2. Through-Penetrants — One metallic pipe, conduit or tubing to be installed either concentrically or eccentrically within the firestop system. The annular space shall be min 0 in. to max 2-1/4 in. (57 mm). Pipe may be installed with continuous point contact. Pipe, conduit or tubing to be rigidly supported on both sides of wall assembly. The following types and sizes of metallic pipes, conduits or tubing may be used:
A. Steel Pipe — Nom 30 in. (762 mm) diam (or smaller) Schedule 10 (or heavier) steel pipe.
B. Iron Pipe — Nom 30 in. (762 mm) diam (or smaller) cast or ductile iron pipe.
C. Conduit — Nom 4 in. (102 mm) diam (or smaller) steel electrical metallic tubing or 6 in. (152 mm) . diam steel conduit.
D. Copper Tubing — Nom 6 in. (152 mm) diam (or smaller) Type L (or heavier) copper tubing.
E. Copper Pipe — Nom 6 in. (152 mm) diam (or smaller) regular (or heavier) copper pipe.
3. Fill, Void or Cavity Material* — Sealant — Min 5/8 in. (16 mm) thickness of fill material applied within the annulus, flush with both surfaces of wall. At the point or continuous contact locations between pipe and wall, a min 1/2 in. (13 mm) diam bead of fill material shall be applied at the pipe wall interface on both surfaces of wall.
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — FS-One Sealant or FS-ONE MAX Intumescent Sealant
THROUGH PENETRATION FIRESTOP SYSTEMS
System No. W-L-2225 (December 06, 2001)
F Rating: 2-Hr., T-Rating: 2-Hr.
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.
1. Wall Assembly — The 2 hr fire-rated gypsum board/stud wall assembly shall be constructed of the materials and in the manner specified in the individual U300 or U400 Series Wall and Partition Designs in the UL Fire Resistance Directory and shall include the following construction features:
A. Studs — Wall framing may consist of either wood studs or steel channel studs. Wood studs to consist of nom 2 by 4 in. lumber spaced 16 in.
OC. Steel studs to be min 2-1/2 in. wide and spaced max 24 in. OC.
B. Gypsum Board* — Two layers of nom 1/2 or 5/8 in. thick gypsum board, as specified in the individual Wall and Partition Design. Max diam of opening is 4 in.
2. Through Penetrants — One nonmetallic pipe to be installed either concentrically or eccentrically within the firestop system Pipe to be rigidly supported on both sides of the wall assembly. The following types and sizes of nonmetallic pipes may be used:
A. Polyvinyl Chloride (PVC) Pipe — Nom 1-1/2 in. diam (or smaller) Schedule 40 solid core PVC pipe for use in closed (process or supply) or vented (drain, waste or vent) piping systems. The annular space between pipe and periphery of opening shall be min 1/4 in. to max 5/8 in.
B. Polyvinyl Chloride (PVC) Pipe — Nom 2 in. diam (or smaller) Schedule 40 solid core PVC pipe for use in closed (process or supply) or vented (drain, waste or vent) piping systems. The annular space between pipe and periphery of opening shall be min 11/16 in. to max 15/16 in.
3. Firestop System — The firestop system shall consist of the following:
A. Packing Material — (Optional) — Foam backer rod firmly packed into the opening as a permanent form. Packing material to be recessed from both surfaces of wall as required to accomodate the required thickness of fill material.
B. Fill, Void or Cavity Material* — Caulk — Min 1 in. thickness of fill material applied within the annulus, flush with both surfaces of wall.
Additional fill material to be installed such that a min 3/8 in. crown is formed around the penetrating item.
UNITED STATES GYPSUM CO — Type IA
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
OCMI
6110 EXECUTIVE BLVD.
SUITE 200
ROCKVILLE, MD 20852
202-229-0530
CONSULTANT:
COFFMAN ENGINEERS
8171 MAPLE LAWN BLVD.
SUITE 320
FULTON, MD 20759
202-655-4035
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
THOMAS E. CREEK VA MEDICAL CENTER
6010 West Amarrilo Blvd.
Amarillo, TX 79106
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
SEALED WITH SIGNATURE
05/26/2023
504-20-105
AuthorChecker
UPGRADE FIRE ALARM SYSTEM AT
THOMAS E. CREEK
VA MEDICAL CENTER
BID SET SUBMISSION
UL ASSEMBLY REFERENCE FOR
BASIS OF DESIGN
GI301
-2
-1
G I3
/0
/2
.p d f
GENERAL NOTES
PENETRATION THROUGH FIRE-RATED WALLS AND FLOORS:
A. ALL PENETRATIONS THROUGH FIRE-RATED FLOORS AND WALLS SHALL BE FIRE- STOPPED
WITH AN UNDERWRITERS LABORATORY (UL) TESTED "THROUGH PENETRATION FIRE-STOP
SYSTEM" RATED EQUAL TO OR GREATER THAN THE FIRE RATING OF THE FLOOR OR WALL
BEING PENETRATED.
B. UL ASSEMBLIES AND FIRE SEALANT MANUFACTURERS ARE REPRESENTED ON THIS SHEET
AS FOR REFERENCE ONLY AND USED AS THE BASIS OF DESIGN (BOD) ONLY.
XHEZ - THROUGH PENETRATION FIRESTOP SYSTEM
System No. F-A-3064
(February 09, 2018)
1. Floor Assembly — Min 4-1/2 in. (114 mm) thick reinforced lightweight or normal weight (100-150 pcf or 1600-2400 kg/m3) concrete floor. Floor may also be constructed of any min 6 in. (152 mm) thick hollow core Precast Concrete Units*. Max diam of opening is 4-1/2 in. (114 mm).
See Precast Concrete Units (CFTV) category in the Fire Resistance Directory for names of manufacturers.
