5-Southside Community Center RFP Responses.pdf

PDF 157 KB Posted

Attached to
Request for Proposals Consulting Design and Engineering Services For Southside Community Center
Solicitation number
US.258547
Issued by
Northampton County, Bethel CDP, Pennsylvania

About this file

This document is a City of Bethlehem response to questions regarding an RFP for Consulting Design and Engineering Services for the Southside Community Center located in Northampton County, Pennsylvania. The City seeks a qualified consulting firm to design and engineer a community center on the Mechanic Street Parking Lot, intended to serve as a hub for educational, recreational, cultural, and social services. The approximately 18,500-square-foot facility will feature multipurpose rooms, offices, and recreational spaces. The project will be delivered using Design-Bid-Build methodology with multiple prime contractors (General Contractor and MEP). The design phase will be completed within one year of contract execution, with deliverables at Schematic Design (50%), Design Development, and Construction Documents (100%) phases. The City will allocate three weeks to review each design phase. Construction is anticipated to take 18 months contingent upon successful fundraising. Proposals must include all subconsultant fees in a single summary submission, with detailed pricing broken down by SD, DD, CD, and CA phases. The selected consultant is responsible for contracting with civil engineers, geotechnical engineers, and other subconsultants and must provide standard construction administration services including submittal review, RFI responses, site inspections, and progress meetings.

The design team must include a bilingual member fluent in Spanish for community engagement meetings and presentations. Scope includes IT, Security, A/V design, and Furniture, Fixtures & Equipment (FF&E) services. The City will waive municipal permit fees but the consultant is responsible for obtaining state permits and associated costs. The project has $1 million in committed City funding, with additional funding through an active capital campaign led by the United Way of the Greater Lehigh Valley and pending grant applications. Cost estimates from the January 2024 Feasibility Study represent the most recent project budget guidance. The City does not require LEED certification but seeks sustainable elements where financially feasible. A Phase II Environmental Site Assessment identified contaminated soils including used motor oil, benzo(b)fluoranthene, and PCBs, with a comprehensive report to be provided to the selected consultant. The Bethlehem YMCA is identified as the future operator partner, with final programming decisions to be made during the design phase. No preproposal meeting will be held; the architectural firm that produced the feasibility study is permitted to submit a response.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Bethlehem

Response to Questions – November 2, 2026

RFP: Consulting Design & Engineering Services for Southside Community Center

1. What is the project delivery method?

a. Design-Bid-Build

b. Construction Manager at Risk

c. Construction Manager, GMP

2. Will the project be bid as one lump sum, or will there be multiple primes? There will be multiple primes, i.e. GC and MEP.

3. Will this be a LEED Project?

The City would like to focus on sustainable elements when financially feasible, but it is unlikely the City would pursue full LEED certification given the cost.

4. Will we be preparing Div 00 specifications? Will we be preparing Div 01 specifications?

The winning respondent will be responsible for all technical specifications in the project manual and work with the City to produce biddable construction documents. Winning respondent will assist in Div 00 with City taking the lead.

6. Will the outdoor Garden be a community or a respite space? an elevator is indicated, please confirm. All designs in the feasibility study should be considered purely conceptual. Yes, an elevator is required.

7. Is the Kitchen a warming kitchen or full blown, including a Kitchen Consultant?

The feasibility study identified demand for a full kitchen, but final inclusion will determine on cost. It may end up being an alternate bid. It is up to the responding project team to determine if their team requires the expertise of a kitchen consultant.

8. What class is the green roof, intensive, extensive?

All designs in the feasibility study should be considered purely conceptual. A green roof is not required for this project.

9. Will this be considered an emergency shelter?

That has not been determined.

10. I see there are 2 or three deliverables, including a 50%, final and review. Please verify the deliverables. Please verify the timeline for the project.

The deliverables are as stated in the RFP. The project timeline is contingent on execution of the legal contract

11. What is the typical time frame that we should expect for the City to review documents during each phase? City will allocate three weeks to review each phase.

12. Will there be a preproposal meeting for this opportunity? If so, what date, time and location will this hold. Typically, such preproposal meetings are an opportunity for networking and team building between subconsultants and primes. 13. If there will not be a preproposal meeting, are subconsultants allowed to submit their individual discipline fee proposals and leave it up to the procurement officer or team to select the winning team from separate subconsultants and primes?

There will not be a preproposal meeting for this project. The lead/prime consultant shall submit a proposal which includes all other subconsultants fees. The City expects one summary fee proposal per submission.

14. Can the final full feasibility report be made available? The full report is available for download in PennBid as well as at https://webuild.bethlehem-pa.gov/en/projects/south-side-community-center-feasibility-study.

15. Please provide dimensions and area of the site that is to part of the landscape architectural scope of work. The renderings are purely conceptual and no dimensions exist.

16. Please confirm if civil engineering services and geotechnical services can be contracted directly to the City and not the architect of record. No, the selected consultant shall be responsible for contracting with the appropriate subconsultants to ensure success of the project.

17. Is there an anticipated construction budget or project budget? The cost estimates in the feasibility study are the most recent cost estimates for the project.

18. Is the concept plan approved, or should our fee include further programming and design alternatives? What is the target building area? The concept plan was a conceptual site test fit meant to provide preliminary cost estimates and layouts so the City could decide whether to pursue adaptive reuse or new construction for a future community center. The program and design are not finalized. The target building area is approximately 18,500-square-feet.

19. What is the intended procurement process for bidding and awarding the construction contract?

The project will be competitively bid and awarded to the lowest responsive bidder.

20. Has the City developed a project schedule with critical milestones for the design and construction phases? No.

21. Is the architectural firm that produced the study permitted to submit a response to this RFP?

Yes.

22. The RFP calls for community engagement meetings, is this to suggest that the programming for the building will be revisited and so the design team should include a programming phase to review the building program produced for the study? Yes, the initial study evaluated feasibility and demand for a center and assisted in final site selection. It identified programmatic demand, but included no final programming decisions. After completing the feasibility study, the City selected the Bethlehem YMCA as its operator partner. Those programming decisions will be made during final design and engineering.

23. How many cost estimates are required and at what intervals in the design phase?

The City seeks cost estimates at the end of preliminary (50%) and final design (100%).

24. Since the study was developed, have there been any changes to the building program?

No.

25. Will native CAD/Revit files of the concept plan be made available? CAD/Revit files of the concept plans are not available.

26. Does a current civil survey of the site exist that includes topography, spot elevations and underground utilities? No.

27. Are there any sustainability certification goals for the project?

The City would like to focus on sustainable elements when financially feasible, but it is unlikely the City would pursue certification given the cost.

28. Should we assume the scope of services to include IT, Security, and A/V design? Yes.

29. Should we assume to include FF&E design services as part of the scope of work? Yes.

30. Our architectural design team is fluent in Spanish, should we assume community engagement meetings and presentations to be conducted in Spanish as well as English? Yes, community engagement meeting(s) and presentation(s) will accommodate a bilingual individual, both through written dialogue, and in-person translation during the public meeting. GoVocal is the City’s online platform for engagement materials and announcements.

31. Please confirm the services required for the construction administration (CA) term. The description included and recommended 40 hours minimum appear to only be about inspections.

Are standard services required for CA such as submittals, field reports, construction meetings, etc. expected for this phase? As stated in the RFP, engineering will provide the majority of the inspection. The selected consultant shall provide standard CA services, which will include reviewing submittals, responding to RFI's, periodic site inspections, construction progress meetings, etc.

32. Are FFE services to be included as part of the proposal? Yes.

33. Is it expected that the civil engineer will be under contract directly with the Owner or under the Architect? The lead/prime consultant shall submit a proposal which includes all other subconsultants fees.

34. Is the construction budget indicated in the feasibility report the current construction budget target? The cost estimates in the feasibility study are the most recent cost estimates for the project.

35. Please confirm that the typical phases and associated fees are being requested - SD, DD, CD, and CA. Yes, proposals should be broken down by these phases, tasks and associated costs.

36. Can you send a copy of the contract that will be used if awarded?

The contract has not been drafted.

37. Will the cost of permitting be required through the Owner or Architect? Engineering permit fees such as NPDES permit shall be paid by the City. The City will waive all City permit fees, but the selected contractor will be responsible for obtaining all necessary building permits and paying the associated state fees.

38. Section 3.0 references the Bethlehem YMCA as 'the future operator'. Could the City clarify the intended operational and governance model? Specifically, will the Bethlehem YMCA operate the entire facility under a master operating agreement, or will portions of the building and programmatic spaces be leased or operated independently by other community partners or

City departments? The City will enter into an operator agreement with the YMCA, which has not yet been drafted. We anticipate the YMCA will operate the entire facility, but we have discussed with the YMCA our interest in engaging other community partners and finding opportunities for partnership within the space. We expect those details to be determined later in the process as the project progresses.

39. Section 1.0 notes that the City has committed $2 million in dedicated funding toward the project and that a January 2024 Feasibility Study analyzed construction costs. To assist design teams in calibrating the scope, building systems, and deliverable cost estimates, could the City share the current estimated total project/development budget or target construction cost range for the facility? The cost estimates in the feasibility study are the most recent cost estimates for the project. The City and its partners are actively fundraising for the project.

40. Section 1.0 indicates that the project will rely on a mix of public and private funding sources.

Is there an active or planned capital campaign supporting this project, and is the completion of final design documents tied to specific private fundraising milestones or grant award schedules?

There is an active capital campaign underway, led by the United Way of the Greater

Lehigh Valley, as well as pending grant applications. Completing the final design is not tied to any fundraising milestones, as the City’s funds will cover the cost of the design phase.

41. Could the City clarify the review and approval hierarchy for design milestones? For example, Is there a formal steering committee or project advisory board to which the consultant team will report during project development meetings, or will design decisions and phase sign-offs be administered solely through City Engineering, the Mayor's office, and/or Bethlehem YMCA leadership? The selected consultant will work directly with a project team comprised of staff from the City Engineering Bureau and the Department of Community & Economic

Development. We anticipate City staff will engage the YMCA team throughout the design process.

42. We understand the design team must be able to provide written and graphic material in

Spanish. Is there a requirement for a design team member to be fluent in Spanish to present or otherwise interact with user groups at community meetings.

The City requires a bilingual member on the team for any in-person community interactions. This could be someone contracted strictly for translation. Alternatively, your proposal can speak to how any language needs could be addressed in a different manner.

43. Does the selection committee expect there to be a pause in the project schedule to allow fund-raising activities? The City intends to commence with the final design and engineering immediately after contract award; however, bidding and construction will be contingent on the success of fundraising.

44. Does the selection committee have an expectation for the length of the project construction?

18 months.

45. Does the selection committee have an expectation for the length of the design/documentation phase which is complete when the project is bid? City anticipates the design phase will be completed one year after issuing the notice to proceed.

46. Are there specific concerns about contaminated soils at this site? After a sinkhole opened on a corner of the property in 2025, a limited Phase II Environmental site assessment was conducted that indicated the presence of used motor oil, benzo(b)fluoranthene, PCBs and other metals. A comprehensive report of the assessment shall be provided to the selected consultant.

47. Pg 3: Deliverables. Item 8 notes Cost Estimates and Sequence of Construction. Please confirm Sequence of Construction is not applicable here. The sequence of construction shall be detailed in the construction documentation phase. The focus on item 8 shall be the opinion of probable cost.

48. Please clarify what is intended for Project Management services, noted under Construction

Documentation. What are the duties associated with this, in addition to those explicitly stated elsewhere in the RFP? The PM shall oversee the design and engineering activities and serve as the primary point of contact throughout the construction administration phase.

49. Is FFE included in scope of services? Yes.

50. To what degree do you anticipate IT/AV/Security scope of services? The scope of services should include IT, Security, and A/V design appropriate for a community center.

51. Are design fees included the $2 million? Yes, please note the actual available funding is $1 million and not $2 million. An addendum has been issued for this change.

52. Section 3.3 identifies a minimum of 40 hours for bidding, preconstruction meetings, progress meetings, and inspections. Is that allowance intended for the entire consultant team or each discipline? Just for the prime consultant.

53. Is the proposed location in the flood plain? No

54. Are there any YMCA national design guidelines or standards with which this project will need to comply? There will be YMCA standards related to risk management and safety protocols. The YMCA team will work with the selected firm to convey those requirements.

55. Do we need to include any design services related to low-voltage / technology systems (i.e., IT, phone, security/access control) beyond 120-volt power, pathways, cable, drops, and terminations? In other words, can we assume all low voltage system hardware (devices, servers, switches, racks, panels, etc.) are specified, furnished, and installed by the owner’s respective consultants/vendors but please advise if not correct. Yes.

56. Will the kitchen include full commercial cooking equipment or be limited to warming equipment for outsourced catering services? The feasibility study identified demand for a full kitchen, but final inclusion will be determined based upon cost. It may end up being an alternate bid. It is up to the responding project team to determine if their team requires the expertise of a kitchen consultant.

57. Does the city have any LEED or sustainable design requirements / energy reduction goals for the project? The City will focus on sustainable elements where financially feasible, but it is unlikely the City would pursue full LEED certification given the cost.

58. Should we include the design of a fully automated wet-type fire suppression system? Fire suppression should be designed to code.

59. There is a mechanical room included on the conceptual design drawings within the second-floor footprint. Is rooftop HVAC equipment prohibited? If so, additional indoor mechanical space will likely be required. The drawings are purely conceptual.

60. Emergency lighting can be done with battery powered fixtures. Will the city require any or all portions of the building to be on emergency power via a standby generator? To elaborate, in many cases the owner puts the kitchen cooler and freezer on an emergency generator to avoid loss of product during an extended power outage. In more limited instances, the entire building is put on emergency power (to be used as an emergency shelter for example). The entire building should have emergency power.

61. Do you want to see a firm profile and resumes for the sub-consultants? Yes.

62. Please clarify the "design and engineering" task and the "construction documentation" task.

During the documentation phase of the project, we would typically follow the documentation milestones of Schematic Design, Design Development and then Construction Documents. The

City follows similar milestones; Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction Administration (CA).

63. Should we include cost estimating as part of our scope? Yes, the City seeks cost estimates at the end of preliminary (50%) and final design (100%.)

64. For the proposed fee, it is requested to break out the fee on a task-by-task basis for each phase, can you please clarify what are the phases and tasks that we should be using? Provide a summary fee proposal itemized according to the following phases; Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction

Administration (CA)

65. Is there a desired start or end date of construction? Are any schedule milestones tied to funding? Construction start will be contingent on fundraising.

66. Will the architect be responsible for typical construction administration services, such as:

reviewing submittals responding to RFI's, making site observations, reviewing and signing the payment applications? As stated on the RFP, engineering will provide the majority of the inspection. Selected consultant shall provide standard CA services which will include reviewing submittals, responding to RFI's, periodic site inspections, construction progress meetings, etc.

67. Could the City provide an estimated total budget or fee range specifically allocated for the consulting design and engineering services phase? The City intends to pay for the final design from the city funds allocated to the project.

68. Should civil engineering be included in a proposal?

Yes, and the lead/prime consultant shall submit a proposal which includes all other subconsultants’ fees.

69. Please clarify desired phases for detailed pricing breakdown as outlined in section 4.4.

Schematic Design (SD), Design Development (DD), Construction Documents (CD) and

Construction Administration (CA)

70. Is the concept plan fixed, or can the program and layout change? Examples: teen space on the second floor, the unprogrammed void over the gym, future expansion, and whether the green roof stays. The concept plan is not fixed. Program and layout may change during the design process.

71. Are there sustainability or energy requirements? No requirements, but the City does seek to incorporate sustainable elements where financially feasible.

File details come from the government source that posted it. Updated .