5-Trench Safety Act Requirement.docx

DOCX document 41 KB Posted

Attached to
Wiles Road Westbound Departure Lane Transition Improvements
Solicitation number
PNC2131631C1
Issued by
Florida

About this file

This is a Trench Safety Act Requirement form for the Wiles Road Westbound Departure Lane Transition Improvements project in Florida, administered by a county highway construction and engineering division. The fixed-price contract requires vendors to furnish all labor, materials, equipment, tools, and services necessary for roadway improvements on Wiles Road from University Drive to Coral Hills Drive, including miscellaneous signing and pavement marking enhancements extending to Riverside Drive. Vendors must submit their solicitation responses electronically through BPRO and obtain a submission receipt by the specified closing date and time. Vendors are required to ask questions and seek clarification through BPRO by the designated questions due date, and the county will respond through the BPRO messages section. All submittal documents, including both required and optional items, should be provided at the time of submission to enable timely and comprehensive review.

The form requires vendors to demonstrate compliance with the Florida Trench Safety Act (Sections 553.60-553.64, Florida Statutes) and OSHA excavation safety standards (29 C.F.R. Section 1926.650) for any project trenches exceeding 5 feet in depth. Vendors must submit a completed Trench Safety Act form with their solicitation response or within three business days of the county's request, with non-compliance potentially resulting in a nonresponsive determination. The form requires vendors to identify both the anticipated method and cost of compliance with applicable trench safety standards, including special shoring requirements if applicable, with costs structured either by linear feet or square feet depending on whether the contract is open-end or fixed. Additionally, vendors must hold an FDOT Certificate of Qualification, meet bonding requirements, and address County Business Enterprise goal participation as outlined in the solicitation documents.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRENCH SAFETY ACT REQUIREMENT

The completed form should be returned with the Vendor’s submittal. If not provided with the submittal, Vendor must submit the form within three business days after County’s request. Vendor may be deemed nonresponsive for failure to fully comply with the stated timeframes.

Florida Trench Safety Act, Sections 553.60 through 553.64, Florida Statutes, incorporates the Occupational Safety & Health Administration (OSHA) excavation safety standards, 29 C.F.R. Section 1926.650, as Florida's own standards. The Trench Safety Act will apply to any individual project that has trenches in excess of 5 feet deep.

The Vendor, by virtue of the solicitation submission, affirms that the Vendor is aware of this Act, and will comply with all applicable trench safety standards, including any special shoring requirements, if applicable. Such assurance shall be legally binding on all persons employed by the Vendor and subcontractors.

The Vendor is also obligated to identify the anticipated method and cost of compliance with the applicable trench safety standards. The Vendor further identified the costs and methods summarized below: (fill in either the Open-end or the Fixed Contract section)

Open-end Contract:

Description
Unit of Measure
Unit Price
Method
Click or tap here to enter text.Linear Feet
Click or tap here to enter text.
Click or tap here to enter text.Linear Feet
Click or tap here to enter text.
Click or tap here to enter text.Linear Feet
Click or tap here to enter text.
Click or tap here to enter text.Linear Feet
Click or tap here to enter text.
Special Shoring, if applicable
Square Feet
Click or tap here to enter text.

Fixed Contract:

Description
Unit of Measure
Quantity
Unit Price
Method

Click or tap here to enter text. Linear Feet

Click or tap here to enter text. Linear Feet

Click or tap here to enter text. Linear Feet

Click or tap here to enter text. Linear Feet

Special Shoring, if applicable
Square Feet

Vendor Name: Click or tap here to enter text.

Form Date 9/9/24