2. Steel Sleeve — Nom 1-1/2 (38 mm), 2 in. (51 mm), 3 in. (76 mm) or 4 in. (102 mm) diam steel electrical metallic tubing (EMT), steel conduit, Schedule 5 (or heavier) steel pipe sleeve. Sleeve shall be cast or grouted into floor, flush with floor surfaces or extending down to 3 in. (76 mm) beyond the bottom surface of the floor. When sleeve projects from floor surface, it may be provided with a metallic or nonmetallic conduit bushing.
3. Cables — Cables may represent a min 50 to max 100 percent visual fill within the loading area for the sleeve. Cables to be rigidly supported on both sides of the floor assembly. Any combination of the following types and sizes of cables may be used:
A. Max 400 pair No. 24 AWG (or smaller) copper conductor telecommunication cable with polyvinyl chloride (PVC) or plenum-rated jacketing and insulation.
B. Max 750 kcmil single copper conductor power cable with XLPE jacket and insulation.
C. Max 7/C No. 12 AWG copper conductor control cable with PVC or XLPE jacket and insulation.
D. Max 3/C No. 2/0 AWG metal clad or armored cable with steel or aluminum jacket.
E. Max 3/C No. 8 AWG NM cable (Romex) with PVC insulation and jacket.
F. Max four pair No. 22 AWG (or smaller) copper conductor data cable with PVC or plenum rated jacketing and insulation.
G. Max four pair No. 22 AWG (or smaller) Cat 5, Cat 5E, Cat 6 or Cat 6A cable with PVC or plenum rated jacketing and insulation.
H. Coaxial cable with fluorinated ethylene or PVC insulation and jacketing having a max diam of 5/8 in. (16 mm).
I. Optical fiber cable with PVC or polyethylene (PE) jacket and insulation and having a max diam of 5/8 in. (16 mm).
J. Max RG6/U coaxial cable with fluorinated ethylene, polyethylene (PE), PVC or plenum rated jacketing and insulation.
4. Firestop System — The firestop system shall consist of the following:
A. Firestop Device* — A firestop device consisting of a rectangular galv steel housing with intumescent curtain sized to the specific diam of the sleeve.
Firestop device installed in accordance with the accompanying installation instructions on the top surface of the floor. Firestop device secured to the top surface of the floor using provided anchor tabs by means of 1/4 in. (6.4 mm) diam by 1-1/4 in. (32 mm) long steel concrete anchors in conjunction with min 1 in. (25 mm) diam steel fender washers. As an alternate to the steel concrete screws, nom 1-1/4 in. (32 mm) long steel powder actuated fasteners provided with 3/4 in. (19 mm) diam steel washers or nom 3/4 in. (19 mm) long steel powder actuated fasteners provided with 1 in. (25 mm) diam steel washers may be used to secure anchor tabs.
SPECIFIED TECHNOLOGIES INC — EZ PATH Retrofit Device EZDR200 or EZDR400
A1. Firestop Device* — (Not Shown) — When nom 1-1/2 in. (38 mm) or nom 3 in. (76 mm) diam steel sleeve is used, an appropriately sized steel plate adaptor kit shall be used in conjunction with Item 4A. The steel plate shall be installed in accordance with the accompanying installation instructions.
SPECIFIED TECHNOLOGIES INC — EZ PATH Retrofit Device Plate Kit EZPR150 or EZPR300
B. Fill, Void or Cavity Material* - Sealant or Putty — (Optional, Not Shown) Any existing XHHW sealant or putty either partially or fully installed into one or both ends of the steel sleeve.
C. Fill, Void or Cavity Material* - Sealant or Putty — (Optional, Not Shown) - Min 1/2 in. (13 mm) thickness of sealant or putty applied within annulus, flush with the top surface of the steel sleeve.
SPECIFIED TECHNOLOGIES INC — SpecSeal Series SSS Sealant, SpecSeal LC150 Sealant, SpecSeal LCI Sealant, SpecSeal SIL300 Sealant or SpecSeal Putty
5. Batts and Blankets* — Two min 12 in. (305 mm) wide layers of nom 2 in. (51 mm) thick nom 1 pcf (16 kg/m3) fiberglass duct wrap insulation installed around device and cables. Insulation to be tightly butted to the top surface of the floor and all longitudinal seams of duct wrap are to be sealed with foil tape.
See Batts and Blankets (BKNV) category in the Building Materials Directory for names of manufacturers. Any batts and blankets material meeting the above specifications and bearing the UL Classification Marking with a Flame Spread Index of 25 or less and a Smoke Developed Index of 50 or less may be used.
When Item 5 is used at a min height of 18 in. (457 mm) the T, FT and FTH Ratings are 1-1/4 Hr. When Item 5 is used at a min height of 36 in. (914 mm), the T, FT and FTH Ratings are 2 Hr.
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.
1. Floor or Wall Assembly — Min 4-1/2 in. (114 mm) thick reinforced lightweight or normal weight (100-150 pcf or 1600-2400 kg/m3 ) concrete. Wall may also be constructed of any UL Classified Concrete Blocks*. Max diam of opening is 14 in. (356 mm).
See Concrete Blocks (CAZT) category in the Fire Resistance Directory for names of manufacturers.
2. Through Penetrants — One nonmetallic pipe to be installed within the opening. A nom annular space of 5/8 in. (16 mm) is required within the firestop system. Pipe to be rigidly supported on both sides of floor or wall assembly. The following types and sizes of nonmetallic pipe may be used:
A. Polyvinyl Chloride (PVC) Pipe — Nom 12 in. (305 mm) diam (or smaller) Schedule 40 solid core PVC pipe for use in closed (process or supply) or vented (drain, waste…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .