50-M0087-24-EM111_Emergency Determination Digester Trans Pumps.pdf.PDF
PDF 2 MB Posted
- Solicitation number
- 50-U5700-24-CP349
- Issued by
- Sierra County, New Mexico
About this file
This document is an emergency determination form from the City of Santa Fe Public Utilities Department. The document outlines the emergency procurement of two Boerger CL390 rotary lobe pumps with 10-HP motors to replace non-functioning digester transfer pumps. The scope of work includes shipping and installation of the pumps, with a total contract amount of $95,394 and a one-year term. This emergency procurement is justified due to the critical failure of the existing pumps, which is hindering the City's ability to remove and dewater sludge from the digesters. To minimize the duration of the emergency, the City will complete the procurement process as quickly as possible, and the pumps will use a more reliable direct drive system to help prevent similar emergencies in the future.
The document also includes an estimate from the vendor, Falcon Environmental, detailing the pump specifications and performance curve. The emergency procurement is approved by the City Chief Procurement Officer, Public Utility Department Director, City Attorney, City Manager, and Finance Director.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 50-U5700-24-CP349_FVSSW DOL FFE New 003413-SOLESOURCE-812201520839 8.21.2024.pdf.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CoSF Version 2 04.25.2023
City of Santa Fe Emergency Determination Form
The emergency procurement method may only be used as described in NMSA 1978, § 13-1-127 and in the City’s Procurement Manual XII.
The Department that makes an emergency procurement to plan or prepare for the response to a serious threat to public health, welfare, safety or property caused by a flood, fire, epidemic, riot, act of terrorism, equipment failure or similar event shall account for the money spent in making the procurement and report on that accounting to the City’s Finance Department Director within ninety days after the end of the contract or fiscal year in which the procurement was made, whichever comes first.
I. Department: Public Utilities, City of Santa Fe
Department Director: John Dupuis
Department Contact: P. Fred Heerbrandt, P.E.
Department Telephone Number: 505-955-4623
City of SF Chief Procurement Officer: Travis Dutton-Leyda, CPO
Telephone Number: (505) 629-8351
II. Name of Contractor: Falcon Environmental
Address of Contractor: P. O. Box 710, Frederick CO 80530
Amount of prospective contract: $95,394.00
Term of prospective contract: One Year
Location of Services:
III. Please thoroughly list the services (scope of work), construction or items of tangible personal property of the contract:
Replacement of two Digester Transfer Pumps: Boerger CL390 Rotary Lobe Pumps with Horizontal direct drive gear reducer and 10-HP motor mounted on a pump skid. The scope of work includes shipping and installation of the two pumps.
IV. Provide an explanation for the justification of the procurement including a description of the emergency condition(s) requiring use of emergency procurement and the practicable competition utilized in compliance with NMSA 1978, § 13-1-127.
The anaerobic digester has two transfer pumps. Currently both of these pumps are not functional. The loss of the transfer pumps hiders our ability to remove and dewater sludge from the digesters. With the existing lead time of 10 to 12 weeks from order to delivery, we need to expedite the order of these pumps to maintain digester and dewatering operations. Our other alternative procurement would be a sole source, since Falcon Environmental is an exclusive retailer for these pumps, but this would add at least 30 days to the procurement while being awarded to the same vendor.
V. Please describe what measures are being taken to minimize the duration and effect of this particular emergency procurement (for example: is the emergency only in place until a competitive process can be completed, etc.).
The emergency will only be in place until the pumps are procured.
VI. Describe what measures the Department will take in the future to prevent/mitigate use of emergency procurement under similar circumstances.
The Wastewater Division’s staff performs preventative maintenance on their rotating equipment but sometimes sudden catastrophic failures requiring replacement occur unexpectedly. When a redundant unit is already experiencing issues, this can result in an emergency replacement scenario to maintain operations.
The pumps being purchased will use a direct drive motor system, replacing the existing belt drive system. The direct drive system will be more reliable and require less maintenance.
