5-MBE_Utilization_Form.docx
DOCX document 24 KB Posted
- Attached to
- VMS REALIGNMENT OAK STREET
- Solicitation number
- 2027-ITB-407
- Issued by
- New Haven County, Connecticut
About this file
This is an MBE Utilization Documentation form from the City of New Haven, Connecticut, required for the VMS Realignment Oak Street project. The form serves as a mandatory submission component that requires contractors to provide a complete listing of all subcontractors to be utilized on the project, including their names, addresses, types of work, dollar amounts, outreach methods used to secure their participation, and appropriate company classifications. The VMS Realignment Oak Street project involves correcting an existing misalignment of a Variable Message Sign (VMS) facing eastbound traffic entering the I-91/I-95 corridor from downtown New Haven. The scope of work consists of placing a new foundation west of the existing VMS, relocating the existing VMS and its cantilever steel support structure onto the new foundation, interrupting existing conduit, pulling back and salvaging wire, and tying both elements into the new foundation with termination at the sign.
Contractors must certify that they have read the City of New Haven's goals for minority and women-owned small business participation and have achieved the established goal of 25% participation. The form requires the contractor's name, address, telephone number, and signature of an authorized representative along with the date of submission. The completed form must be submitted as part of the contractor's proposal; failure to complete and submit the form will result in the submission being deemed non-responsive and rejected. Approval by the Small and Certified Business (S CD) division is required before contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of New Haven MBE Utilization Documentation – Sub-Contractor Listing Project Name and ID:
The Contractor herewith submits a complete list of all Subcontractors to be used on the project by name address, type of work, dollar amount, outreach method used to secure subcontractor and appropriate company classification. This form must be completed as part of your submission. Your submission will be deemed non-responsive if the form is not completed and your response will be rejected.
I am representing Certify that I have read the City of New Haven's goals Name Company for use of minority and women owned small businesses and I have achieved the Goal of 25% participation.
Signature Type Name & Title Date Approved by S
CD
- Signature Print Name and Title Date
| Name of Contractor |
| Address |
| Telephone |
| Contact |
| Type of Work |
| Dollar |
Amount Type of Outreach
| MBE |
| WBE |
Rev 9/25/2024[DOCUMENT TITLE] | [Document subtitle]
File details come from the government source that posted it. Updated .