50 FSS Mobile Stage Requirements Sheet.docx

DOCX document 25 KB Posted

Attached to
Mobile Stage - Schriever Space Force Base
Solicitation number
FA2550-MobileStage
Issued by

About this file

The document is a Mobile Stage Requirements Sheet for the 50th Space Force Squadron (50 FSS) at Schriever Space Force Base. The specifications detail a mobile stage trailer with precise technical requirements, including a 20' x 16' floor size with expansion capabilities, wind resistance up to 75 mph, and a total trailer weight under 10,000 lbs. Key features include hydraulic expansion system, hard-sided outer material, non-slip flooring, guard rails, a staircase and loading ramp entrance, detachable wind walls, front skirting, and banner hanging capabilities.

Additional requirements encompass trailer specifications such as a ball hitch, electric brakes on all four wheels, an emergency breakaway system, and an access door for stored equipment. The vendor must provide training materials or in-person training for stage operation and maintenance. Delivery is specified to 20 Falcon Pkwy, Schriever SFB, CO 80912. This requirement is part of a pre-solicitation Request for Information (RFI) issued by the Department of the Air Force Space Command, seeking vendors capable of providing a mobile stage that meets these detailed technical specifications.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

50 FSS Mobile Stage Requirements Sheet:

Floor Size: 20’ x 16’ with ability for expansion (extension platforms) Wind Resistance: 75mph with walls up Total Trailer Weight: less than 10,000lbs Outer material when closed: Hard sides Stage Expansion: Hydraulic system with stabilizers, powered by a gas engine Storage: Ability to store equipment inside of the stage when it is closed.

Stage:

Flooring: non-slip, Guard rails: Yes, surrounding the floor when opened Entrance to stage: staircase and loading ramp Walls: Yes, however detachable (windwalls) is preferred - two side walls and one back wall Skirting: Yes, minimum 20’ to cover the front of the stage Banners: Ability to hang a rooftop banner and two lateral banners Lighting: Ability to hang front of house lights

Trailer:

Hitch: ball hitch Brakes: Electric brakes on all 4 wheels Access door (ability to access materials stored inside the folded-up stage without opening the whole stage.

Emergency breakaway system

Additional Services:

Training: in-person or access to training materials that clearly demonstrate how to operate and maintain the trailer Delivery: Delivery to 20 Falcon Pkwy, Schriever SFB, CO 80912

File details come from the government source that posted it. Updated .