5. Spatula_Cost and Information Bid Sheet PDF Form 7-30-24.pdf

PDF 364 KB Posted

Attached to
CSFS Spatula Stewardship Project USFS Good Neighbor Authority
Solicitation number
RFP-2025-052-AT
Issued by
Colorado

About this file

This is a Cost and Information Page for a timber harvesting contract issued by the Colorado State Forest Service (CSFS) for the Spatula project, which involves 16 units covering 482 acres. The contract must be completed by December 31, 2028, with CSFS considering bidders who can demonstrate the capacity, resources, equipment, and expertise to complete the project expeditiously. The bid document outlines mandatory work activities for cutting and removing included timber across 10 units totaling 388 acres, with specific focus on Ponderosa Pine sawtimber and non-saw timber products.

The bidding structure includes two primary tables: Table A for mandatory work activities with per-acre costs for each unit, and Table B for forest products with minimum bid prices of $0.25 per CCF (hundred cubic feet) for Ponderosa Pine sawtimber and non-saw timber. Additionally, the document provides optional work activities that contractors may elect to perform, subject to funding availability and Contract Administrator approval. These optional activities include cut and slash of non-saw timber, cut/skid/deck and slash operations, and temporary road decommissioning across various units. Bidders are required to complete the document with their company information, proposed project dates, and detailed cost proposals.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COST and INFORMATION PAGE Spatula

(16 Units, 482 Acres)

Bidder’s Information:

Business/Company Name: ___________________________________________________________________________________

Business Address: _____________________________________________________________________________________________

Phone Number: _______________________________________________________________________________________________

Email Address: ________________________________________________________________________________________________

Authorized Signer Name and Title:___________________________________________________________________________

Authorized Signature and Date: ______________________________________________________________________________

Proposed Project Period:

The contract must be completed by December 31, 2028; however, CSFS will take into consideration those who can complete the project as soon as possible and demonstrate the capacity, resources, equipment, and expertise necessary to ensure successful completion of this project.

When determining the dates, please allow 4-6 weeks to allow time to prepare and sign the contract and issue the Purchase Order. Please refer to the scope of work for any other special circumstances.

Start Date: ________________ End Date: ________________

Please continue to pages 2 and 3 to provide complete bid/cost information.

Mandatory Bid/Cost Information:

Table A: Mandatory Work Activities: Cut and Remove Included Timber

Unit Acres Cost/Acre Total Cost for Unit

1 84

2 70

3 33

4 47

107 41

108 27

109 3

110 8

111 23

112 52

Total for Table A: Mandatory Work for 10 Units – 388 Acres

Insert Total for Mandatory Work

Table B. Forest Products Bid Table Bid price must not be lower than the minimum price per CCF provided in red text below.

Spatula Forest Products

Species Product Estimated

Volume

(CCF)

Bid Price/CCF Bid Price per Species

Ponderosa Pine Sawtimber 1896

Minimum of $0.25/CCF

Ponderosa Pine Non-Saw 333

Minimum of $0.25/CCF

Total for Table B: Total Bid Price for Forest Products:

Insert Total Forest Products Bid

Total Bid for Mandatory Work*: _________________________________________________ *Total Bid = Total Bid for Mandatory Work (Table A) minus Total Bid Price for Forest Products (Table B)

Optional Work Activities The Contractor may, at their discretion, elect to perform optional work by entering associated costs into the table below. This optional work is subject to funding availability and the agreement and approval of the Contract Administrator.

1. Cut and Slash Non-Saw Timber

Unit Acres Cost/Acre Total Cost for Unit

107 41

108 27

109 3

110 8

111 23

112 52

Total: 6 Units 154

2. Cut, Skid, Deck and Slash

Unit Acres Cost/Acre Total Cost for Unit

101 4

102 11

103 5

104 6

105 31

106 25

Total: 6 Units 82

3. Garb Temp Roads Decommission Roads 1-12 (12 – 150ft sections)

Total Cost

Total Cost of all Optional Work Items: $__________________________________________________________________

BusinessCompany Name:
Business Address:
Phone Number:
Email Address:
Start Date:
End Date:
CostAcre84:
Total Cost for Unit84:
CostAcre70:
Total Cost for Unit70:
CostAcre33:
Total Cost for Unit33:
CostAcre47:
Total Cost for Unit47:
CostAcre41:
Total Cost for Unit41:
CostAcre27:
Total Cost for Unit27:
CostAcre3:
Total Cost for Unit3:
CostAcre8:
Total Cost for Unit8:
CostAcre23:
Total Cost for Unit23:
CostAcre52:
Total Cost for Unit52:
Minimum of 025CCF:
Bid Price per SpeciesMinimum of 025CCF:
Minimum of 025CCF_2:
Bid Price per SpeciesMinimum of 025CCF_2:
Total Bid Total Bid for Mandatory Work Table A minus Total Bid Price for Forest Products Table B:
CostAcre41_2:
Total Cost for Unit41_2:
CostAcre27_2:
Total Cost for Unit27_2:
CostAcre3_2:
Total Cost for Unit3_2:
CostAcre8_2:
Total Cost for Unit8_2:
CostAcre23_2:
Total Cost for Unit23_2:
CostAcre52_2:
Total Cost for Unit52_2:
Total Cost for Unit154:
CostAcre4:
Total Cost for Unit4:
CostAcre11:
Total Cost for Unit11:
CostAcre5:
Total Cost for Unit5:
CostAcre6:
Total Cost for Unit6:
CostAcre31:
Total Cost for Unit31:
CostAcre25:
Total Cost for Unit25:
Total Cost for Unit82:
Total CostRow1:
Total Cost of all Optional Work Items:
Total Bid Price for Forest Products:
Total Bid for Mandatory Work: