50007-SB#7677.pdf
PDF 9 MB Posted
- Attached to
- BAS Repairs & Upgrades for NSU
- Solicitation number
- 50007-SB#7677
- Issued by
- Plaquemines Parish, New Orleans City, Louisiana
About this file
This is an Invitation for Bid (IFB) document from Northwestern State University in Natchitoches, Louisiana for Building Automation System (BAS) Repairs & Upgrades. The project (01-107-24-05, F.01004613, JLCB Item #227) involves furnishing and installing a complete Siemens Desigo CC building automation system to replace and upgrade the existing legacy Apogee system across the NSU campus. The scope includes migrating approximately 23 panels from Apogee to Desigo CC, upgrading selected P2 panels to BACnet communication, modernizing MBC and MEC controllers to PXC series platforms, configuring 1,969 new physical I/O points, integrating 2,577 existing points into Desigo CC, migrating 1,103 trend views, and developing custom graphics and reports. The system shall incorporate energy reporting and data analytics software and include all programming, commissioning, training, and documentation. A mandatory prebid conference is scheduled for 10:00 AM on Tuesday, March 17, 2026, at NSU Physical Plant, Conference Room, 998 South Jefferson, Natchitoches, Louisiana 71497. Sealed bids are due by 2:00 PM on Thursday, March 26, 2026, at the NSU Purchasing Office, St. Denis Hall, 200 Sam Sibley Drive. The contractor shall complete all work within 365 consecutive calendar days from the Notice to Proceed, with liquidated damages assessed at $1,000 per calendar day for delays. The system must be programmed and commissioned by Siemens-qualified personnel, and the contractor shall provide four operator training sessions totaling 16 hours upon project completion.
Pricing shall be submitted on the Louisiana Uniform Public Bid Form with a base bid and any applicable alternates. Unit prices must be FOB Destination/Agency with title passing upon acceptance. Bid security in the form of a certified check or bid bond equal to 5 percent of the total bid amount (including base bid and additive alternates) is required at the time of bid submission. The selected contractor must execute a contract, performance bond, and labor and materials payment bond equal to 100 percent of the contract sum within 10 days of notification of award. The contractor must hold a valid Louisiana State Contractor's License for the Mechanical classification and maintain builders' risk/all-risk property insurance covering the full contract sum. No state sales tax applies to this contract; the contractor is responsible for all applicable state and local taxes. The project is contingent upon state bond commission approval and legislative appropriation of funds. Northwestern State University reserves the right to award items separately, in groups, or on an all-or-none basis and to reject any or all bids. Award will be made to the lowest responsible bidder meeting all specifications and quality requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING AUTOMATION SYSTEM (BAS)
REPAIRS & UPGRADES
FOR
NORTHWESTERN STATE UNIVERSITY
PROJECT # 01-107-24-05
F.01004613;
JLCB ITEM #: 227
NORTHWESTERN STATE UNIVERSITY
President:
James T Genovese
Director of Purchasing:
Ashley Grayson
Prepared by:
Associated Design Group, Inc.
3909 West Congress Street, Suite 201
Lafayette, LA 70506 P: 337.234.5710 www.adginc.org | adginc@adginc.org
FIRM REGISTRATIONS:
Associated Design Group, Inc. - 2013
ADG Engineering - 6186 R. Craig Campbell, II, PE - 29380
David B. Stelly, PE - 26070
PROJECT #:25062
FEBRUARY 13, 2026
mailto:adginc@adginc.org
BUILDING AUTOMATION SYSTEM (BAS)
REPAIRS & UPGRADES
FOR
NORTHWESTERN STATE UNIVERSITY
PROJECT # 01-107-24-05
F.01004613;
JLCB ITEM #: 227
ADG PROJECT #:25062
TABLE OF CONTENTS
DIVISION 00
ADVERTISEMENT FOR BID
INSTRUCTION TO BIDDERS
NOTICE TO BIDDERS
CERTIFICATION STATEMENT
INDEMNIFICATION AGREEMENT
AIA 201 GENERAL CONDITIONS OF THE CONTRACT
SUPPLEMENTARY CONDITIONS
BID FORM
BID BOND FORM
SAMPLE CONTRACT BETWEEN OWNER AND CONTRACTOR / PAYMENT AND PERFORMANCE BOND
ATTESTATION AFFIDAVIT
SCHEDULE OF VALUES
CHANGE ORDER FORMS
PARTIAL OCCUPANCY FORM
RECOMMENDATION OF ACCEPTANCE
LIQUIDATED DAMAGES ASSESSMENT
DIVISION 01
01 04 00 PROJECT COORDINATION
01 06 50 SAFETY
01 20 00 PROJECT MEETINGS
01 30 00 SHOP DRAWINGS SUBMITTALS, PRODUCT DATA AND SUBMITTALS
01 70 00 PROJECT CLOSEOUT
01 72 00 RECORD DRAWINGS
DIVISION 23
23 00 10 MECHANICAL GENERAL PROVISIONS
23 00 20 BASIC MATERIALS AND METHODS
23 09 00 BUILDING AUTOMATION SYSTEM
23 09 00 SIEMENS DESIGO MIGRATION
SB# 7677
BID NUMBER:
DATE: 03/03/2026
NORTHWESTERN STATE UNIVERSITY
Business Affairs – Purchasing Section St. Denis Hall/ 200 Sam Sibley Dr.
Natchitoches, Louisiana 71497
(318) 357-5716 email: purchasing@nsula.edu
INVITATION FOR BID: Sealed bid, subject to the conditions herein stated and attached hereto, will be received at this office until 2 pm Thursday, March 26th, 2026, and then publicly opened for furnishing the items and/or services as described below for Northwestern State University:
Mandatory Pre-Bid Conference: A mandatory Prebid conference will be held at 10:00 AM Tuesday, March 17th, 2026, at the following location: NSU Physical Plant, Conference Room, 998 South Jefferson, Natchitoches, La 71497.
DESCRIPTION
BIDDERS PLEASE FILL IN ALL BLANK SPACES AND SIGN BELOW
Terms will be and shipment will be received within days after receipt of order.
In compliance with and subject to the conditions thereof, the undersigned offers and agrees, if this bid be accepted within thirty (30) days from date of opening, to furnish any or all of the items (or sections) at the price set opposite each item (or section).
VENDOR NAME SIGNATURE AUTHORITY (Re: L.R.S. 39:1594(Act 121)
ADDRESS PRINTED OR TYPED NAME / TITLE
CITY, STATE, ZIP FEDERAL TAX IDENTIFICATION NUMBER (FIN)
TELEPHONE NUMBER EMAIL
DATE
ACCEPTANCE /AWARD
Date of Award and Execution
Recommendation:________________________________________________________________________________________________________
Approved: _______________________________________
Ashlee Grayson, Director of Purchasing
Building Automation System (BAS) Repairs & Upgrades for Northwestern State University
SB # 7677
mailto:purchasing@nsula.edu
INSTRUCTIONS TO BIDDERS
1. Bid Forms
All written bids, unless otherwise provided for, must be submitted on, and in accordance with, forms provided, properly signed. Bids submitted in the following manner will not be accepted:
l. Bid contains no signature indicating intent to be bound;
2. Bid filled out in pencil; and
3. Bid not submitted on NSU’s standard forms.
Bids must be received at the address specified in the Invitation for Bids prior to bid opening time in order to be considered. Any bid received after bid opening time will be returned to sender unopened.
Telegraphic and fax alterations to bids received before bid opening time will be considered provided formal bid and written alteration have been received and time-stamped before bid opening time.
2. Submission of Bids
Firms/individuals who are interested in providing services requested under this ITB must submit a bid containing the information specified in this solicitation. The bid must be received in hard copy (printed) by the Purchasing Office on or before (2:00 PM) Central Daylight Time on the date specified. FAX or e-mail submissions are not acceptable. Bidders mailing their submittals shall allow sufficient mail delivery time to ensure receipt of their submittal by the time specified. The submitted bid must be delivered at the Bidder's expense to:
Attn: Ashlee Grayson Director of Purchasing Business Affairs/St. Denis Hall 200 Sam Sibley Drive Northwestern State University Natchitoches, Louisiana 71497
*****Submittals should have ITB #7677 clearly printed on all documents and shipping containers, failure to clearly label submittals may result in rejection. *****
For courier delivery, the street address above and the telephone number is (318-357-5716). It is solely the responsibility of each Bidder to ensure that their submittal is delivered at the specified place and prior to the deadline for submission. Submittals received after the deadline will not be considered.
NSU requests that (1) copy of the solicitation be submitted to the Purchasing Office at the address specified. The bid shall contain original signatures of those company officials or agents duly authorized to sign bids or contracts on behalf of the organization. A certified copy of a board resolution granting such authority shall be submitted if Bidder is a corporation. The bid with original signatures will be retained for incorporation in any contract resulting from this ITB.
3. Required Bid Submittals: The following documents must be submitted in full at the time of the sealed bid opening:
1. Louisiana Uniform Public Bid Form, including:
a) Base Bid
b) Alternates
c) Acknowledgement
2. Unit Price Form
3. Bid Security
4. Corporate Resolution or other satisfactory evidence of authority
5. Louisiana Contractor’s License Number
6. Signed Instructions to Bidders
Failure to provide any of the above documents at the time of bid submission may render the bid non-responsive and subject to rejection.
4. Time for Completion and Liquidated Damages: Following the issuance of a Notice to Proceed, the Contractor shall have three hundred sixty-five (365) consecutive calendar days to complete all work. Failure to complete the work within this timeframe will result in the assessment of liquidated damages at the rate of One Thousand dollars ($1,000.00) per calendar day, beginning on the first day after the established completion date and continuing until the work is satisfactorily completed.
5. Prices: The bidder must state the prices (written in ink, in figures) for which he proposes to furnish each item and shall show the total extended amount for each based on the quantities shown. In case, however, of conflict between the unit price and the extended amount, the unit price shall govern. Unit prices should be inclusive of any freight charges.
6. F.O.B: Bid should be FOB Destination/Agency, title passing upon acceptance of merchandise.
Failure to comply with this requirement may disqualify your bid.
7. Standard of Quality: Any product or service bid shall conform to all applicable Federal and State laws and regulations and the specifications contained in the ITB. Unless otherwise specified in the ITB, any manufacturer’s name, trade name, brand, name, or catalog number used in the specifications is for the purpose of describing the quality level and characteristic required. Bidder must specify the brand and model number of the product offered in his bid. Bids not specifying brand and model number shall be considered as offering the exact products specified in the ITB.
8. Descriptive Information: Bidders proposing an equivalent brand or model should submit with the bid information (such as illustrations, descriptive literature, and technical data) sufficient for NSU Purchasing to evaluate quality, suitability, and compliance with the specifications in the ITB. Failure to submit descriptive information may cause bid to be rejected. Any change made to a manufacturer’s published specifications submitted for a product shall be verifiable by the manufacturer. If item(s) bid do not fully comply with specifications (including brand and/or product number), bidder must state in what respect the item(s) deviate. Failure to note exceptions on the bid form will not relieve the successful bidder(s) from supplying the actual products requested.
MANUFACTURER’S NUMBERS AND TRADE NAMES: Where the manufacturer’s product is named or specified, it is understood that “or equal” shall apply, whether stated or not. Such name and number is meant to establish the standard, type, quality, style, etc. Northwestern State University shall be the sole judge as to whether or not the equipment offered is equal to that specified.
9. Interpretation of Solicitation/Bidder Inquiries: If Bidder is in doubt as to the meaning of any part or requirement of this solicitation, Bidder may submit a written request for interpretation to the Buyer-of-Record at purchasing@nsula.edu. Written inquiries must be received in the NSU Purchasing Office no later than five (5) calendar days prior to the opening of bids and must clearly cross-referenced to the bid/solicitation/specification number in subject field of the email request.
mailto:purchasing@nsula.edu
No decisions or actions shall be executed by any Bidder as a result of oral discussions with any TBA Studio and/or NSU employee or consultant. Any interpretation of the documents will be made by formal addendum only, issued by the TBA Studios, and mailed or delivered to all Bidders known to have received the solicitation. TBA Studios shall not be responsible for any other interpretations or assumptions made by Bidder.
3. Bid Opening: Bidders may attend the bid opening, but no information or opinions concerning the ultimate contract award will be given at the bid opening or during the evaluation process. Bids may be examined 72 hours after request is made. Information pertaining to completed files may be secured by visiting Northwestern State University Purchasing during normal working hours. Written bid tabulations will not be furnished.
4. Award: Award will be made to the lowest responsible bidder, taking into consideration the quality of the products to be supplied, their conformity with specifications, the purposes for which they are required, and the time for delivery. Northwestern State University Purchasing reserves the right to award items separately, grouped or on an all-or-none basis and to reject any or all bids and waive any informalities.
5. Purchase Order: If any bid or bids are accepted, an initial purchase order or orders for the entire number of units or part thereof, will be issued not later than thirty (30) days after receipt of bids by the Owner to the lowest bidder offering products which, in the opinion of the University, meet the requirements of these specifications.
6. Conditions of Purchase Orders: We will not in any manner be responsible for goods delivered or work done for our account without a written order. No allowance for boxing or crating. If you cannot fill order as directed, return for advice. Quantities in excess of the order may be returned or held subject to shipper’s order, expense and risk. By accepting the order, you hereby warrant that the merchandise to be furnished hereunder will be in full conformity with the specifications, drawing or sample and agree that this warrant shall survive acceptance of the merchandise and that you will bear the cost of inspecting merchandise rejected. Northwestern State University reserves the right to purchase additional quantities at the same price, terms and conditions for a period of ninety (90) days from the date of order based upon vendor acceptance.
7. Inspection and Acceptance: Upon delivery of each item to the Agency, inspection of the item will be made by Northwestern State University, or their representative, at the point of delivery, or in special cases, at point of origin. Acceptance of the item will be made after inspection determines that all requirements of the specifications and the proposal have been met.
8. U.S. Taxpayer Identification Number: Vendor must include an IRS Form W-9 and enter your taxpayer identification number in the appropriate space on the Specifications and Bid Form Page. For individuals and sole proprietors, this is your social security number. For other entities, it is your employer identification number. PAYMENT CANNOT BE PROCESSED WITHOUT YOUR TAX
I.D. NUMBER.
9. Taxes: The State is exempt from sales/use tax. Vendor is responsible for including all other applicable taxes in the bid price.
10. Builders Risk Insurance: Contractor shall purchase and maintain builders’ risk/all-risk property insurance covering all physical loss or damage to the work, materials, equipment, and supplies, including temporary structures, in the amount of the Contract Sum. Coverage shall commence at the start of construction and continue until final acceptance by the Owner. The insurance shall include the Owner as named insured and contain a waiver of subrogation in favor of the Owner.
Bidders shall submit with their bids a Certificate of Insurance or a Letter of Insurability acceptable to the Owner demonstrating that the Builders Risk Insurance requirement will be met. Failure to submit said Certificate or Letter with the bid may result in the bid being declared non-responsive.
11. New Products: Unless specifically called for in the ITB, all products for purchase must be new, never previously used, and the current model and/or packaging. No remanufactured, demonstrator, used or irregular product will be considered for purchase unless otherwise specified in the ITB. The manufacturer’s standard warranty will apply unless otherwise specified in the ITB.
12. Contract Renewals: Upon Agreement of Northwestern State University Purchasing and the contractor, an open-ended requirements contract may be extended for 2 additional 12-month periods at the same prices, terms and conditions. In such cases, the total contract term cannot exceed 36 months.
13. Contract Cancellation: Northwestern State University has the right to cancel any contract for cause, in accordance with purchasing rules and regulations, including buy not limited to: (1) failure to deliver within the time specified in the contract; (2) failure of the product or service to meet specifications, conform to sample quality or to be delivered in good condition; (3) misrepresentation by the vendor; (4) fraud, collusion, conspiracy or other unlawful means of obtaining any contract with the University; (5) conflict of contract provisions with constitutional or statutory provision of state of federal law; (6) any other breach of contract. Northwestern State University has the right to cancel any contract for convenience at any time by giving thirty (30) days written notice to the vendor. In such cases, the vendor shall be entitled to payment for compliant deliverables in progress.
14. Default of Contractor: Failure to deliver within the time specified in the bid will constitute a default and may cause cancellation of the contract. Where the Northwestern State University Purchasing has determined the contractor to be in default, NSU Purchasing reserves the right to purchase any or all products or services covered by the contract on the open market and to charge the contractor with cost in excess of the contract price. Until such assessed charges have been paid, no subsequent bid from the defaulting contractor will be considered.
15. Order of Priority: In the event there is a conflict between the Instructions to Bidders or General Conditions and the Special Conditions, the Special Conditions shall govern.
16. Applicable Law: All contracts shall be construed in accordance with governed by the laws of the State of Louisiana
17. LICENSED CONTRACTOR: A Louisiana State Contractor's License for the classifications of Mechanical. will be required for this bid. The Louisiana Contractor's License number must be listed on the outside of the bid envelope.
A. In accordance with Louisiana Revised Statutes 39:1595, a preference not to exceed 10% may be allowed for paper and paper products manufactured or converted in Louisiana of equal quality. For paper supplied in wrapped reams, each carton and each individual ream shall be clearly labeled with the name of the manufacturer or converter and the location within Louisiana where such paper is manufactured or converted. For paper and paper products supplied in bulk or in other forms, the smallest unit of packaging shall be clearly labeled with the name of the manufacturer or converter and the location within Louisiana where such paper or paper product is manufactured or converted.
Do you claim this preference? Yes
Specify Item Number(s)
Name and location within Louisiana where such paper or paper product is manufactured or converted:
18. Discrimination and EEOC COMPLIANCE: The contractor agrees to abide by the requirements of the following as applicable: Title VI and VII of 1972, Federal Executive Order 11246, the Federal Rehabilitation Act of 1973, as amended, the Vietnam Era Veteran’s Readjustment Assistance Act of 1974, Title IX of the Education Amendments of 1972, the Age Act of the Civil Rights Act of 1964, as amended by the Equal Opportunity Act 1972, and contractor agrees to abide by the requirements of the Americans With Disabilities Act of 1990: Contractor agrees not to discriminate in its employment practices, and will render services under this contract without regard to race, color, religion, sex, national origin, veteran status, political affiliation, disabilities, or in accordance with KBB 2004-54 because of an individual’s sexual orientation. Any act of discrimination committed by Contractor, or failure to comply with these statutory obligations when applicable shall be grounds for termination of this contract.
19. Standard Preference:
20. Scope of Contract: Furthermore, submittal of any terms and conditions contrary to those of the State of Louisiana may cause your bid to be rejected. By signing this form terms and conditions which may be included in your bid are nullified, and contractor agrees that this contract shall be construed in accordance with and governed by the laws of the State of Louisiana.
B. A preference not to exceed 10% may be allowed for products manufactured, produced, grown, or assembled in Louisiana of equal quality.
Do you claim this preference? Yes
Specify Item Number(s) Specify location within Louisiana where this product is manufactured, produced, grown or assembled:
If so, do you certify that at least fifty percent (50%) of your Louisiana business workforce is comprised of Louisiana residents?
Yes: No:
[Note: If more space is required, include on separate sheet. Failure to specify above information may cause elimination from preferences. Preferences shall not apply to service contracts.]
21. Right to Audit: The Contractor agrees that the University and the Legislative Auditor of the State of Louisiana shall have access to, and the right to audit and examine, any pertinent books, documents, papers, and records of the Contractor related to this bid and any resulting contract agreement.
22. Official University Recognized Holidays: The following is a list of officially recognized University Holidays:
New Year’s Day Juneteenth Martin Luther King Day July 4th Mardi Gras Day Labor Day Good Friday Thanksgiving Day Memorial Day Christmas Day
(Members of firm or person authorized to sign bids for corporation)
BIDDERS MUST SIGN IN INK
I M P O R T A N T
Signature Authority: In Accordance with L.R.S.39:1594 (Act 121), the person signing the bid must be:
a. A current corporate officer, partnership member of other individual specifically authorized to submit a bid as reflected in the appropriate records on file with the Secretary of State; or
b. An individual authorized to bind the vendor as reelected by an accompanying corporate resolution, certificate or affidavit; or
c. An individual listed on the State of Louisiana Bidder’s Application as authorized to execute bids.
By signing the bid, the bidder certified compliance with the above.
WE ARE AN EQUAL OPPORTUNITY UNIVERSITY
NOTICE TO BIDDERS
Bid security must be attached (insurance company, bank money order, certified check or cashier's check) in the sum of five percent (5%) of the amount bid (including base bid and additive alternates, if any) and shall become the property of the owner in the event the contract and bond are not executed within the time set forth above. If bid bond is used, it shall be written by a surety or insurance company currently on the U.S. Department of the Treasury Financial Management service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A- rating in the latest printing of the A.M. Best's Key Rating Guide to write individual bonds up to ten percent of policyholders' surplus as shown in the A.M. Best's Key Rating Guide, or by an insurance company that is either domiciled in Louisiana or owned by Louisiana residents and is licensed to write surety bonds. In addition, the bond shall be written by a surety or insurance company that is currently licensed to do business in the State of Louisiana.
Bids shall be accepted only from Contractors who are licensed under La. R.S. 37:2150-2163 for the classification(s) such as Building Construction work. No bid may be withdrawn for a period of thirty (30) days after receipt of bids. IN ACCORDANCE LA R.S. 37:2163
“ANYONE OBJECTING TO THE CLASSIFICATION MUST SEND A CERTIFIED
LETTER TO BOTH THE LOUISIANA STATE LICENSING BOARD FOR
CONTRACTORS AND THE OFFICE OF STATE PURCHASING. THE LETTER
MUST BE RECEIVED NO LATER THAN TEN WORKING DAYS PRIOR TO THE
DAY ONWHICH BIDS ARE TO BE OPENED.
When this project is financed either partially or entirely with State Bonds, the award of this Contract is contingent upon the sale of bonds by the State Bond Commission. The State shall incur no obligation to the Contractor until the Contract between Owner and Contractor is fully executed.
CONTRACT, PERFORMANCE BOND, LABOR AND MATERIALS PAYMENT BOND:
If the undersigned is notified of the acceptance of the above bid or bids, within thirty (30) days of the time set forth for the opening of bids, he agrees to execute a contract for the work accepted, in the standard contract form currently used by Northwestern State University of Louisiana within ten (10) days after notice from NSU.
The undersigned further agrees, if awarded the contract, to execute and deliver to NSU at the time the contract documents are executed, a Performance Bond with Power of Attorney, on the forms provided, in an amount equal to the contract sum and agrees that this bond will be secured by a surety or insurance company currently on the U.S. Department of the Treasury Financial Management Service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A- rating in the latest printing of the A.M. Best's Key Rating Guide to write individual bonds up to ten percent of policyholders' surplus as shown in the A.M. Best's Key Rating Guide, or by an insurance company that is either domiciled in Louisiana or owned by Louisiana residents and is licensed to write surety bonds. In addition, the bond shall be written by a surety or insurance company that is currently licensed to do business in the state of Louisiana. Also, to be provided at the same time is a Labor and Materials Payment Bond in an amount equal to 100% of the contract amount.
CERTIFICATION STATEMENT
The undersigned hereby acknowledges she/he has read and understands all requirements and specifications of the Invitation to Bid (ITB), including any attachments.
OFFICIAL CONTACT. The University requests that the Bidder designate one person to receive all documents and the method in which the documents are best delivered. Identify the Contact name and fill in the information below: (Print Clearly)
Date Official Contact Name:
A.
E-mail Address:
B.
Telephone Number with area code: ( )
C. Facsimile Number with area code: ( )
Bidder certifies that the above information is true and grants permission to the University to contact the above- named person or otherwise verify the information provided. By its submission of this Proposal and authorized signature below, Bidder certifies that:
1. The information contained in its response to this ITB is accurate.
2. Bidder complies with each of the mandatory requirements listed in the ITB and will meet or exceed the requirements specified therein.
3. Bidder agrees to provide all tasks, services, and deliverables listed in Scope of Services for the total cost stated on Bid Form;
4. Bidder accepts the procedures, evaluation criteria, mandatory contract terms, and all other administrative requirements set forth in this ITB.
5. Bidder confirms that its bid will be considered valid until award is made.
6. In making this bid, each Bidder represents that: They have read and understand the bid documents and the bid is made in accordance herewith, and the bid is based upon the specifications described in the bid documents without exception.
7. Bidder certifies, by signing and submitting a proposal for $25,000 or more, that their company, any subcontractors, or principals are not suspended or debarred by the General Services Administration (GSA) in accordance with the requirements in OMB Circular A-133. (A list of parties who have been suspended or debarred can be viewed via the internet at www.epls.gov .)
Professional Job Title:
Official Company Name:
Street Address:
City: State: Zip:
SIGNATURE of Bidder’s Authorized Representative:
(Signature MUST be HAND SIGNED and should be in Blue ink)
Date:
http://www.epls.gov/
INDEMNIFICATION AGREEMENT
The _____________________________{Contractor/Lessee} agrees to protect, defend, indemnify, save, and hold harmless, the State of Louisiana, all State Departments, Agencies, Boards and Commissions, its officers, agents, servants, employees, and volunteers, from and against any and all claims, damages, expenses, and liability arising out of injury or death to any person or the damage, loss or destruction of any property which may occur, or in any way grow out of, any act or omission of _____________________________{Contractor/Lessee}, its agents, servants, and employees, or any and all costs, expenses and/or attorney fees incurred by
___________________________ {Contractor/Lessee} as a result of any claims, demands, suits or causes of action, except those claims, demands, suits, or causes of action arising out of the negligence of the State of Louisiana, all
State Departments, Agencies, Boards, Commissions, its officers, agents, servants, employees and volunteers.
_________________________ {Contractor/Lessee} agrees to investigate, handle, respond to, provide defense for and defend any such claims, demands, suits, or causes of action at its sole expense and agrees to bear all other costs and expenses related thereto, even if the claims, demands, suits, or causes of action are groundless, false or fraudulent. The State of Louisiana may, but is not required to, consult with the Contractor in the defense of claims, but this shall not affect the Contractor’s responsibility for the handling of and expenses for all claims.
Accepted by ______________________________________________ Company Name
Signature
Title
Date Accepted ____________________________________________
Is Certificate of Insurance Attached? ______Yes ______No
Contract No. ________________________for __________________________________________ State Agency Name
PURPOSE OF CONTRACT: _________________________________________________________
July 2021 SC 1
SUPPLEMENTARY CONDITIONS
These Supplementary Conditions modify, change, delete from or add to the General Conditions of the Contract for Construction, AIA Document A201, 2017 Edition. Where any Article of the General Conditions is modified or any Section, Paragraph, Subparagraph or Clause thereof is modified or deleted by these supplements, the unaltered provisions of that Section, Article, Paragraph, Subparagraph or Clause shall remain in effect.
Articles, Sections, Paragraphs, Subparagraphs or Clauses modified or deleted have the same numerical designation as those occurring in the General Conditions.
ARTICLE 1
GENERAL PROVISIONS
1.1 BASIC DEFINITIONS
1.1.1. The Contract Documents
In Section 1.1.1 delete the third sentence, and add the following sentence:
The Contract Documents shall include the Bid Documents as listed in the Instructions to Bidders and any modifications made thereto by addenda.
1.1.8 Initial Decision Maker
Delete all after the words, “shall not show partiality to the Owner or Contractor”.
1.5 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER
INSTRUMENTS OF SERVICE [REFER TO La R.S. 38:2317]
1.5.1 Delete the first sentence of the paragraph.
1.5.1 In the third sentence: delete the remainder after the word “publication”.
1.7 DIGITAL DATA USE AND TRANSMISSION
In the first sentence after the words, “in digital form” delete “. The parties will use AIA Document E203 2013, Building Information Modeling and Digital Data Exhibit”.
1.8 BUILDING INFORMATION MODELS USE AND RELIANCE
Delete Section 1.8.
ARTICLE 2
OWNER
2.2 EVIDENCE OF THE OWNER’S FINANCIAL ARRANGEMENTS
Delete Section 2.2.
July 2021 SC 2
2.3 INFORMATION AND SERVICES REQUIRED OF THE OWNER
2.3.1 In the first sentence, delete: all before “the Owner shall secure…”
Delete Section 2.3.2 and substitute the following:
2.3.2 The term Architect, when used in the Contract Documents, shall mean the prime Designer (Architect, Engineer, or Landscape Architect), or his authorized representative, lawfully licensed to practice architecture, engineering, or landscape architecture in the State of Louisiana, identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number.
2.3.3 Delete the words: “to whom the Contractor has no reasonable objection and”.
ARTICLE 3
CONTRACTOR
3.4 LABOR AND MATERIALS
3.4.2 Delete Section 3.4.2.
Delete Section 3.4.3 and substitute with the following:
3.4.3 Contractor and its employees, officers, agents, representatives, and Subcontractors shall conduct themselves in an appropriate and professional manner, in accordance with the Owner’s requirements, at all times while working on the Project. Any such individual who behaves in an inappropriate manner or who engages in the use of inappropriate language or conduct while on Owner’s property, as determined by the Owner, shall be removed from the Project at the Owner’s request. Such individual shall not be permitted to return without the written permission of the Owner. The Owner shall not be responsible or liable to Contractor or any Subcontractor for any additional costs, expenses, losses, claims or damages incurred by Contractor or its Subcontractor as a result of the removal of an individual from the Owner’s property pursuant to this Section.
The Contractor shall not permit employment of unfit persons or persons not properly skilled in tasks assigned to them.
3.5 WARRANTY
3.5.2 Replace reference to “Section 9.8.4” with “Section 9.8.6”.
3.7 PERMITS, FEES, NOTICES, AND COMPLIANCE WITH LAWS (La R.S. 40:1724[A])
3.7.1 Delete Section 3.7.1.
3.7.2 In Section 3.7.2, replace the word “public” with the word “State”.
Delete Section 3.7.5 and substitute the following:
July 2021 SC 3
3.7.5 If, during the course of the Work, the Contractor discovers human remains, unmarked burial or archaeological sites, burial artifacts, or wetlands, which are not indicated in the Contract Documents, the Contractor shall follow all procedures mandated by State and Federal law, including but not limited to La R.S. 8:671 et seq., the Office of Coastal Protection and Restoration, and Sections 401 & 404 of the Federal Clean Water Act.
Request for adjustment of the Contract Sum and Contract Time arising from the existence of such remains or features shall be submitted in writing to the Owner pursuant to the Contract Documents.
3.8 ALLOWANCES
Delete Sections 3.8.1, 3.8.2, and 3.8.3 in their entirety and add the following new Section 3.8.1:
3.8.1 Allowances shall not be made on any of the Work.
3.9 SUPERINTENDENT
3.9.1 Add the following to the end of the paragraph:
Important communications shall be confirmed in writing. Other communications shall be similarly confirmed on written request in each case.
3.10 CONTRACTOR’S CONSTRUCTION AND SUBMITTAL SCHEDULES
3.10.1 Add the following: For projects with a contract sum greater than $1,000,000.00, the Contractor shall include with the schedule, for the Owner’s and Architect’s information, a network analysis to identify those tasks which are on the critical path, i.e., where any delay in the completion of these tasks will lengthen the project timescale, unless action is taken. A revised schedule shall be submitted with each Application and Certificate for Payment. No payment shall be made until this schedule is received.
3.10.3 In the first sentence, delete the word “general”.
After the first sentence, add the following:
If the Work is not on schedule, as determined by the Architect, and the Contractor fails to take action to bring the Work on schedule, then the Contractor shall be deemed in default under this Contract and the progress of the Work shall be deemed unsatisfactory.
Such default may be considered grounds for termination by the Owner for cause in accordance with Section 14.2.
Add the following Sections:
3.10.4 Add the following: Submittal by the contractor of a schedule or other documentation showing a completion date for his Work prior to the completion date stated in the contract shall not impose any obligation or responsibility on the Owner or Architect for the earlier completion date.
3.10.5 In the event the Owner employs a commissioning consultant, the Contractor shall cooperate fully in the commissioning process and shall require all subcontractors and
July 2021 SC 4 others under his control to cooperate. The purpose of such services shall be to ensure that all systems perform correctly and interactively according to the provisions of the Contract Documents.
3.11 DOCUMENTS AND SAMPLES AT THE SITE
Add the following: This requirement is of the essence of the contract. The Architect shall determine the value of these documents and this amount shall not be approved for payment to the Contractor until all of the listed documents are delivered to the Architect in good order, completely marked with field changes and otherwise complete in all aspects.
ARTICLE 4
ARCHITECT
4.2 ADMINISTRATION OF THE CONTRACT
4.2.1 In the first sentence, delete the phrase: “the date the Architect issues the final Certificate for Payment” and replace with the phrase “final payment is due, and with the Owner’s concurrence, from time to time during the one year period for correction of Work described in Section 12.2.”
4.2.2 In the first sentence, after the phrase: “become generally familiar with”; insert the following: “and to keep the Owner informed about”.
In the first sentence, after the phrase “portion of the Work completed”, insert the following: “to endeavor to guard the Owner against defects and deficiencies in the Work,”
4.2.4 In the first sentence, delete all after “The Owner and Contractor”, and add the following “may communicate directly with each other, when deemed necessary by the Owner, and the Owner will notify the Architect of any decision.”
4.2.10 Add the following sentence to the end of Section 4.2.10: There shall be no restriction on the Owner having a Representative.
4.2.11 Add the following sentence to the end of Section 4.2.11:
If no agreement is made concerning the time within which interpretation required of the Architect shall be furnished in compliance with this Section 4.2, then delay shall not be recognized on account of failure by the Architect to furnish such interpretation until 15 days after written request is made for them.
4.2.14 Insert the following sentence between the second and third sentences of Section 4.2.14:
If no agreement is made concerning the time within which interpretation required of the Architect shall be furnished in compliance with this Section 4.2, then delay shall not be recognized on account of failure by the Architect to furnish such interpretation until 15 days after written request is made for them.
July 2021 SC 5
ARTICLE 5
SUBCONTRACTORS
5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE
WORK
Delete Section 5.2.1, and substitute the following:
5.2.1 Unless otherwise required by the Contract Documents, the Contractor shall furnish at the Pre-Construction Conference, to the Owner and the Architect, in writing, the names of the persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for each of the principal portions of the Work.
No Contractor payments shall be made until this information is received.
Delete Section 5.2.2, and substitute the following:
5.2.2 The Contractor shall be solely responsible for selection and performance of all subcontractors. The Contractor shall not be entitled to claims for additional time and/or an increase in the contract sum due to a problem with performance or nonperformance of a subcontractor.
Delete Sections 5.2.3 and 5.2.4 and substitute the following:
5.2.3 The Contractor shall notify the Architect and the Owner when a subcontractor is to be changed and substituted with another subcontractor.
5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS
Delete Sections 5.4, 5.4.1, 5.4.2 and 5.4.3
ARTICLE 7
CHANGES IN THE WORK
7.1 GENERAL
Add the following Sections:
7.1.4 As part of the pre-construction conference submittals, the Contractor shall submit the following prior to the Contractor’s initial request for payment:
7.1.4.1 Fixed job site overhead cost itemized with documentation to support daily rates.
7.1.4.2 Bond Premium Rate with supporting information from the General Contractor’s carrier.
July 2021 SC 6
7.1.4.3 Labor Burden by trade for both Subcontractors and General Contractor. The Labor Burden shall be supported by the Worker’s Compensation and Employer’s Liability Insurance Policy Information Page. Provide for all trades.
7.1.4.4 Internal Rate Charges for all significant company owned equipment.
7.1.5 If the General Contractor fails to submit the aforementioned documentation as part of the pre-construction submittals, then pay applications shall not be processed until such time as the Owner receives this information.
7.2 CHANGE ORDERS
Delete Section 7.2.1, and substitute the following Sections:
7.2.1 A Change Order is a written instrument prepared by the Architect and signed by the Owner, the Architect, and the Contractor issued after execution of the Contract, authorizing a change in the Work and/or an adjustment in the Contract Sum and/or the Contract Time. The Contract Sum and the Contract Time may be changed only by Change Order. A Change Order signed by the Contractor indicates his agreement therewith, including the adjustment in the Contract Sum or the Contract Time. Any reservation of rights, stipulation, or other modification made on the change order by the contractor shall have no effect.
7.2.2 “Cost of the Work” for the purpose of Change Orders shall be the eligible costs required to be incurred in performance of the Work and paid by the Contractor and Subcontractors which eligible costs shall be limited to:
7.2.2.1 Actual wages paid directly to labor personnel, with a labor burden markup exclusively limited to applicable payroll taxes, worker’s compensation insurance, unemployment compensation, and social security taxes for those labor personnel performing the Work. Wages shall be the basic hourly labor rate paid an employee exclusive of fringe benefits or other employee costs. The labor burden percentage for the “Cost of the Work” is limited to categories listed herein.
Employer-provided health insurance, fringe benefits, employee training (whether a requirement of employment or not), vacation pay, etc., are examples of ineligible labor burden costs which shall not be included, as these costs are already compensated by the Overhead and Profit markup.
Supervision shall not be included as a line item in the “Cost of the Work”, except when the change results in a documented delay in the critical path, as described in Section 7.2.7.
7.2.2.2 Cost of all materials and supplies necessary and required to perform the Work, identifying each item and its individual cost, including taxes. Incidental consumables are not eligible costs and shall not be included.
7.2.2.3 Cost of each necessary piece of machinery and equipment required to perform the Work, identifying each item and its individual cost, including taxes.
Incidental small tools of a specific trade (i.e., shovels, saws, hammers, air compressors, etc.,) and general use vehicles, such as pickup trucks even for
July 2021 SC 7 moving items around the site, fuel for these general use vehicles, travel, lodging, and/or meals are not eligible and shall not be included.
7.2.2.4 Eligible Insurance costs shall be limited to documented increases in “Builder’s
Risk” insurance premium / costs only. Commercial General Liability, Automobile Liability, and all other required insurances, where referenced in the Contract shall be considered part of normal overhead. These costs are already compensated by the Overhead and Profit markup.
7.2.2.5 Cost for the General Contractor Performance and Payment Bond premium, where the documented cost of the premiums have been increased due to the Change Order.
7.2.3 Overhead and Profit - The Contractor and Subcontractor shall be due home office fixed overhead and profits on the Cost of the Work, but shall not exceed a total of 16% of the direct cost of any portion of Work.
The credit to the Owner resulting from a change in the Work shall be the sum of those items above, including overhead and profit. Where a change results in both credits to the Owner and extras to the Contractor for related items, overhead and profit shall be computed for credits to the Owner and extras to the Contractor. The Owner shall receive full credit for the computed overhead and profit on credit change order items.
7.2.4 The cost to the Owner resulting from a change in the Work shall be the sum of: Cost of the Work (as defined at Section 7.2.2) and Overhead and Profit (as defined at Section 7.2.3), and shall be computed as follows:
7.2.4.1 When all of the Work is General Contractor Work; 8% markup on the Cost of the
Work.
7.2.4.2 When the Work is all Subcontract Work; 8% markup on the Cost of the Work for Subcontractor’s Overhead and Profit, plus 8% markup on the Cost of the Work, not including the Subcontractor’s Overhead and Profit markup, for General Contractor’s Overhead and Profit.
7.2.4.3 When the Work is a combination of General Contractor Work and Subcontract
Work; that portion of the direct cost that is General Contract Work shall be computed per Section 7.2.4.1 and that portion of the direct cost that is Subcontract Work shall be computed per Section 7.2.4.2.
Premiums for the General Contractor’s bond may be included, but after the markup is added to the Cost of the Work.
Premiums for the Subcontractor’s Bond shall not be included.
7.2.4.4 Subcontract cost shall consist of the items in Section 7.2.2 above plus Overhead and Profit as defined in Section 7.2.3.
7.2.5 Before a Change Order is prepared, the Contractor shall prepare and deliver to the Architect the following information concerning the Cost of the Work, not subject to waiver, within a reasonable time after being notified to prepare said Change Order:
July 2021 SC 8
A detailed, itemized list of labor, material and equipment costs for the General Contractor’s Work including quantities and unit costs for each item of labor, material and equipment.
An itemized list of labor, material and equipment costs for each Subcontractor’s and/or Sub-Subcontractor’s Work including quantities and unit costs for each item of labor, material and equipment.
7.2.6 After a Change Order has been approved, no future requests for extensions of time or additional cost shall be considered for that Change Order.
7.2.7 Extended fixed job-site costs are indirect costs that are necessary to support the work in the field. Examples of fixed job-site costs are field office rental, salaries of field office staff, field office utilities, and telephone.
Extended fixed job-site costs or equitable adjustment may be included in a Change Order due to a delay in the critical path, with the exception of weather related delays. In the event of a delay in the critical path, the Contractor shall submit all changes or adjustments to the Contract Time within twenty-one (21) days of the event giving rise to the delay. The Contractor shall submit documentation and justification for the adjustment by performing a critical path analysis of its most recent schedule in use prior to the change, which shows an extension in critical path activities.
The Contractor shall notify the Architect in writing that the Contractor is making a claim for extended fixed job-site overhead as required by Section 15.1.2. The Contractor shall provide proof that the Contractor is unable to mitigate financial damages through Alternate Work within this Contract or replacement work. “Replacement Work” is that work which the Contractor is obligated to perform under any construction contract separate from this Contract. Reasonable proof shall be required by the Architect that the delays affected the Completion Date.
7.2.8 “Cost of the Work” whether General Contractor cost or Subcontractor cost shall not apply to the following:
7.2.8.1 Salaries or other compensation of the Contractor’s personnel at the Contractor’s principal office and branch offices.
7.2.8.2 Any part of the Contractor’s capital expenses, including interest on the
Contractor’s capital employed for the Work.
7.2.8.3 Overhead and general expenses of any kind or the cost of any item not specifically and expressly included above in Cost of the Work.
7.2.8.4 Cost of supervision refer to section 7.2.2.1, with exception as provided in Section
7.2.7.
7.2.9 When applicable as provided by the Contract, the cost to Owner for Change Orders shall be determined by quantities and unit prices. The quantity of any item shall be as
July 2021 SC 9 submitted by the Contractor and approved by the Architect. Unit prices shall cover cost of Material, Labor, Equipment, Overhead and Profit.
7.3 CONSTRUCTION CHANGE DIRECTIVES
7.3.3 In the first sentence after “following methods” insert: “, but not to exceed a specified amount”.
7.3.4 From .1 of the list, delete all after “Costs of labor, including” and substitute the following “social security, old age and employment insurance, applicable payroll taxes, and workers’ compensation insurance;”
Delete the following from .4 of the list: “permit fees,”
Delete Section 7.3.9 and substitute the following:
7.3.9 Pending final determination of the total costs of a Construction Change Directive to the
Owner, amounts not in dispute for such changes in the Work shall be included in Applications for Payment accompanied by a Change Order indicating the parties’ agreement with part or all of such costs.
ARTICLE 8
TIME
8.1 DEFINITIONS
Add the following:
8.1.5 The Contract Time shall not be changed by the submission of a schedule that shows an early completion date unless specifically authorized by change order.
8.2 PROGRESS AND COMPLETION
Add to Section 8.2.1 the following:
Completion of the Work must be within the Time for Completion stated in the Agreement, subject to such extensions as may be granted under Section 8.3. The Contractor agrees to commence Work not later than fourteen (14) days after the transmittal date of Written Notice to Proceed from the Owner and to substantially complete the project within the time stated in the Contract. The Owner will suffer financial loss if the project is not substantially complete in the time set forth in the Contract Documents. The Contractor and the Contractor’s Surety shall be liable for and shall pay to the Owner the sum stated in the Contract Documents as fixed, agreed and liquidated damages for each consecutive calendar day (Saturdays, Sundays and holidays included) of delay until the Work is substantially complete. The Owner shall be entitled to the sum stated in the Contract Documents. Such Liquidated Damages shall be withheld by the Owner from the amounts due the Contractor for progress payments.
Delete Section 8.2.2.
July 2021 SC 10
8.3 DELAYS AND EXTENSIONS OF TIME
8.3.1 In the first sentence after the words “Owner pending” delete the words “mediation and binding dispute resolution” and add the word “litigation”, and delete the last word “determine” and add the following: “recommend, subject to Owner’s approval of Change Order. If the claim is not made within the limits of Article 15, all rights for future claims for that month are waived.”
ARTICLE 9
PAYMENTS AND COMPLETION
9.1 CONTRACT SUM
Delete Section 9.1.2.
Delete Section 9.2 and substitute the following:
9.2 SCHEDULE OF VALUES
At the Pre-Construction Conference, the Contractor shall submit to the Owner and the Architect a Schedule of Values prepared as follows:
9.2.1 The attached Schedule of Values Format shall be used. If applicable, the cost of Work for each section listed under each division, shall be given. The cost for each section shall include Labor, Materials, Overhead and Profit.
9.2.2 The Total of all items shall equal the Total Contract Sum. This schedule, when approved by the Architect, shall be used as a basis for the Contractor’s Applications for Payment and it may be used for determining the cost of the Work in deductive change orders, when a specific item of Work listed on the Schedule of Values is to be removed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .