This is a technical drawings document for Harnett County, North Carolina's Sheriff's Office and Detention Center Generator project. The file contains detailed engineering drawings and specifications for the installation of a new 1250 kW standby generator system that will provide backup power to the entire Sheriff's Office and Detention Center facility. The project scope includes furnishing and installing the generator unit, an automatic transfer switch, and new power distribution equipment as required by the project specifications. The drawings provide the technical layouts, electrical schematics, and installation requirements necessary for bidders to prepare accurate proposals and for contractors to execute the work according to design standards.
The drawings serve as the primary reference document for all bid submissions and subsequent construction activities. These technical specifications ensure that all bidders have a clear understanding of the exact equipment, installation methods, and performance requirements expected for this critical infrastructure project. The detailed nature of these drawings allows contractors to accurately estimate material costs, labor requirements, and project timelines. Additionally, the drawings include provisions for an alternate bid option related to replacing the existing Main Distribution Panel (MDP), giving the County flexibility in project scope and cost considerations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026.05.15 Harnett Sheriff Generator Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VALUE
VALUE
G-001
COVER SHEET
A
54321
B
C
D
E
KEY PLAN
APPROVED BY
CHECKED BY
REVISIONS
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SCALE
SEAL
NO. DESCRIPTION DATE
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F'
S O
FF
IC
E
D
ET
EN
TI
O N
C
EN
TE
R
G
EN
ER
AT
O R
BA
IN
S T, LI
LL
IN
G
TO
N
, N C
IS
SU
ED
F
O R
B
ID
05/14/2026
50190536
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
5/
/2
:1 3:
A
M P:
\5
6\ C
AD
\L
EA
D
S H
EE
TS
\5
G
-0
C O
VE
R
S H
EE
T.
D W
G
MEP:
175 BAIN ST, LILLINGTON, NC 27546
Sheriff's Office &
HARNETT COUNTY
Detention Center Generator
CAMPUS MAP
OWNER:
VICINITY MAP CONTACTS
DRAWING INDEX
DEWBERRY ENGINEERS, INC.
2610 WYCLIFF ROAD
SUITE 410
RALEIGH, NC 27607
CONTACT:
DAVID SHERK, PE
P: 984.884.4092 F: 252.904.9469 E-MAIL: dsherk@dewberry.com
HARNETT COUNTY
SHERIFFS OFFICE
175 BAIN ST, LILLINGTON,
NC 27546
CONTACT:
CAPTAIN JEFFREY
ARMSTRONG
P: 910-893-9111 F: 910-893-0104 EMAIL:jarmstrong@harnett.org
The intent of the project is to provide a generator that will be capable of operating the Sheriffs Office and Detention Center in its entirety during a utility power outage. The scope includes providing a 1250kW generator and a 2000A open transition automatic transfer switch that will serve this purpose. In order to achieve this goal a new nema 3r switch gear and enclosed circuit breaker will also be provided and located outside adjacent to the transformer and transfer switch. The new switchgear will feed the MDP inside the building and the two existing air cooled chillers. The existing conduits from the utility owned pad-mounted transformer will be reused. During construction a temporary distribution panel will be connected to the new generator and be used to operate the facility. An alternate scope will consist of replacing the existing 2000A MDP with a new 2000A MDP
PROJECT SCOPE
Sheet Number Sheet Title
G-001 COVER SHEET
G-002 BUILDING CODE SUMMARY
LG001 NOTES LEGENDS AND ABBREVIATIONS
L200 SITE PLAN VIEWS
L300 DETAILS
E-001 SYMBOLS & ABBREVIATIONS
E-002 NOTES
ED101 ELECTRICAL SITE DEMOLITION PLAN
E-101 ELECTRICAL SITE PLAN
E-111 ELECTRICAL ROOM COMBINED PLAN
E-501 DETAILS
E-502 DETAILS
E-601 SCHEDULES
E-901 DEMOLITION RISER DIAGRAMS
E-902 NEW RISER DIAGRAMS
05/15/2026
Docusign Envelope ID: 5EF50FA1-1BB3-4ACC-8567-4C69FA215748
VALUE
G-002
BUILDING CODE
SUMMARY
A
54321
B
C
D
E
KEY PLAN
APPROVED BY
CHECKED BY
REVISIONS
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SCALE
SEAL
NO. DESCRIPTION DATE
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F'
S O
FF
IC
E
D
ET
EN
TI
O N
C
EN
TE
R
G
EN
ER
AT
O R
BA
IN
S T, LI
LL
IN
G
TO
N
, N C
IS
SU
ED
F
O R
B
ID
05/14/2026
50190536
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
5/
/2
:1 3:
A
M P:
\5
6\ C
AD
\L
EA
D
S H
EE
TS
\5
G
-0
B U
IL
D
IN
G
C O
D E
SU
M
M
AR
Y.
D
W G
LIFE-SAFETY PENETRATION SCHEDULE
ASSEMBLY AND PENETRATION TYPE
F
RATING
(HR)
U.L. DETAIL SYSTEM NUMBER
C O
N C
R
ET
E
FL
O O
R
S INSULATED METAL PIPES
1 or 2 CAJ-5061, CAJ-5090, CAJ-5091, CAJ-5096, CAJ-5277
3 CAJ-5061, CAJ-5090
UNINSULATED METAL PIPES OR CONDUITS
1 or 2 CAJ-1226, CAJ-1155, CAJ-1380, CAJ-1575, FA-1028
4 CBJ-1037
UNINSULATED NON-METAL PIPES OR CONDUITS 1 or 2 CAJ-2109, CAJ-2407, CAJ-2567, CAJ-2831
UNINSULATED METAL DUCTWORK WITHOUT DAMPERS 1 or 2 CAJ-7029, CAJ-7084
CABLES 1 or 2 CAJ-3095, CAJ-3210, CAJ-3239
CABLE TRAYS
1 or 2 CAJ-4034, CAJ-4035, CAJ-4083
4 CAJ-4107
C O
N C
R
ET
E / M
AS
O
N R
Y W
AL
LS INSULATED METAL PIPES
1 or 2 CAJ-5061, CAJ-5090, CAJ-5091, CAJ-5096, CAJ-5277
4 WJ-5028
UNINSULATED METAL PIPES OR CONDUITS
1 or 2 CAJ-1226, CAJ-1155, CAJ-1380, CAJ-1575
4 CAJ-1630
UNINSULATED NON-METAL PIPES OR CONDUITS 1 or 2 CAJ-2109, CAJ-2407, CAJ-2567, CAJ-2831
INSULATED METAL DUCTWORK WITHOUT DAMPERS 1 or 2 CAJ-7145, WJ-7091, WJ-7112
UNINSULATED METAL DUCTWORK WITHOUT DAMPERS
1 or 2 CAJ-7029, WJ-7109, WJ-7021
3 CAJ-7192
CABLES 1 or 2 CAJ-3095, CAJ-3180, WJ-3036
CABLE TRAYS
1 or 2 CAJ-4034, CAJ-4035, CAJ-4083
4 CAJ-4107
G
YP
SU
M
W
AL
LB
O
AR
D
INSULATED METAL PIPES
1 or 2 WL-5046, WL-5047, WL-5096
4 WL-5073
UNINSULATED METAL PIPES OR CONDUITS 1 or 2 WL-1164, WL-1205, WL-1465
UNINSULATED NON-METAL PIPES OR CONDUITS 1 or 2 WL-2084, WL-2341, WL-2649
INSULATED METAL DUCTWORK WITHOUT DAMPERS 1 or 2 WL-7151, WL-7156
UNINSULATED METAL DUCTWORK WITHOUT DAMPERS 1 or 2 WL-7155, WL-7213, WL-7250
CABLES 1 or 2 WL-3065, WL-3111, WL-3161
CABLE TRAYS 1 or 2 WL-4011, WL-4019, WL-4081
NOTES:
1. REFER TO SECTION 230500 FOR MORE INFORMATION.
2. SELECT UL LISTED PENETRATION DETAIL MATCHING THE PENETRATION CONDITIONS.
3. SUBMIT AN APROPRIATE DETAIL FOR ENGINEER REVIEW IF THE PROJECT CONDITIONS ARE NOT REPRESENTED ABOVE.
Docusign Envelope ID: 5EF50FA1-1BB3-4ACC-8567-4C69FA215748
C
B
A
SHEET NO.
KEY PLAN
SCALE
D
E
APPROVED BY
CHECKED BY
REVISIONS
TITLE
DRAWN BY
DATE
PROJECT NO.
No. DATE BY DESCRIPTION
Dewberry Engineers Inc.
2610 WYCLIFF ROAD
SUITE 410
RALEIGH, NC 27607
PHONE: 919.881.9939
FAX: 919.881.9923
NCBELS #F-0929
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F
G
EN
ER
AT
O R
P
AD
SEAL
KMM
RBR
RBR
05/14/2026
50190536
TOPOGRAPHIC SURVEY NOTES:
1. THIS TOPOGRAPHIC SURVEY IS BASED ON A SURVEY PERFORMED BY DEWBERRY ENGINEERS INC. ON MARCH
5TH, 2026.
2. HORIZONTAL CONTROL (NAD83/2011) AND VERTICAL CONTROL (NAVD88) ESTABLISHED BY GPS OBSERVATIONS AND COMPUTED USING NORTH CAROLINA GEODETIC SURVEY VIRTUAL REFERENCE STATION SERVICE (VRS), YIELDING VALUES OF:
POINT # NORTHING(Y) EASTING(X) ELEV(Z) DESCRIPTION
1 606861.113 2056437.403 159.273 REBAR AND CAP
2 606579.034 2056720.913 158.929 REBAR AND CAP
3. NORTH ARROW IS GRID NORTH AND ALL DISTANCES ARE GROUND DISTANCES. PROJECT LOCALIZED ON POINT
GPS #2. COMBINED GRID FACTOR (GRID TO GROUND) EQUALS 1.00012571065.
4. LOCATIONS OF UTILITIES SHOWN ON THIS SURVEY WERE DETERMINED BY OBSERVED EVIDENCE, LOCATION OF ABOVE GROUND UTILITY APPURTENANCES, AND UTILITY MARKINGS (PAINT, ETC.) PROVIDED BY DEWBERRY.
THESE MARKINGS WERE OBSERVED DURING THE COURSE OF THIS SURVEY, WERE FIELD LOCATED, ARE SHOWN FOR INFORMATIONAL PURPOSES, AND SHOULD BE FIELD VERIFIED IF CRITICAL. UNDERGROUND UTILITIES NOT SHOWN, MAY EXIST. STORM SEWER AND SANITARY SEWER DATA HAS BEEN COLLECTED FROM THE RIM OF THE MANHOLE WITHOUT ENTERING THE STRUCTURE. PIPE SIZES AND TYPES SHOULD BE CONSIDERED APPROXIMATE AND BE FIELD VERIFIED IF CRITICAL. STRUCTURES LABELED “VAULT”, IF ANY, INDICATE A SUBSTRUCTURE WITH
LIMITED VISUAL ACCESS AND INVERT INFORMATION.
STANDARD ABBREVIATIONS
HP HIGH POINT
LP LOW POINT
EG EXISTING GRADE
FG FINISHED GRADE
CB CATCH BASIN
CHL CHAINLINK (FENCE)
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CPP CORRUGATED PLASTIC PIPE
DI DROP INLET
YI YARD INLET
MH MANHOLE
DIP DUCTILE IRON PIPE
EX EXISTING
FDC FIRE DEPARTMENT CONNECTION
FES FLARED END SECTION
OS OUTLET STRUCTURE
FO FIBRE OPTIC
GW GUYWIRE
INV INVERT
PIV POST INDICATOR VALVE
PVC POLY-VYNIL CHLORIDE PIPE
RCP REINFORCED CONCRETE PIPE
SS SANITARY SEWER MAIN
SSS SANITARY SEWER SERVICE
STA STATION
WV WATER VALVE
UGE UNDER GROUND ELECTRIC
BFP BACKFLOW PREVENTER
SCM STORMWATER CONTORL MEASURE
JB JUNCTION BOX
CI CURB INLET
TW TOP WALL
BW BOTTOM WALL
TS TOP STEP
BS BOTTOM STEP
WM WATER METER
STORM DRAINAGE (SD) NOTES:
1. ALL STORM DRAINAGE PIPING SHALL BE CLASS III RCP UNLESS OTHERWISE NOTED ON THE PLANS.
2. ALL STORM DRAINAGE PIPING TO MEET HARNETT COUNTY COVER AND CLEARANCE STANDARDS AND
REQUIREMENTS.
3. EXISTING RIM ELEVATIONS TO BE MODIFIED TO MEET PROPOSED FINAL GRADING.
4. ALL RIM ELEVATIONS ARE FOR TOP OF GRATE.
UNDERGROUND GAS
STORM DRAIN PIPE
UNKNOWN UNDERGROUND UTILITY
UNDERGROUND ELECTRIC
UNDERGROUND WATER
UNDERGROUND STEAM
UNDERGROUND FIBER OPTIC
SANITARY SEWER PIPE
FENCE
OVERHEAD ELECTRIC
UNDERGROUND TELEPHONE
HEDGE/BUSH LINE
GUARD RAIL
RIGHT OF WAY LINE
ADA COMPLIANT RAMP
CURB & GUTTER
STOP BAR (24" WIDE)
EXISTING TREE LINE
FIRE LANE MARKING
SIGN
HIGH VISIBILITY
CROSSWALK
PROPOSED TREELINE
ADA PARKING
EXISTING CURB & GUTTER
REVERSE GUTTER PAN
DEMOLITION (D) NOTES:
1. DEMOLITION PLAN TO BE USED FOR ABOVE GROUND SITE DEMOLITION. SEE UTILITY PLAN FOR UTILITY DEMOLITION. SEE ELECTRICAL DEMOLITION PLANS FOR COORDINATION OF ELECTRICAL DEMOLITION.
SEE MECHANICAL DEMOLITION PLANS FOR COORDINATION OF STEAM AND GAS LINE DEMOLITION.
2. CONTRACTOR SHALL MAKE EVERY EFFORT TO SAVE PROPERTY IRONS, MONUMENTS, OTHER
PERMANENT POINTS AND LINES OF REFERENCE AND CONSTRUCTION STAKES.
3. CONTRACTOR SHALL PROVIDE MEASURES AS NECESSARY DURING CONSTRUCTION FOR
SEDIMENTATION & EROSION CONTROL.
4. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES, UTILITIES AND ALL OTHER PROPERTIES UNLESS THEY ARE TO BE DEMOLISHED AS PART OF THIS PROJECT. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR AND REPLACEMENT OF ANY ITEMS DAMAGED THROUGHOUT THE COURSE OF CONSTRUCTION
THAT ARE EXISTING TO REMAIN.
5. CONTRACTOR SHALL NOT INTERRUPT UTILITY SERVICE WITHOUT PRIOR AUTHORIZATION FROM OWNER.
6. ALL EXISTING UTILITIES MAY NOT BE SHOWN ON THE DRAWINGS AND LOCATION OF EX. UTILITIES (VERTICALLY AND HORIZONTALLY) ARE SHOWN IN APPROXIMATE MANNER ONLY. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UNDERGROUND UTILITIES, PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL CONTACT NC ONE CALL (811) AND HIRE SUE MARKING SERVICE PRIOR TO COMMENCEMENT OF CONSTRUCTION. LOCATION AND ELEVATION OF EXISTING UTILITIES ARE SHOWN IN APPROXIMATE MANNER ONLY. VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES BEFORE CONSTRUCTION BEGINS AND COORDINATE CHANGES TO UTILITIES, IF NEEDED, WITH THE
ENGINEER.
7. CONTRACTOR SHALL REMOVE AND LEGALLY DISPOSE OF ALL CONSTRUCTION WASTE, EXCESS
MATERIALS (INCLUDING SOIL AND TOPSOIL), AS WELL AS ALL UNSUITABLE MATERIALS OFF-SITE TO AN APPROVED AND PERMITTED DISPOSAL SITE. BURNING AT THE SITE IS NOT PERMITTED AT ANY TIME.
8. THE DEMOLITION PLAN SHALL BE PERFORMED IN CONJUNCTION WITH THE INSTALLATION OF THE PHASE ONE EROSION CONTROL PLAN. CONTRACTOR SHALL INSTALL PERIMETER MEASURES BEFORE
COMMENCEMENT OF DEMOLITION.
9. CONCRETE CURB AND GUTTER DEMOLITION EXTENTS SHOWN IS APPROXIMATE. CONTRACTOR SHALL
REMOVE ADDITIONAL CURB AND GUTTER AS NECESSARY TO CONSTRUCT NEW WORK. CONTRACTOR
SHALL SAWCUT TO THE NEAREST JOINT TO LEAVE A CLEAN, NEAT EDGE.
10. CONCRETE SIDEWALK/PAVEMENT DEMOLITION EXTENTS SHOWN IS APPROXIMATE. CONTRACTOR SHALL REMOVE ADDITIONAL SIDEWALK/PAVEMENT AS NECESSARY TO CONSTRUCT NEW WORK. CONTRACTOR
SHALL SAWCUT TO LEAVE A CLEAN, NEAT EDGE.
11. ASPHALT PAVEMENT DEMOLITION EXTENTS IS APPROXIMATE. CONTRACTOR SHALL REMOVE ADDITIONAL
PAVEMENT AS NECESSARY TO CONSTRUCT NEW WORK. CONTRACTOR SHALL SAWCUT TO LEAVE A
CLEAN, NEAT EDGE.
ACCESS DRIVE CENTERLINE
10 PARKING STALL COUNT
AC
EXISTING LEGEND
E
T W
W
E
W
C
C
E
T
T
SIGNIFICANT TREE
CONTROLLED ACCESS
YARD HYDRANT
IRRIGATION CONTROL BOX
SIGN
ELECTRIC CABINET
TELEPHONE/COMMUNICATIONS MANHOLE
POST INDICATOR VALVE
ELECTRIC METER
CAMERA POLE
ELECTRIC MANHOLE
IRRIGATION CONTROL VALVE BOX
ELECTRIC TRANSFORMER
BOLLARD
CAMERA MOUNTED ON BOLLARD
HANDICAP RAMP
POND FOUNTAIN CONTROL PANEL
DOCK DRAIN VALVE
TELEPHONE HAND HOLE
LIGHT POLE
STORM DRAINAGE MANHOLE
BURIED STORM JUNCTION BOX(LOCATION APPROX.)
CURB INLET
CATCH BASIN
FIRE HYDRANT
WATER VALVE
WATER METER
END OF PIPE NOT FOUND/NOT SURVEYED
SANITARY SEWER MANHOLE
ELECTRIC HAND HOLE
CLEAN OUT
WATER MANHOLE
EP. EDGE OF PAVEMENT
FC. FACE OF CURB
BC. BOTTOM OF CURB
TLS TOP OF LEVEL SPREADER
OC ON CENTER
EC EDGE OF CONCRETE
EJ EXPANSION JOINT
CJ CONTROL JOINT
PROPOSED STORM STRUCTURE
LOD
PROPOSED DIRECTION OF FLOW
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED TREE LINE
PROPOSED STORM DRAINAGE
STRUCTURE IDENTIFICATION
PROPOSED LIMITS OF
DISTURBANCE
PROPOSED STORM SEWER
PIPE
XX.XX EXISTING SPOT ELEVATION
HIGH POINT
PROPOSED SWALE CENTERLINE
HP
PROPOSED ROOF DRAIN
> > PROPOSED FOUNDATION DRAIN
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
LOW POINTLP
TOP OF CURBTC
BOTTOM OF CURBBC
PROPOSED RIDGE LINE
XXX.XX PROPOSED SPOT ELEVATION
PROPOSED RIP-RAP DISSIPATER
PAD
TOP OF RAMPTR
BOTTOM OF RAMPBR
TOP OF WALLTW
BOTTOM OF WALLBW
SITE LEGEND
GRADING AND DRAINAGE LEGEND
DEPRESSED CONTOUR
#XX
GUARD RAIL
DEMOLITION LEGEND
CONCRETE DEMO
ASPHALT DEMO
STAIR DIRECTIONDN
0 1 2 4 5 6 STAIR NUMBER
REINFORCED TURF
HEAVY DUTY ASPHALT
CONCRETE
REINFORCED CONCRETE
NOTES,
LEGENDS,
AND
ABBREVIATIONS
LG001
157.54
EX
157.78
EX
158.95
EX
159.05
EX
157.40
EX
159.18
BC
159.05
BC
159.55
TC
159.13
BC
159.63
TC
159.26
BC
159.76
TC
159.68
TC
159.13
BC
159.63
TC
159.26
BC
159.76
TC
159.26
BC
159.13
BC
159.76
TC
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
C
B
A
SHEET NO.
KEY PLAN
SCALE
D
E
APPROVED BY
CHECKED BY
REVISIONS
TITLE
DRAWN BY
DATE
PROJECT NO.
No. DATE BY DESCRIPTION
Dewberry Engineers Inc.
2610 WYCLIFF ROAD
SUITE 410
RALEIGH, NC 27607
PHONE: 919.881.9939
FAX: 919.881.9923
NCBELS #F-0929
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F
G
EN
ER
AT
O R
P
AD
SEAL
KMM
RBR
RBR
05/14/2026
50190536
SITE PLAN
VIEWS
L200
EXISTING CONDITIONS
SCALE 1" = 10'
DEMOLITION PLAN
SCALE 1" = 10'
SITE PLAN
SCALE 1" = 10'
GRADING AND DRAINAGE PLAN
SCALE 1" = 10'
VICINITY MAP
DEMOLISH AND REMOVE ASPHALT
APPROX 1,038 SF
DEMOLISH AND REMOVE CONCRETE
APPROX 582 SF
DEMOLISH AND REMOVE HATCHED PORTION
OF CONCRETE GUTTER
APPROX 9 SF
DEMOLISH AND REMOVE ASPHALT
APPROX 139 SF
NORTH
REINFORCED CONCRETE PAVING
L300
24" CURB AND GUTTER
L300
DEMOLITION PLAN NOTES
1. ALL EXISTING UTILITIES MAY NOT BE SHOWN. THE CONTRACTOR
SHALL VISIT THE SITE AND VERIFY THE PRESENCE OF UTILITIES. THE
CONTRACTOR SHALL ADJUST ANY EXISTING UTILITIES TO REMAIN TO
THE PROPOSED FINISHED GRADE
2. NOT ALL EXISTING VEGETATION IS SHOWN. CONTRACTOR TO REVIEW
PLANS, LIMITS OF DISTURBANCE, AND VISIT SITE TO VERIFY
VEGETATION TO BE REMOVED. NO INCREASE IN CONTRACT VALUE
SHALL BE CONSIDERED.
3. SAWCUT ASPHALT AND CONCRETE LEAVING CLEAN, NEAT EDGES.
REMOVE ALL CONCRETE TO THE NEAREST JOINT. DEMOLITION LIMITS
FOR CONCRETE ITEMS ARE APPROXIMATE. CONTRACTOR IS
RESPONSIBLE FOR FIELD VERIFYING REMOVAL LIMITS TO THE
NEAREST JOINT.
SITE PLAN NOTES
1. SEE SHEET LG001 FOR NOTES, LEGENDS, AND ABBREVIATIONS.
2. ALL DIMENSIONS ARE FACE TO FACE OR EDGE OF PAVEMENT TO
EDGE OF PAVEMENT UNLESS OTHERWISE NOTED.
3. THERE ARE NO NEW PROPOSED IMPERVIOUS SURFACES BEING
ADDED TO THE PROJECT.
4. THERE SHALL BE NO BARE AREAS ON THE SITE. ALL DISTURBED
AREAS TO BE SEEDED OR MULCHED UNLESS OTHERWISE SPECIFIED.
5. CONTRACTOR TO COORDINATE FINAL BOLLARD PLACEMENT AROUND
ELECTRICAL INFRASTRUCTURE. ADJUST IN THE FIELD AS NEEDED.
GRADING PLAN NOTES
1. ALL EXISTING UTILITIES MAY NOT BE SHOWN. THE CONTRACTOR
SHALL VISIT THE SITE AND VERIFY THE PRESENCE OF UTILITIES. THE
CONTRACTOR SHALL ADJUST ANY EXISTING UTILITIES TO REMAIN TO
THE PROPOSED FINISHED GRADE.
2. CONTRACTOR SHALL VERIFY DEPTHS OF EXISTING UTILITY
CONNECTIONS TO CONFIRM CLEARANCES. NOT ALL CROSSINGS MAY
BE SHOWN ON THE PLANS. CONTRACTOR TO COORDINATE
ANTICIPATED CONFLICTS BEFORE START OF STORM CONSTRUCTION.
3. SEE ELECTRICAL PAD DRAWINGS AND DETAILS FOR EQUIPMENT PAD
ELEVATION AND PLACEMENT INFORMATION.
4. CONTRACTOR SHALL ADJUST GRADES AROUND GENERATOR PAD IN
FIELD TO ALLOW FOR POSITIVE DRAINAGE.
NOTE:
· BC STANDS FOR BOTTOM OF CURB
OR FLOWLINE.
· RIM ELEVATIONS GIVEN ARE FOR
THE TOP OF THE GRATE FOR THE
CASTING.
· EJ STANDS FOR EXPANSION JOINT
· CJ STANDS FOR CONTROL JOINT
L300
3PIPE BOLLARD
(TYP)
54'
'-4
4' O.C
. (T
YP)
EXISTING ASPHALT
TO REMAIN
EXISTING ASPHALT
TO REMAIN
EXISTING ASPHALT
TO REMAIN
35' O.C. - E.C.
'-8
'-1
0" O
.C
E.C
NTS
NORTH
PROJECT SITE
W CORNELIUS HARNETT BLVD
BAIN
S
TR
EET
M C
KIN
N
EY PKW
Y
HARNETT CO.
COURTHOUSE
HARNETT CO.
SHERIFF'S OFFICE
HARNETT CO.
HEALTH
DEPARTMENT
4' WIDE CONCRETE FLUME
4' WIDE CONCRETE FLUME
24" CURB AND SPILL GUTTER
(DOTTED HATCH)L300
SEE SITE PLAN NOTE 5 (TYP.)
SEE SITE PLAN NOTES, NOTE 4 (TYP.)
EJ
CJ (TYP.)
C
B
A
SHEET NO.
KEY PLAN
SCALE
D
E
APPROVED BY
CHECKED BY
REVISIONS
TITLE
DRAWN BY
DATE
PROJECT NO.
No. DATE BY DESCRIPTION
Dewberry Engineers Inc.
2610 WYCLIFF ROAD
SUITE 410
RALEIGH, NC 27607
PHONE: 919.881.9939
FAX: 919.881.9923
NCBELS #F-0929
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F
G
EN
ER
AT
O R
P
AD
SEAL
KMM
RBR
RBR
05/14/2026
50190536
DETAILS
L300
REINFORCED CONCRETE PAVING 24" CONCRETE CURB AND GUTTER21
L300 L300
PIPE BOLLARD3
L300
24" CONCRETE CURB AND SPILL GUTTER4
L300
TSA
GFM
GFM
E-001
SYMBOLS &
ABBREVIATIONS
ABBREVIATIONS -
ELECTRICAL
THIS IS A MASTER ABBREVIATIONS LIST. SOME ABBREVIATIONS MAY
NOT APPLY TO THIS PROJECT.
A, AMP AMPERE
AC ALTERNATING CURRENT
AC ABOVE CEILING
AC ARMORED CABLE
ADA AMERICANS WITH DISABILITIES ACT
AF AMPERE FRAME
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERES INTERRUPTING CAPACITY
AL, ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AWG AMERICAN WIRE GAUGE
AWS ABOVE WORK SURFACE
BAS BUILDING AUTOMATION SYSTEM
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BRKR,
BKR
BREAKER
C CONDUIT
C/B, CB CIRCUIT BREAKER
CATV CABLE TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CKT CIRCUIT
CL CENTERLINE
CLF CURRENT LIMITING FUSE
CLG CEILING
COL COLUMN
COMM COMMUNICATION
CONV CONVENIENCE
CP CONTROL PANEL
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CU COPPER
DB DUCTBANK
dB DECIBEL
DC DIRECT CURRENT
DIA DIAMETER
DN DOWN
DP DISTRIBUTION PANEL
DPDT DOUBLE POLE DOUBLE THROW
DPST DOUBLE POLE SINGLE THROW
DWG DRAWING
E, EX EXISTING
EA EACH
EC ELECTRICAL CONTRACTOR
EC EMPTY CONDUIT
ECB ENCLOSED CIRCUIT BREAKER
EGB EARTH, ELECTRICAL OR EQUIPMENT
GROUND BAR
EGC EQUIPMENT GROUNDING CONDUCTOR
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM,
EMERG
EMERGENCY
EMT ELECTRICAL METALLIC TUBING
EO ELECTRONICALLY OPERATED
EOL END OF LINE RESISTOR
EPO EMERGENCY POWER OFF
EQ, EQP EQUIPMENT
ERMS ENERGY REDUCTION MAINTENANCE
SWITCH
FA FIRE ALARM
FC FOOT-CANDLE
FLA FULL LOAD AMPS
FLEX FLEXIBLE CONDUIT CONNECTION
FLR FLOOR
FO FIBER OPTIC
FSS FUSED SAFETY SWITCH
FTL FEED-THRU LUGS
FU FUSE
FURN FURNITURE
FVNR FULL VOLTAGE NON-REVERSING
G, GND GROUND
GALV GALVANIZED
GEN GENERATOR
GFCI, GF GROUND FAULT CIRCUIT INTERRUPTER
ABBREVIATIONS -
ELECTRICAL
THIS IS A MASTER ABBREVIATIONS LIST. SOME ABBREVIATIONS MAY
NOT APPLY TO THIS PROJECT.
GFEP GROUND FAULT EQUIPMENT PROTECTION
GFP GROUND FAULT PROTECTION
GRC,
GRMC
GALVANIZED RIGID METALLIC CONDUIT
HCF MC HEALTHCARE FACILITY METAL-CLAD
HID HIGH INTENSITY DISCHARGE
HL HORN LIGHT
HOA HAND OFF AUTO
HORIZ HORIZONTAL
HP HORSE POWER
HT HEIGHT
HV HIGH VOLTAGE
HVAC HEATING, VENTILATION AND AIR
CONDITIONING
HWP HOT WATER PUMP
Hz HERTZ, FREQUENCY
IDF NTERMEDIARY DISTRIBUTION FRAME
IG ISOLATED GROUND
IMC INTERMEDIATE METALLIC CONDUIT
INCAN INCANDESCENT
INT INTERLOCK
IPC INTEGRATED POWER CENTER
IS INTRINSICALLY SAFE
ISO ISOLATED
JB, JBOX JUNCTION BOX
K KELVIN
KCMIL THOUSAND CIRCULAR MILLS
KV KILOVOLT
KVA KILOVOLT-AMPERES
KVAR KILOVOLT-AMPERES REACTIVE
KW KILOWATT
KWH KILOWATT-HOUR
LCP LIGHTING CONTROL PANEL
LED LIGHT EMITTING DIODE
LFMC LIQUID TIGHT FLEXIBLE METALLIC
CONDUIT
LP LIGHTING PANEL
LRA LOCKED ROTOR AMPS
LS LIFE SAFETY
LS LIMIT SWITCH
LSIG LONG, SHORT, INSTANTANEOUS &
GROUND
LTG LIGHTING
LTS LIGHTS
LV LOW VOLTAGE
MC METAL CLAD CABLE
MCA MAXIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MCCB MOLDED CASE CIRCUIT BREAKER
MCP MOTOR CIRCUIT PROTECTOR
MDF MAIN DISTRIBUTION FRAME
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MFR MANUFACTURER
MI MINERAL INSULATED
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
MTG MOUNTING
MTR MOTOR
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MW MEGAWATT
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
N/A NOT APPLICABLE
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NF NOT FUSED / NON-FUSED
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NFSS NON-FUSED SAFETY SWITCH
NIC NOT IN CONTRACT
NL NIGHT LIGHTING
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
O.L. OVERLOAD
OCPD OVERCURRENT PROTECTIVE DEVICE
P POLE
PB PULL BOX
PH, Ø PHASE
PLC PROGRAMMABLE LOGIC CONTROLLER
PNL PANEL
ABBREVIATIONS -
ELECTRICAL
THIS IS A MASTER ABBREVIATIONS LIST. SOME ABBREVIATIONS MAY
NOT APPLY TO THIS PROJECT.