Certified by:
City Chief Procurement Officer, Travis Dutton-Leyda Date
City Approval by:
Public Utility Department Director, John Dupuis Date
City Attorney, Erin McSherry Date
City Manager, John Blair Date
Finance Director, Emily Oster Date
Note: All emergencies must be posted to the SPD website:
https://www.generalservices.state.nm.us/statepurchasing/submit-emergency.aspx and the City of Santa Fe’s website:
https://santafenm.gov/finance-2/purchasing-1/solicitations
John Dupuis (Aug 19, 2024 12:28 MDT) Aug 19, 2024
Aug 19, 2024
John Blair (Aug 20, 2024 08:57 CDT) John Blair Aug 20, 2024
ALEXIS LOTERO (Aug 23, 2024 17:01 MDT) Aug 23, 2024
Aug 23, 2024
LOVATO, JOANN D.
Mayor Webber to sign for Emergency Procurements approved by the Governing Body.
https://www.generalservices.state.nm.us/statepurchasing/submit-emergency.aspx https://santafenm.gov/finance-2/purchasing-1/solicitations https://na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAgfJkaLegeKIeT9wec41Hm6NxgWLX5k4G https://adobefreeuserschannel.na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAgfJkaLegeKIeT9wec41Hm6NxgWLX5k4G https://na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAgfJkaLegeKIeT9wec41Hm6NxgWLX5k4G https://na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAgfJkaLegeKIeT9wec41Hm6NxgWLX5k4G https://na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAgfJkaLegeKIeT9wec41Hm6NxgWLX5k4G
ESTIMATE
Falcon Environmental Corp.
PO Box 710 Frederick, CO 80530 heidi@fecal.us 303-833-9998 www.fecal.us
Bill to
CITY OF SANTA FE
PURCHASING OFFICE
P.O. BOX 909
(include freight on all quotes)
SANTA FE, NM 87504-0909
Ship to
CITY OF SANTA FE
CITY OF SANTA FE WWTP
73 PASEO REAL
SANTA FE, NM 87507
(include freight on all quotes) truck deliveries require lift gate
Shipping info
Ship via: Best Way
Estimate details
Estimate no.: 2518 Estimate date: 07/24/2024 Expiration date: 09/24/2024
Sales Rep: AJP
# Product or service Description Qty Rate Amount
1. Pump Replacement of Digested Sludge Transfer Pumps
(STP-02 & STP-01)
Boerger CL390 Rotary Lobe Pump with in-line 10HP motor. Flanges from existing pump will be reused to allow change out with no piping changes.
*This pump is supplied with the Optimum Dual-rotors which are more wear resistant to grit and abrasive sludge. This rotor also has a higher fluid displacement which will allow the pump to operate at slower speed. The current pump runs at 318 RPM and the proposed pump will run at 283 RPM. This reduction in speed will result in longer life on the pump. This pump is also equipped with a in-line motor instead of the current belt & sheave setup. This setup is much more robust than a rubber belt system that requires constant monitoring for correct tension.
The in-line motor arrangment also provides balanced radial forces into the pump which increases pump life, when compared to a belt system that has high radial forces due to the nature of the setup. Falcon Environmental will provide removal of the existing pumps and install the new pumps.
Lead Time: 12 weeks
2 $47,697.00 $95,394.00
Total $95,394.00 mailto:heidi@fecal.us tel:303-833-9998 http://www.fecal.us/
DO NOT SCALE DRAWING
DRAWN
DATENAME
SIZE
A
DWG. NO.
SHEET 1 OF 1
THIRD-ANGLE PROJECTION
REVCHECKED
BOERGER, LLCPROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
Boerger, LLC. ANY REPRODUCTION IN
PART OR AS A WHOLE WITHOUT THE
WRITTEN PERMISSION OF Boerger, LLC
IS PROHIBITED.
ALL DIMENSIONS IN INCHES
UNLESS OTHERWISE NOTED
TOLERANCES ± 1/2"
2860 Water Tower Place Chanhassen, MN 55317
TEL.: 612-435-7300
FAX.: 612-435-7301
SD-038-281
07/23/24
Model: CL 390 Gear: Nord - In-Line SK42-210TC Power: 10 HP mlindquist
20 7/8"
23 1/4" 44 11/16"
48 1/4"
11 5/8"
64 5/8"
23 3/4"
NOTE:
1. TOTAL WEIGHT = 973 LBS
12 11/16"
6 1/8"
CL390 Rotor Type I Performance Curve
0.0
0 PSI
30 PSI
60 PSI
90 PSI
8.6
0.0
120 PSI
0 50 100 150 200 250 300 350 400 450 500 550 600
P hp
Pump speed [rpm]
0 PSI
30 PSI
60 PSI
90 PSI
250.0
0.00.0
OP1: Municipal Waste Water, 1 cp
Santa Fe
Falcon Environmental
120 PSI
0 50 100 150 200 250 300 350 400 450 500 550 600
C ap ac ity
Q
U
S
IG
/m in
Pump speed [rpm]
Emergency Determination Digester Trans Pumps Final Audit Report 2024-08-24
Created: 2024-08-16
By: Paul Heerbrandt (pfheerbrandt@santafenm.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAgfJkaLegeKIeT9wec41Hm6NxgWLX5k4G
"Emergency Determination Digester Trans Pumps" History Document created by Paul Heerbrandt (pfheerbrandt@santafenm.gov) 2024-08-16 - 7:50:48 PM GMT- IP address: 63.232.20.2
Document emailed to John Dupuis (jedupuis@santafenm.gov) for signature
2024-08-16 - 8:17:26 PM GMT
Document e-signed by John Dupuis (jedupuis@santafenm.gov) Signature Date: 2024-08-19 - 6:28:54 PM GMT - Time Source: server- IP address: 63.232.20.2
Document emailed to Erin McSherry (ekmcsherry@santafenm.gov) for signature
2024-08-19 - 6:28:55 PM GMT
Email viewed by Erin McSherry (ekmcsherry@santafenm.gov) 2024-08-19 - 7:01:52 PM GMT- IP address: 104.47.65.254
Document e-signed by Erin McSherry (ekmcsherry@santafenm.gov) Signature Date: 2024-08-19 - 7:10:59 PM GMT - Time Source: server- IP address: 73.98.90.118
Document emailed to John Blair (jwblair@ci.santa-fe.nm.us) for signature
2024-08-19 - 7:11:01 PM GMT
Email viewed by John Blair (jwblair@ci.santa-fe.nm.us) 2024-08-20 - 1:56:45 PM GMT- IP address: 166.137.115.17
Document e-signed by John Blair (jwblair@ci.santa-fe.nm.us) Signature Date: 2024-08-20 - 1:57:16 PM GMT - Time Source: server- IP address: 166.137.115.17
Document emailed to EMILY OSTER (ekoster@santafenm.gov) for signature
2024-08-20 - 1:57:18 PM GMT
Email viewed by EMILY OSTER (ekoster@santafenm.gov) 2024-08-21 - 2:08:14 AM GMT- IP address: 178.27.179.6
Document signing delegated to ALEXIS LOTERO (aclotero@santafenm.gov) by EMILY OSTER (ekoster@santafenm.gov) 2024-08-21 - 2:09:58 AM GMT- IP address: 178.27.179.6
Document emailed to ALEXIS LOTERO (aclotero@santafenm.gov) for signature
2024-08-21 - 2:09:59 AM GMT
Document e-signed by ALEXIS LOTERO (aclotero@santafenm.gov) Signature Date: 2024-08-23 - 11:01:35 PM GMT - Time Source: server- IP address: 63.232.20.2
Document emailed to Travis Dutton-Leyda (tkduttonleyda@santafenm.gov) for signature
2024-08-23 - 11:01:36 PM GMT
Email viewed by Travis Dutton-Leyda (tkduttonleyda@santafenm.gov) 2024-08-23 - 11:10:09 PM GMT- IP address: 63.232.20.2
Document e-signed by Travis Dutton-Leyda (tkduttonleyda@santafenm.gov) Signature Date: 2024-08-24 - 5:01:08 AM GMT - Time Source: server- IP address: 73.242.166.26
Agreement completed.
2024-08-24 - 5:01:08 AM GMT
| I. Department: Public Utilities, City of Santa Fe |
| Department Director: John Dupuis |
| Department Contact: P. Fred Heerbrandt, P.E. |
| 2024-08-23T22:02:46-0700 | |
| Agreement certified by Adobe Acrobat Sign |
File details come from the government source that posted it. Updated .