POE POWER OVER ETHERNET
PP POWER PANEL
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE
PWR POWER
QTY QUANTITY
R REMOVE
RCP REFLECTED CEILING PLAN
REC,
RECP
RECEPTACLE
REQ,
REQ'D
REQUIRED
RMC RIGID METALLIC CONDUIT
RNC RIGID NON-METALLIC CONDUIT
RP RECEPTACLE PANEL
RTS REMOTE TEST SWITCH
SBD,
SWBD
SWITCHBOARD
SDP SECONDARY DISTRIBUTION PANEL
SGR,
SWGR
SWITCHGEAR
SP SINGLE POLE
SPD SURGE PROTECTIVE DEVICE
SPDT SINGLE POLE DOUBLE THROW
SPST SINGLE POLE SINGLE THROW
SS SAFETY SWITCH
ST SHUNT TRIP
STD STANDARD
STR MOTOR STARTER
SW SWITCH
SYM SYMMETRICAL
TEL, TELE TELEPHONE
TEMP TEMPORARY
TGB TELECOMMUNICATIONS GROUND BAR
TTB TELEPHONE TERMINAL BOARD
TYP TYPICAL
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTABLE POWER SUPPLY
USB UNIVERSAL SERIAL BUS
V VOLTS
VA VOLT AMPERES
VAR VOLT AMPERES REACTIVE
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOIP VOICE OVER INTERNET PROTOCOL
W WIRE
W WATT
WG WIRE GUARD
XFR,
XFMR
TRANSFORMER
WIRES DESCRIPTION
LC-1-1
UNCONTROLLED / UNSWITCHED CIRCUIT
HOME RUN. NUMERALS INDICATE PANELBOARD AND
CIRCUIT NUMBERS.
INDICATES CIRCUIT CONTINUATION
STUB INTO ACCESSIBLE CORRIDOR CEILING SPACE UNO
CAP END OF CONDUIT
INDICATES CONDUIT RISER UP
INDICATES CONDUIT RISER DOWN
CONDUIT SLEEVE
CIRCUIT SYMBOLS
HOME RUN. MULTIPLE ARROWS INDICATES NUMBER OF
CIRCUITS INCLUDED IN CONDUIT (1, 2 OR 3).
SWBD1
WALL MOUNTED PANEL
(SHADING INDICATES ESSENTIAL BRANCH)
RECESSED PANEL
(SHADING INDICATES ESSENTIAL BRANCH)
POWER SYMBOLS
SYMBOL DESCRIPTION
SUBSCRIPTS
"P" = FURNITURE POWER
CONNECTION
"T" = FURNITURE TELECOM
CONNECTION
JUNCTION BOX
C
EI
LI
N
G M
TD
W
AL
L M
TD
ST
U
B U
P
N O
R M
AL
FL
O
O R
M
TD
SIMPLEX OUTLETS
DUPLEX OUTLETS
SPECIALTY OUTLETS
(NEMA TYPE AS SHOWN)
QUADRUPLEX OUTLETS
CORD REEL
COMBINATION AV, DATA &
POWER BOX(SEE
APPLICABLE SCHEDULE
FOR SIZE, ETC.)
EQUIPMENT CONNECTION
POWER/TELECOM POLE
MOTOR
MANUAL MOTOR STARTER, FRACTIONAL HORSEPOWER (SEE
STARTER SCHEDULE FOR SIZE, ETC.)
NON-FUSIBLE SAFETY SWITCH
(SEE DISCONNECT SCHEDULE FOR SIZE, ETC.)
SURGE SUPPRESSOR
GROUND BAR
POWER/TELECOMMUNICATIONS HANDHOLE
POWER/TELECOMMUNICATIONS MANHOLE
UTILITY METER
SUBSCRIPTS
"AC" = ABOVE COUNTER
"C" = SWITCH CONTROLLED
PER ASHRAE 90.1/CAT24)
"G" = GROUND FAULT
BREAKER
"GF" = GROUND FAULT
"IG" = ISOLATED GROUND
"UC" = UNDER COUNTER
"USB"= W/ USB PORTS
"WP" = WEATHERPROOF BOX
"WR" = WEATHER RESISTANT
SUBSCRIPTS
"ADA"= ADA COMPLIANT
DOOR
OPERATOR
"EPO"= EMERGENCY POWER
OFF
"DO" = DOOR OPERATOR
"HF" = HANDS FREE
PUSH BUTTON
FUSIBLE SAFETY SWITCH
(SEE DISCONNECT SCHEDULE FOR SIZE, ETC.)
COMBINATION MOTOR STARTER/SAFETY SWITCH,
ENCLOSED CIRCUIT BREAKER
(SEE DISCONNECT SCHEDULE FOR SIZE, ETC.)
VARIABLE FREQUENCY DRIVE (VFD)
(SEE DISCONNECT SCHEDULE FOR SIZE, ETC.)
DISCONNECT SWITCH
(FURNISHED BY OTHERS)
SURFACE MOUNTED PLUGMOLD OR WIREMOLD
(DEVICE QUANTITIES AND TYPES AS INDICATED)
ELECTRICAL EQUIPMENT/GEAR
SIZE, TYPE, AND MOUNTING AS SHOWN AND/OR NOTED.
POWER DISTRIBUTION
/ C R
IT
IC
AL
EM
ER
G
EN
C
Y
GROUND ROD SUBSCRIPTS
"CR" = CHEMICAL ROD
"TW" = TEST WELL
HH
MH
PT
e
JJ
FB#
M
J
SYMBOL DESCRIPTION
SUBSCRIPTSGROUND ROD
GROUND BAR
EXOTHERMIC CONNECTION
AIR TERMINAL SUBSCRIPTS
THROUGH-ROOF CONNECTOR
BONDING GROUNDING &
LIGHTNING PROTECTION
GROUND CONDUCTOR
#4/0AWG, UNLESS NOTED OTHERWISE
BARE/INSULATED AS INDICATED
COMPRESSION/MECHANICAL
CONNECTION
"A" = PERIMETER
"B" = SMALL EQUIP
"C" = LARGE EQUIP
"D" = AREA
"CR" = CHEMICAL ROD
"TW" = TEST WELL
STANDARDS DETAILING SYMBOLS
SYMBOL DESCRIPTION
SHEET REF.
PLAN / DETAIL
REF.
SECTION REF.
SHEET REF.
BUILDING / WALL
SECTION
SIM
SCALE:
VIEW TITLEVIEW NAMEVIEW DESIGNATION
VIEW SCALE
LEVEL NAME
LEVEL ELEVATION
GRID NUMBER
OR LETTER
GRID LINE
INDICATES
PLAN NORTH
INDICATES
TRUE NORTH
NORTH INDICATOR
ROOM NUMBER
ROOM TAG
REVISION NUMBER REVISION TAG
REVISION CLOUD
KEYNOTE TAG
(PER SHEET NUMBERS)
SPOT ELEVATION
SYMBOL
POINT OF
CONNECTION
POINT OF
DISCONNECTION
ELEVATION AT
POINT INDICATED
1' - 0"
Space Name
A
FIRST FLOOR
100' - 0"
1 View Name 1/8" = 1'-0"
A-101
A-101
AREA TO BE
ENLARGED
CALLOUT
LEVEL LINE
LINETYPES
BACKGROUND
EXISTING
DEMOLITION
NEW
FUTURE
HIDDEN/UNDER
OBSTRUCTION
A
54321
B
C
D
E
KEY PLAN
APPROVED BY
CHECKED BY
REVISIONS
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SCALE
SEAL
NO. DESCRIPTION DATE
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F'
S O
FF
IC
E
D
ET
EN
TI
O N
C
EN
TE
R
G
EN
ER
AT
O R
BA
IN
S T, LI
LL
IN
G
TO
N
, N C
IS
SU
ED
F
O R
B
ID
05/14/2026
50190536
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
5/
/2
:2 4:
A
M P:
\5
6\ C
AD
\E
LE
C
TR
IC
AL
\5
E-
SY
M
BO
LS
A
BB
R
EV
IA
TI
O N
S.
D
W G
Docusign Envelope ID: D64E7695-BAC3-835C-8054-F80C0A6B9159
GFM
E-002
NOTES
A
54321
B
C
D
E
KEY PLAN
APPROVED BY
CHECKED BY
REVISIONS
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SCALE
SEAL
NO. DESCRIPTION DATE
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F'
S O
FF
IC
E
D
ET
EN
TI
O N
C
EN
TE
R
G
EN
ER
AT
O R
BA
IN
S T, LI
LL
IN
G
TO
N
, N C
IS
SU
ED
F
O R
B
ID
05/14/2026
50190536
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
5/
/2
:2 4:
A
M P:
\5
6\ C
AD
\E
LE
C
TR
IC
AL
\5
E-
N
O
TE
S.
D
W G
1. ELECTRICAL PLANS ARE GENERALLY DIAGRAMMATIC IN NATURE AND DO NOT CONVEY ALL
DETAILS REQUIRED FOR A COMPLETE INSTALLATION. HOWEVER, THESE PLANS SHALL BE
FOLLOWED AS CLOSELY AS POSSIBLE FOR GENERAL ARRANGEMENT AND LOCATION OF
EQUIPMENT. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS, DIMENSIONS AND
MOUNTING METHODS. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WORK. CONTRACTOR SHALL VERIFY STRUCTURAL AND FINISH CONDITIONS PRIOR TO
COMMENCING WORK. CONTRACTOR SHALL ARRANGE WORK TO MEET THESE CONDITIONS AND
PROVIDE SUCH EQUIPMENT AND ACCESSORIES AS MAY BE REQUIRED. IN THE EVENT OF A
CONFLICT, DEVIATION OR DISCREPANCY FOUND WITHIN THE PLANS OR SPECIFICATIONS,
CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO ENGINEER OF RECORD FOR
CLARIFICATION PRIOR TO COMMENCING WORK.
2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS,
MANUFACTURERS' RECOMMENDED INSTALLATION PROCEDURES, THE AMERICANS WITH
DISABILITIES ACT, ANSI A117.1, THE NATIONAL ELECTRICAL CODE, THE NATIONAL FIRE ALARM
AND SIGNALING CODE AND ALL OTHER APPLICABLE LOCAL AND STATE CODES AS ADOPTED
AND MODIFIED BY THE AUTHORITIES HAVING JURISDICTION.
3. AN ELECTRICAL FOREMAN SHALL BE ON-SITE, SUPERVISING ALL WORK PERFORMED.
4. CONTRACTOR SHALL COORDINATE WITH OWNER FOR ACCESS TO AREA OF WORK AND FOLLOW
ALL OWNER ENVIRONMENTAL, HEALTH, SAFETY AND SECURITY PROTOCOLS.
5. ALL WORK SHALL BE PHASED IN ACCORDANCE WITH CONTRACT PLANS, SPECIFICATIONS AND
OWNER'S REQUIREMENTS.
6. ALL MATERIALS AND EQUIPMENT FURNISHED FOR THIS PROJECT SHALL BE NEW AND SHALL BE
LISTED AND LABELED BY A THIRD PARTY NATIONALLY RECOGNIZED TESTING LABORATORY AS
REQUIRED AND PERMITTED BY AUTHORITIES HAVING JURISDICTION. WHERE MULTIPLE PIECES
OF EQUIPMENT AND/OR COMPONENTS ARE INSTALLED IN A COMMON ENCLOSURE, THE ENTIRE
ASSEMBLY SHALL BE LISTED AND LABELED AS AN ASSEMBLY. MODIFICATIONS OR ADDITIONS
TO EXISTING EQUIPMENT SHALL MATCH EXISTING TO MAINTAIN ANY ASSEMBLY LISTING.
7. CONTRACTOR SHALL COORDINATE LOCATIONS OF ALL FIRE AND/OR SMOKE RATED WALLS,
BARRIERS, CEILINGS, FLOORS, PARTITIONS, AND ROOFS PRIOR TO AND DURING
CONSTRUCTION.
8. CONTRACTOR SHALL PROVIDE NATIONALLY RECOGNIZED TESTING LABORATORY LISTED
THROUGH-PENETRATION DRAFT, FIRE AND SMOKE STOP SYSTEMS FOR ALL NEW FIRE AND/OR
SMOKE-RATED WALL, BARRIER, CEILING, FLOOR AND ROOF PENETRATIONS WITHIN THE AREA
OF WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE,
NATIONALLY RECOGNIZED TESTING LABORATORY LISTED REQUIREMENTS AND APPLICABLE
BUILDING CODES. PROVIDE PENETRATION ASSEMBLIES SUITABLE FOR PARTICULAR
CONSTRUCTION.
9. CONTRACTOR SHALL MAINTAIN INTEGRITY OF VAPOR BARRIER AND INSULATION FOR ALL
ELECTRICAL WORK AND DEVICES ON EXTERIOR AND PERIMETER WALLS.
10. CONTRACTOR SHALL COORDINATE ELECTRICAL WORK WITH ALL OTHER TRADES PRIOR TO
COMMENCING WORK TO ENSURE ELECTRICAL WORK DOES NOT INTERFERE WITH OTHER
TRADES. LINES AND SYSTEMS THAT REQUIRE SLOPE SHALL TAKE PRECEDENCE OVER
ELECTRICAL WORK.
11. CONTRACTOR SHALL REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR LOCATIONS OF
MECHANICAL AND PLUMBING EQUIPMENT. CONTRACTOR SHALL REFER TO DRAWINGS OF
OTHER TRADES FOR LOCATIONS OF THEIR EQUIPMENT. CONTRACTOR SHALL COORDINATE
AND VERIFY ELECTRICAL REQUIREMENTS WITH OTHER TRADES PRIOR TO COMMENCING WORK.
12. PRIOR TO EQUIPMENT INSTALLATION, CONTRACTOR SHALL CONDUCT FIELD MEASUREMENTS
TO ENSURE ALL ELECTRICAL EQUIPMENT AND ACCESSORIES WILL FIT INTO LOCATION(S) AS
INDICATED ON PLANS. IN THE EVENT OF A CONFLICT, DEVIATION OR DISCREPANCY,
CONTRACTOR SHALL PROVIDE A PROPOSED SKETCH OF REVISED ARRANGEMENT TO
ENGINEER OF RECORD FOR ACCEPTANCE PRIOR TO COMMENCING WORK.
13. PROPERLY SUPPORT ALL WORK AND EQUIPMENT INSTALLED UNDER THIS CONTRACT PLUMB
AND PARALLEL WITH BUILDING LINES. STUDY ALL GENERAL, STRUCTURAL, PLUMBING, HVAC,
AND ELECTRICAL DRAWINGS, SHOP DRAWINGS, AND CATALOG DATA TO DETERMINE HOW
EQUIPMENT, ACCESSORIES, PIPING, FIXTURES, AND RELATED ITEMS ARE TO BE SUPPORTED,
MOUNTED, OR SUSPENDED. PROVIDE ALL BOLTS, INSERTS, PIPE STANDS, BRACKETS,
STRUCTURAL SUPPORTS, AND ACCESSORIES FOR PROPER SUPPORT OF EQUIPMENT
FURNISHED UNDER THIS CONTRACT.
14. CONTRACTOR SHALL PROVIDE ADDITIONAL SUPPORT FOR DEVICE BACK BOXES, EQUIPMENT, LUMINAIRES AND RACEWAY WHERE BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT
MOUNTING.
15. CONTRACTOR SHALL VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS
AND ALL REQUIRED MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
16. CONTRACTOR SHALL NOT BACKFILL EXCAVATIONS, INSTALL COVERPLATES AND ENCLOSURES
OR GENERALLY SEAL OR OBSCURE ELECTRICAL INSTALLATIONS PRIOR TO INSPECTION AND
ACCEPTANCE BY AUTHORITIES HAVING JURISDICTION.
17. CONTRACTOR SHALL REMOVE ALL DIRT AND DEBRIS FROM ALL ELECTRICAL ENCLOSURES AND DEVICE, JUNCTION AND PULL BOXES PRIOR TO INSTALLATION OF DEVICES, COVERPLATES AND
LIDS.
18. CONTRACTOR SHALL LABEL ALL COVERPLATES, EQUIPMENT, JUNCTION BOXES, AND PULL
BOXES WITH CIRCUIT AND PANEL DESIGNATIONS. REFER TO DETAILS AND SPECIFICATIONS
FOR SPECIFIC LABEL AND IDENTIFICATION REQUIREMENTS.
19. CONTRACTOR SHALL PROVIDE NEW, TWO COLUMN, TYPED, COMPLETED AND REMOVABLE
DIRECTORIES INDICATING CIRCUIT DESCRIPTIONS AND ROOM NUMBERS (AS INDICATED BY
FINAL ROOM SIGNAGE), FOR ALL AFFECTED CIRCUITS WITHIN ELECTRICAL DISTRIBUTION
EQUIPMENT. ALL SPACES SHALL BE INDICATED AS SUCH. ALL SPARES SHALL BE INDICATED AS
SUCH AND PLACED IN THE "OFF" POSITION.
20. MINIMUM RACEWAY SIZE OF 3/4", UNLESS NOTED OTHERWISE.
21. ALL RACEWAYS SHALL BE INSTALLED CONCEALED ABOVE CEILINGS, WITHIN WALLS OR BELOW
FLOORS EXCEPT WITHIN UNFINISHED SPACES AND ON CEILINGS OF AREAS WITH EXPOSED
STRUCTURE. WITHIN PUBLIC SPACES, EXPOSED CONDUIT SHALL BE FACTORY OR FIELD
PAINTED TO MATCH ADJACENT STRUCTURE. ALL CONDUITS SHALL BE ROUTED PARALLEL OR
PERPENDICULAR TO BUILDING STRUCTURE. ALL CONDUITS ROUTED IN PARALLEL SHALL
UTILIZE CONCENTRIC BEND RADII FOR ALL TURNS.
22. ALL EMPTY RACEWAYS SHALL BE PROVIDED WITH PULL STRINGS INSTALLED PER
SPECIFICATIONS.
23. ALL EXPOSED RACEWAY ENDS SHALL BE PROVIDED WITH PLASTIC BUSHINGS.
24. ALL ELECTRICAL CONDUCTORS, EQUIPMENT AND TERMINALS SHALL BE 75°C RATED UNLESS
NOTED OTHERWISE.
25. MINIMUM CONDUCTOR SIZE OF #12AWG, COPPER, THHN/THWN, FOR BRANCH CIRCUITS,
UNLESS NOTED OTHERWISE.
26. ALL BRANCH AND FEEDER CIRCUITS SHALL ORIGINATE FROM PANELS AND SERVE DEVICES AND
EQUIPMENT AS INDICATED ON PLANS AND SCHEDULES. IN THE EVENT OF A CONFLICT,
DEVIATION OR DISCREPANCY, CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO
ENGINEER OF RECORD FOR CLARIFICATION PRIOR TO COMMENCING WORK.
27. ALL BRANCH CIRCUITS SHALL HAVE A DEDICATED NEUTRAL CONDUCTOR, UNLESS NOTED
OTHERWISE. THE USE OF A COMMON NEUTRAL FOR MULTIPLE BRANCH CIRCUITS IS STRICTLY
PROHIBITED.
28. ALL RACEWAYS CONTAINING A FEEDER OR BRANCH CIRCUIT SHALL BE PROVIDED WITH AN
INSULATED EQUIPMENT GROUNDING CONDUCTOR. FOR RACEWAYS CONTAINING MORE THAN
ONE BRANCH CIRCUIT, SIZE OF EQUIPMENT GROUNDING CONDUCTOR SHALL BE BASED ON THE
LARGEST CIRCUIT'S OVERCURRENT PROTECTIVE DEVICE.
29. ALL DEVICE BACK BOXES SHALL BE RECESSED WITHIN WALLS, FURRING, OR CASEWORK,
UNLESS NOTED OTHERWISE. USE OF EXPOSED SURFACE MOUNTED DEVICE BACK BOXES IS
PROHIBITED EXCEPT WITHIN UNFINISHED SPACES AND ON CEILINGS OF AREAS WITH EXPOSED
STRUCTURE. WITHIN PUBLIC SPACES, EXPOSED DEVICE BACK BOXES SHALL BE FACTORY OR
FIELD PAINTED TO MATCH ADJACENT STRUCTURE.
30. DEVICE BACK BOXES INDICATED ON PLANS AS ADJACENT TO ONE ANOTHER SHALL BE
MOUNTED 8" APART, CENTER-TO-CENTER, UNLESS NOTED OTHERWISE.
31. DEVICE BACK BOXES LOCATED ON OPPOSITE SIDES OF FIRE OR SMOKE RATED PARTITIONS
SHALL NOT BE MOUNTED WITHIN THE SAME WALL CAVITY. WALL PENETRATIONS SHALL BE
SEPARATED BY MOUNTING BOXES ON OPPOSITE SIDES OF WALL STUDS OR OTHER VERTICAL
STRUCTURAL MEMBER INSIDE THE WALL.
32. CONTRACTOR SHALL COORDINATE EXACT HEIGHT AND LOCATION OF ALL WALL MOUNTED
DEVICE BACK BOXES WITH ARCHITECTURAL INTERIOR ELEVATIONS AND CASEWORK SHOP
DRAWINGS PRIOR TO INSTALLATION. IN THE EVENT OF A CONFLICT, DEVIATION OR
DISCREPANCY, CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO ARCHITECT AND
ENGINEER OF RECORD FOR CLARIFICATION PRIOR TO COMMENCING WORK. MINOR
ADJUSTMENTS IN ANY DIRECTION FOR DEVICE LOCATION, I.E. 5'-0" OR LESS, SHALL BE MADE AT
NO ADDITIONAL COST TO THE OWNER.
33. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE BACK BOX AND EQUIPMENT
LOCATIONS WITH OTHER TRADES PRIOR TO INSTALLATION. IN THE EVENT OF A CONFLICT,
DEVIATION OR DISCREPANCY, CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO
ENGINEER OF RECORD FOR CLARIFICATION PRIOR TO COMMENCING WORK. MINOR
ADJUSTMENTS IN ANY DIRECTION FOR DEVICE LOCATION, I.E. 5'-0" OR LESS, SHALL BE MADE AT
NO ADDITIONAL COST TO THE OWNER.
34. CONTRACTOR SHALL PROVIDE MINIMUM 4" HOUSEKEEPING PAD WITH CHAMFERED EDGES FOR
ALL FLOOR MOUNTED EQUIPMENT, UNLESS NOTED OTHERWISE. REFER TO DETAILS, IF
APPLICABLE.
35. REFER TO THE ARCHITECTURAL REFLECTED CEILING PLANS FOR THE EXACT LOCATION OF ALL
CEILING MOUNTED LUMINAIRES AND DEVICES.
36. EXACT HEIGHTS AND LOCATIONS OF LUMINAIRES WITHIN UNFINISHED SPACES SHALL BE
COORDINATED AND DETERMINED IN THE FIELD. LUMINAIRES SHALL NOT BE SUPPORTED FROM
DUCTWORK OR PIPING. CHAIN OR TRAPEZE-TYPE HANGERS SHALL BE PROVIDED WHERE
LUMINAIRES CAN NOT BE MOUNTED DIRECTLY TO STRUCTURE OR CEILING. LUMINAIRES SHALL
BE LOCATED TO MAXIMIZE ACCESSIBILITY AND ILLUMINATION.
37. ORIENT VERTICALLY MOUNTED RECEPTACLES WITH GROUND PIN UP. ORIENT HORIZONTALLY
MOUNTED RECEPTACLES WITH GROUND PIN TO LEFT (NEUTRAL UP).
38. CONTRACTOR SHALL COORDINATE EXACT LOCATION OF ALL FLOOR-MOUNTED BOXES WITH
ARCHITECT PRIOR TO INSTALLATION.
39. ALL AV, DATA, SECURITY AND TELECOMMUNICATIONS CABLING SHALL BE INSTALLED
CONCEALED FROM VIEW ABOVE CEILINGS, IN WALLS OR BELOW FLOORS EXCEPT WITHIN
UNFINISHED SPACES AND ON CEILINGS OF AREAS WITH EXPOSED STRUCTURE. ALL CABLING
SHALL BE ROUTED PARALLEL OR PERPENDICULAR TO BUILDING STRUCTURE.
40. SMOKE DETECTORS SHALL BE LOCATED MINIMUM 3'-0" FROM HVAC SUPPLY AND RETURN
OPENINGS.
41. WHERE MULTIPLE VISUAL NOTIFICATION DEVICES CAN BE SEEN FROM A SINGLE LOCATION
DURING NORMAL FACILITY OPERATION, ALL STROBES SHALL BE SYNCHRONIZED TO ALLOW
FOR SIMULTANEOUS OPERATION.
GENERAL NOTES - ELECTRICAL GENERAL NOTES - ELECTRICAL
1. NEW WORK SHOWN BOLD AND CONTINUOUS. EXISTING TO REMAIN WORK SHOWN LIGHT AND
CONTINUOUS.
2. NOT ALL ELECTRICAL DEVICES AND EQUIPMENT ARE SHOWN. LOCATIONS AND ASSOCIATED
CIRCUITS OF EXISTING DEVICES AND EQUIPMENT SHOWN ARE BASED IN PART UPON PREVIOUS
DRAWINGS, FIELD OBSERVATIONS AND INFORMATION FURNISHED BY OTHERS AND SHALL BE
CONSIDERED APPROXIMATE. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO
COMMENCING WORK.
3. ALL EXISTING DEVICES AND EQUIPMENT SHALL REMAIN IN PLACE AND OPERATIONAL UNLESS
NOTED OTHERWISE.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTINUITY OF ALL EXISTING CIRCUITS AND
SYSTEMS TO REMAINING DEVICES AND EQUIPMENT WHICH MAY BE AFFECTED BY AREA OF
WORK. MATCH AND EXTEND CONDUIT, CONDUCTORS, CABLES, ETC. AS NECESSARY TO
MAINTAIN CIRCUIT INTEGRITY.
5. ALL EXISTING RACEWAY AND WIRING THAT ARE TO REMAIN IN THE AREA OF WORK SHALL BE
RELOCATED AS REQUIRED TO PROVIDE OR MAINTAIN ACCESSIBILITY AND TO ACCOMMODATE
THE PROPOSED CONSTRUCTION. CONTRACTOR SHALL FIELD VERIFY ALL RACEWAY AND
WIRING TO REMAIN PRIOR TO COMMENCING WORK. ALL RELOCATION SHALL BE COORDINATED
WITH THE OWNER OR OWNER'S REPRESENTATIVE. PROVIDE TEMPORARY CONNECTIONS TO
EQUIPMENT AND DEVICES TO MAINTAIN EQUIPMENT AND SYSTEMS IN SERVICE. ALL DOWNTIME
REQUIRED FOR INSTALLATION OF TEMPORARY CONNECTIONS SHALL BE COORDINATED WITH
THE OWNER OR OWNER'S REPRESENTATIVE.
6. IN AREAS WHERE EXISTING CEILINGS ARE NOT SLATED TO BE REPLACED, CONTRACTOR SHALL
WORK THROUGH EXISTING CEILINGS. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS
FOR AREA OF WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPLACING
CEILING SYSTEM DAMAGED AS A RESULT OF THEIR WORK.
7. CONTRACTOR SHALL COORDINATE POWER SHUTDOWN REQUIREMENTS WITH OWNER OR
OWNER'S REPRESENTATIVE AT LEAST 7 DAYS IN ADVANCE OF DEMOLITION AND/OR TIE-IN
WORK. SHUTDOWN WORK SHALL BE MINIMIZED TO AVOID INTERFERENCE WITH OWNER'S
NORMAL OPERATING SCHEDULE.
8. CONTRACTOR SHALL VERIFY NO DEVICES OR EQUIPMENT ARE SERVED BY BREAKERS
CURRENTLY LABELED "SPARE" TO BE UTILIZED FOR NEW WORK WITHIN AFFECTED ELECTRICAL
DISTRIBUTION EQUIPMENT. IN THE EVENT OF A CONFLICT, DEVIATION OR DISCREPANCY,
CONTRACTOR SHALL TRACE AND IDENTIFY SUSPECT LOAD(S) AND PROVIDE WRITTEN
NOTIFICATION TO ENGINEER OF RECORD FOR CLARIFICATION PRIOR TO COMMENCING WORK.
9. CONTRACTOR SHALL CLEAN AND RE-LAMP ALL REMAINING LUMINARIES AND REPLACE
DAMAGED LENSES IN AFFECTED WORK AREAS.
10. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY FIRE ALARM SYSTEM TYPE.
IF DETERMINED THAT THE EXISTING SYSTEM IS A CONVENTIONAL-ZONED OR HYBRID TYPE, OR
IF THE EXISTING SYSTEM IS DISPLAYING A TROUBLE OR SUPERVISORY SIGNAL, CONTRACTOR
SHALL PROVIDE WRITTEN NOTIFICATION TO ENGINEER OF RECORD PRIOR TO COMMENCING
WORK.
11. CONTRACTOR SHALL COORDINATE FIRE ALARM SYSTEM DOWNTIME REQUIREMENTS WITH
AUTHORITY HAVING JURISDICTION AND OWNER'S REPRESENTATIVE AT LEAST 7 DAYS IN
ADVANCE OF TIE-IN WORK. DOWNTIME WORK SHALL BE MINIMIZED TO AVOID INTERFERENCE
WITH OWNER'S NORMAL OPERATING SCHEDULE. FIRE WATCH SHALL BE PROVIDED DURING
FIRE ALARM SYSTEM DOWNTIME. NOTIFY AUTHORITY HAVING JURISDICTION FOR ANY
INTERRUPTION EXTENDING BEYOND EIGHT HOURS.
12. NEW FIRE ALARM DEVICES SHALL BE COMPATIBLE WITH AND CONNECTED TO EXISTING FIRE
ALARM SYSTEM. CONTRACTOR SHALL PROVIDE ALL NECESSARY COMPONENTS TO MAKE NEW
FIRE ALARM SYSTEM FULLY FUNCTIONAL. CONTRACTOR SHALL VERIFY EXISTING FIRE ALARM
SYSTEM HAS AVAILABLE CAPACITY FOR NEW DEVICES. IF CAPACITY IS NOT AVAILABLE,
CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO ENGINEER OF RECORD PRIOR TO
COMMENCING WORK.
13. FIRE ALARM CIRCUITS SHALL BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE
REQUIREMENTS OF NEC ARTICLE 760. CONTRACTOR SHALL PROVIDE NEW RACEWAY AND
BOXES TO CONNECT NEW FIRE ALARM DEVICES TO EXISTING INITIATING DEVICE CIRCUITS,
SIGNALING LINE CIRCUITS OR NOTIFICATION APPLIANCE CIRCUITS. PROVIDE UPSTREAM AND
DOWNSTREAM CONDUCTORS AND RACEWAYS AS REQUIRED TO MAINTAIN EXISTING WIRING
CLASSIFICATION AND SERVICE TO EXISTING DEVICES NOT ASSOCIATED WITH THIS PROJECT.
CABLE SPLICES ARE STRICTLY PROHIBITED, UNLESS NOTED OTHERWISE.
14. CONTRACTOR SHALL SUBMIT UPDATED FIRE ALARM BATTERY CALCULATIONS AND PROVIDE
ANY ADDITIONAL POWER SUPPLIES, BATTERIES, NAC PANELS OR COMPONENTS REQUIRED TO
ACCOMPLISH CHANGES SHOWN ON DRAWINGS OR SPECIFICATIONS.
15. CONTRACTOR SHALL COMPLY WITH REACCEPTANCE TESTING AS ESTABLISHED WITHIN THE
NATIONAL FIRE ALARM AND SIGNALING CODE, AS ADOPTED AND AMENDED BY THE AUTHORITY
HAVING JURISDICTION. IF APPLICABLE, EXISTING FIRE ALARM PANEL SHALL BE (RE)TESTED FOR
INTERCONNECTIONS TO ELEVATOR SYSTEM PRIOR TO FINAL INSPECTION BY THE AUTHORITY
HAVING JURISDICTION. OWNERS OF BUILDINGS WHERE FIRE ALARM SYSTEMS ARE UPGRADED
OR CHANGED WILL ALSO BE REQUIRED TO FILE AN APPLICATION FOR ALTERATION WITH NC
DOL ELEVATOR DIVISION PRIOR TO COMMENCING WORK ON ANY SYSTEM DIRECTLY RELATED
TO THE OPERATION OF ANY ELEVATOR WITHIN THE STRUCTURE.
16. CONTRACTOR SHALL UPDATE ZONE MAPS. ZONE MAPS SHALL INCLUDE LOCATIONS OF ALL
INITIATING DEVICES, REMOTE ANNUNCIATORS AND THE FIRE ALARM CONTROL PANEL. ROOM
NUMBERS SHALL REFLECT FINAL ROOM SIGNAGE.
RENOVATION NOTES - ELECTRICAL
1. DEMOLITION WORK SHOWN BOLD AND DASHED. EXISTING TO REMAIN WORK SHOWN LIGHT
AND CONTINUOUS.
2. UNLESS NOTED OTHERWISE, DEMOLISH ALL POWER DEVICES, FIRE ALARM DEVICES, LOW
VOLTAGE DEVICES AND LIGHT FIXTURES SCHEDULED FOR DEMOLITION. FOR ALL DEMOLISHED
DEVICES AND FIXTURES, COMPLETELY REMOVE ALL BRANCH CIRCUITS AND ASSOCIATED
WIRING, CONDUIT AND ACCESSORIES. WHERE COMPLETE DEMOLITION IS NOT POSSIBLE,
CONTRACTOR SHALL INFORM THE ARCHITECT AND OWNER AND DEMOLISH ITEMS SUCH THAT
IT DOES NOT DISTURB EXISTING ARCHITECTURAL ELEMENTS.
3. CONTRACTOR SHALL PROTECT, PRESERVE AND MAINTAIN ANY DEVICES TO BE REUSED OR
RELOCATED AND SHALL REINSTALL WHERE INDICATED ON PLANS.
4. EXCEPT WHERE NOTED OTHERWISE, ALL REMOVED ELECTRICAL EQUIPMENT, DEVICES,
CONDUIT, CONDUCTORS, BOXES, LUMINAIRES AND ASSOCIATED ITEMS SHALL BE PROPERLY
DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE CODES AND REGULATIONS.
5. CONTRACTOR SHALL DISCONNECT AND REMOVE ALL ELECTRICAL CONNECTIONS TO
EQUIPMENT FROM OTHER TRADES BEING REMOVED WITHIN AREA OF WORK. COORDINATE
WITH OTHER TRADE CONTRACTORS PRIOR TO DEMOLITION.
6. PRIOR TO REMOVAL OF CIRCUIT FROM A PANEL, CONTRACTOR SHALL VERIFY NO OTHER
DEVICES EXIST ON THE CIRCUIT. IN THE EVENT OF A CONFLICT, DEVIATION OR DISCREPANCY, CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO ENGINEER OF RECORD FOR
CLARIFICATION PRIOR TO REMOVAL.
7. ONCE A CIRCUIT HAS BEEN REMOVED, THE REMAINING BREAKER SHALL BE LABELED SPARE, TURNED OFF, AND MADE READY FOR USE UNDER NEW WORK.
8. CONTRACTOR SHALL COORDINATE FIRE ALARM SYSTEM DOWNTIME REQUIREMENTS WITH
AUTHORITY HAVING JURISDICTION AND OWNER'S REPRESENTATIVE AT LEAST 7 DAYS IN
ADVANCE OF DEMOLITION WORK. DOWNTIME WORK SHALL BE MINIMIZED TO AVOID
INTERFERENCE WITH OWNER'S NORMAL OPERATING SCHEDULE. FIRE WATCH SHALL BE
PROVIDED DURING FIRE ALARM SYSTEM DOWNTIME. NOTIFY AUTHORITY HAVING JURISDICTION
FOR ANY INTERRUPTION EXTENDING BEYOND EIGHT HOURS.
9. PRIOR TO REMOVAL OF INITIATING DEVICE CIRCUIT, SIGNALING LINE CIRCUIT OR NOTIFICATION
APPLIANCE CIRCUIT FROM FIRE ALARM CONTROL PANEL, CONTRACTOR SHALL VERIFY NO
OTHER DEVICES EXIST ON THE CIRCUIT. IN THE EVENT OF A CONFLICT, DEVIATION OR
DISCREPANCY, CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO ENGINEER OF
RECORD FOR CLARIFICATION PRIOR TO REMOVAL.
10. ONCE A FIRE ALARM CIRCUIT HAS BEEN REMOVED, THE REMAINING INITIATING DEVICE CIRCUIT, SIGNALING LINE CIRCUIT OR NOTIFICATION APPLIANCE CIRCUIT MODULE SHALL BE LABELED
SPARE AND MADE READY FOR USE UNDER NEW WORK.
DEMOLITION NOTES - ELECTRICAL
ET
CHILLER
CHILLER
GENERATOR
TSA
GFM
GFM
ED101
ELECTRICAL SITE
DEMOLITION PLAN
A
54321
B
C
D
E
KEY PLAN
APPROVED BY
CHECKED BY
REVISIONS
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SCALE
SEAL
NO. DESCRIPTION DATE
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F'
S O
FF
IC
E
D
ET
EN
TI
O N
C
EN
TE
R
G
EN
ER
AT
O R
BA
IN
S T, LI
LL
IN
G
TO
N
, N C
IS
SU
ED
F
O R
B
ID
05/14/2026
50190536
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
5/
/2
:2 5:
A
M P:
\5
6\ C
AD
\E
LE
C
TR
IC
AL
\5
ED
EL
EC
TR
IC
AL
S
IT
E D
EM
O
LI
TI
O N
P
LA
N .D
W G
1. REFER TO E-001 & E-002 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS
AND GENERAL NOTES.
2. REFER TO E-002 FOR GENERAL NOTES SPECIFIC TO DEMOLITION AND
RENOVATION ACTIVITIES.
3. REFER TO E-900 SERIES FOR RISER DIAGRAMS.
4. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEMOLITION
ACTIVITIES WITH OTHER TRADES PRIOR TO BEGINNING WORK.
5. COORDINATE SHUTDOWN OF UTILITY TRANSFORMER WITH UTILITY
SERVICE PROVIDER PRIOR TO BEGINNING WORK.
6. PROVIDE SEQUENCE OF CONSTRUCTION DETAILING TEMPORARY
SERVICE CONNECTIONS, EQUIPMENT LOCATIONS, CONDUCTOR
ROUTING, ETC. FOR REVIEW BY OWNER AND ENGINEER OF RECORD
PRIOR TO BEGINNING WORK.
1. DEMOLISH INDICATED DUCTBANK TO LOCATION AS INDICATED.
PREPARE DUCTBANK END FOR PROVISION OF HANDHOLE.
2. EXISTING TYPE 10, CLASS 96 GENERATOR SERVING FACILITY
EMERGENCY AND LEGALLY REQUIRED LOADS.
3. CONTRACTOR SHALL COORDINATE WITH UTILITY PROVIDER
FOR REMOVAL OF SECONDARY CONDUCTORS.
4. DISCONNECT AND REMOVE EXISTING NEUTRAL-GROUND
BOND CONNECTION FROM EXISTING DISCONNECT(S) TO
ELECTRODE SYSTEM. REMOVE ANY SIGNAGE ASSOCIATED
WITH THIS EQUIPMENT BEING A PART OF THE
NEUTRAL-GROUND BOND ELECTRODE SYSTEM.
SCALE:1 ELECTRICAL DEMOLITION SITE PLAN
1" = 10' 0' 10' 20'
GENERAL NOTES: KEYNOTES:#
10'-6"
32'-6"
NEW
GEN.
20'-6"
NEW EXTERIOR SWBD.
10'
3'-3 1/2"
NEW ATS
(41" x 62") NEW ECB
(36" x 39.5")
34'-6"
EPO
UP
UP
ET
CHILLER
CHILLER
GENERATORHH
B1
B2
B2
B2
HH
HH
B2
B1 HH
A1
A1
TSA
GFM
GFM
E-101
ELECTRICAL SITE
PLAN
A
54321
B
C
D
E
KEY PLAN
APPROVED BY
CHECKED BY
REVISIONS
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SCALE
SEAL
NO. DESCRIPTION DATE
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F'
S O
FF
IC
E
D
ET
EN
TI
O N
C
EN
TE
R
G
EN
ER
AT
O R
BA
IN
S T, LI
LL
IN
G
TO
N
, N C
IS
SU
ED
F
O R
B
ID
05/14/2026
50190536
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
5/
/2
:3 6:
A
M P:
\5
6\ C
AD
\E
LE
C
TR
IC
AL
\5
E-
EL
EC
TR
IC
AL
S
IT
E
PL
AN
.D
W G
1. TOP OF DUCTBANK SHALL BE NO LESS THEN 3'-0" BELOW
FINISHED GRADE.
2. TOP OF DUCTBANK SHALL BE NO LESS THEN 5'-0" BELOW
FINISHED GRADE.
3. SLOPE CONDUITS UP/DOWN TO HANDHOLES AS REQUIRED TO
MATCH DEPTHS OF EXISTING DUCTBANKS AT HANDHOLES.
PROVIDE HANDHOLES SIZED 36"x60"X36".
4. DIRECT BURIED CONDUIT FOR GENERATOR SHORE POWER
CONNECTION. RE: E-902.
5. NEUTRAL-GROUND BONDING SHALL BE PROVIDED AT NEW
ENCLOSED CIRCUIT BREAKER. PROVIDE SIGNAGE REQUIRED
PER NEC FOR SERVICE ENTRANCE EQUIPMENT.
6. PROVIDE EMERGENCY POWER OFF BUTTON. TWO-POLE, (1)
NORMALLY OPEN AND (1) NORMALLY CLOSED CONTACTS,
"DRY", MANUAL RESET, ALLEN-BRADLEY 800T-FX6AV OR
EQUIVALENT.
7. PROVIDE GFCI/WP/WR RECEPTACLE MOUNTED TO UNISTRUT
STAND. RECEPTACLE WILL SERVE AS A SERVICE RECEPTACLE
FOR NEW EXTERIOR SWITCHBOARD. CONNECT RECEPTACLE
TO NEW PANEL 'SLR1', LOCATED IN NEW GENERATOR
ENCLOSURE. PROVIDE A NEW 20A/1P CIRCUIT BREAKER
INSIDE DESIGNATED PANEL FOR CONNECTION OF
RECEPTACLE.
SCALE:1 ELECTRICAL SITE PLAN
1" = 10'
GENERAL NOTES: KEYNOTES:#
1. REFER TO E-001 & E-002 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS
AND GENERAL NOTES.
2. REFER TO E-002 FOR GENERAL NOTES SPECIFIC TO DEMOLITION AND
RENOVATION ACTIVITIES.
3. REFER TO E-900 SERIES FOR RISER DIAGRAMS.
4. REFER TO E-501 FOR DUCT BANK DETAILS.
5. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL RENOVATION
ACTIVITIES WITH OTHER TRADES PRIOR TO BEGINNING WORK.
6. COORDINATE RECONNECTION OF UTILITY TRANSFORMER WITH UTILITY
SERVICE PROVIDER PRIOR TO BEGINNING WORK.
7. PROVIDE SEQUENCE OF CONSTRUCTION DETAILING TEMPORARY
SERVICE CONNECTIONS, EQUIPMENT LOCATIONS, CONDUCTOR
ROUTING, ETC. FOR REVIEW BY OWNER AND ENGINEER OF RECORD
PRIOR TO BEGINNING WORK.
0' 10' 20'
MDP T1
PNL EDP
ATS ES
ATS LS
PNL LSDP
H1D
MPA
KB
KA
1 2
MDP T1
PNL EDP
ATS ES
ATS LS
PNL LSDP
H1D
MPA
KB
KA
1 2
TSA
GFM
GFM
E-111
ELECTRICAL
ROOM COMBINED
PLAN
A
54321
B
C
D
E
KEY PLAN
APPROVED BY
CHECKED BY
REVISIONS
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SCALE
SEAL
NO. DESCRIPTION DATE
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F'
S O
FF
IC
E
D
ET
EN
TI
O N
C
EN
TE
R
G
EN
ER
AT
O R
BA
IN
S T, LI
LL
IN
G
TO
N
, N C
IS
SU
ED
F
O R
B
ID
05/14/2026
50190536
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
5/
/2
:3 1:
A
M P:
\5
6\ C
AD
\E
LE
C
TR
IC
AL
\5
E-
EL
EC
TR
IC
AL
R O
O M
C O
M
BI
N
ED
P
LA
N .D
W G
WALL RATING LEGEND:GENERAL NOTES: KEYNOTES:#
SCALE:1 ELECTRICAL DEMOLITION PLAN
1/4" = 1'-0" 0' 4' 8'2'
1. REFER TO E-001 & E-002 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES.
2. REFER TO E-002 FOR GENERAL NOTES SPECIFIC TO DEMOLITION AND
RENOVATION ACTIVITIES.
3. REFER TO E-900 SERIES FOR RISER DIAGRAMS.
4. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEMOLITION ACTIVITIES
WITH OTHER TRADES PRIOR TO BEGINNING WORK.
5. COORDINATE SHUTDOWN OF UTILITY TRANSFORMER WITH UTILITY SERVICE
PROVIDER PRIOR TO BEGINNING WORK.
6. PROVIDE SEQUENCE OF CONSTRUCTION DETAILING TEMPORARY SERVICE
CONNECTIONS, EQUIPMENT LOCATIONS, CONDUCTOR ROUTING, ETC. FOR
REVIEW BY OWNER AND ENGINEER OF RECORD PRIOR TO BEGINNING WORK.
1. DISCONNECT AND REMOVE ALL EXISTING NEUTRAL-GROUND
BONDING AT THE EXISTING SWITCHBOARD TO THE
ELECTRODE SYSTEM. UPDATE ANY SIGNAGE ASSOCIATED
WITH THIS EQUIPMENT BEING THE PREVIOUS MAIN SERVICE
ENTRANCE.
2. ADD ALTERNATE: REPLACE EXISTING GE MAIN SWITCHBOARD
WITH SQUARE D, 3000A bus, 2000AF/1200AT LSIG MCB, 480Y/277V.
SCALE:1 ELECTRICAL NEW WORK PLAN
1/4" = 1'-0" 0' 4' 8'2'
GFM
E-501
DETAILS
A
54321
B
C
D
E
KEY PLAN
APPROVED BY
CHECKED BY
REVISIONS
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SCALE
SEAL
NO. DESCRIPTION DATE
H
AR
N
ET
T C
O U
N
TY
SH
ER
IF
F'
S O
FF
IC
E
D
ET
EN
TI
O N
C
EN
TE
R
G
EN
ER
AT
O R
BA
IN
S T, LI
LL
IN
G
TO
N
, N C
IS
SU
ED
F
O R
B
ID
05/14/2026
50190536
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
5/
/2
:4 0:
A
M P:
\5
6\ C
AD
\E
LE
C
TR
IC
AL
\5
E-
D
ET
AI
LS
.D
W G
MAIN GROUNDING FIELD SCALE: NTS
E080-07
GRADE LINE
FROM MAIN SERVICE
TO GND ROD TO GND ROD
6"
10'-0"
10'-0"10'-0"
GROUNDING CONNECTIONS
VIA CADWELD PROCESS
(TYP)
3/4" X10' LONG CU
GROUND ROD
(TYP 3)
#3/0 BARE COPPER GROUND
IN 1" PVC TO MAIN GROUND
BUS IN MAIN SERVICE PANEL
GRADE MOUNTED PULL BOX
PACKED CLEAN SAND
CADWELD CONDUCTORS
TO GROUND ROD WITH NT
TYPE CONNECTOR
3/4" X10' LONG CU
GROUND ROD
#3
BARE
COPPER
GROUND
GENERATOR PAD GROUNDING SCALE: NTS
E080-08
3/4" X 10' COPPER CLAD GROUND ROD
WITH EXOTHERMIC WELDED CONNECTIONS
TO GROUNDING CONDUCTORS TYPICAL
PROVIDE
GROUNDING RING
AROUND NEW
GENERATOR PAD
GROUND ROD WITH EXOTHERMIC
WELDED CONNECTION TO
GROUNDING CONDUCTORS TYPICAL
20' CONCRETE ENCASED GROUND
ROD PER NEC 250.52(A)(3) LOCATED
IN NEW GENERATOR PAD TYPICAL
#3/0 COPPER
CONDUCTOR IN
CONDUIT TO GND BAR
BELOW SLAB GROUND
RING CONDUCTOR.
#3/0 BARE COPPER,
TYPICAL
#3/0 BARE COPPER
CONDUCTOR IN
CONDUIT
ELECTRICAL EQUIPMENT LABELING SCALE: NTS
E002-10
3/8" LETTERS
3/16" LETTERS
A2NL4
NORMAL
208/120VAC, 100A MLO
3PH, 4W, 10KAIC
FED FROM:
LOCATED:
C4SHXFR2
LIFE SAFETY
15KVA, 480-208/120VAC
3PH, 4W
FED FROM:
LOCATED:
SERVES:
LOCATED:
TYPICAL
PANEL LABEL
TYPICAL
TRANSFORMER
LABEL
B3QHVFD2
EQUIPMENT
480VAC, 30A OCPD
3PH, 4W, 22KAIC
FED FROM:
LOCATED:
SERVES:
LOCATED:
TYPICAL
ECB/SAFETY SWITCH/STARTER/VFD
LABEL
TYPICAL
TRANSFER SWITCH
LABEL
D1CHATS2
CRITICAL
480VAC, 800A OCPD
3PH, 4W, 65KAIC
NORMAL FED FROM: _________________
LOCATED: __________________________
ESSENTIAL FED FROM:
LOCATED: __________________________
SERVES:
LOCATED: __________________________
NOTES:
1. ALL ELECTRICAL EQUIPMENT LABELS SHALL BE ENGRAVED, PHENOLIC PLASTIC
LAMINATE, MINIMUM 1/16" THICK.
2. ALL ELECTRICAL EQUIPMENT LABELS SHALL BE DRILLED OR PUNCHED FOR
MECHANICAL FASTENERS. THE USE OF ADHESIVE LABELS FOR ELECTRICAL
EQUIPMENT IDENTIFICATION IS STRICTLY PROHIBITED.
3. ELECTRICAL EQUIPMENT LABEL HEIGHT AND LENGTH AS REQUIRED.
4. REFER TO APPLICABLE SPECIFICATION "IDENTIFICATION FOR ELECTRICAL
SYSTEMS" FOR ELECTRICAL EQUIPMENT LABEL SURFACE AND CORE COLOR
CODING REQUIREMENTS.
5. PROVIDE LABEL FOR ALL ECBs, SAFETY SWITCHES, STARTERS AND VFDs PROVIDED
BY DIVISION 22, 23 OR 26 CONTRACTORS.
6. "OCPD" SHALL INDICATE SIZE OF UPSTREAM OVER CURRENT PROTECTIVE DEVICE
AND NOT PROTECTIVE DEVICE(S) INTERNAL TO LABELED EQUIPMENT.
7. "LOCATED" SHALL INDICATE SOURCE OR LOAD LOCATION PER FINAL ROOM
SIGNAGE. INDICATING LOCATION AS "THIS ROOM" OR OTHER SIMILAR DESCRIPTION
WITHOUT ROOM NUMBER IS STRICTLY PROHIBITED.
8. REFER TO SHOP DRAWINGS, SUBMITTALS AND VENDOR PROVIDED
DOCUMENTATION FOR EQUIPMENT KAIC VALUES.
AHU#4 CONTROLS
EQUIPMENT
120VAC, 20A OCPD
1PH, 2W, 5KAIC
FED FROM:
LOCATED:
TYPICAL
CONTROL PANEL/EQUIPMENT
LABEL
3/8" LETTERS
3/16"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .