5. SEA DOG (WPB 87) DS FQ3 JND 21R0.pdf

PDF 1 MB Posted

Attached to
Dock-Side: USCGC SEA DOG FY21 DS1 WTCA
Solicitation number
70Z080-21-Q-PV118800
Issued by

View the file

Other files

File Type Posted
RFQ SHIP REPAIR COMBINED SYNOPSISSEADOG.pdf PDF
7. SEA DOG (WPB 87) DS FQ3 JND 21E00_BLANK.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC SEA DOG (WPB 87373)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2021

Developed By: CWO Jack Dos Santos

Rev-0, 16 October 2020)

USCGC SEA DOG (WPB-87) DOCKSIDE AVAILABILITY FY2021

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: U/W Body, Diver Clean and Inspect WORK ITEM 2: Watertight Closures, Assess WORK ITEM 3: Electrical Power Distribution System, Thermographic Inspection (450 VAC And

Below) WORK ITEM 4: Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and

Inspect WORK ITEM 5: Ducting, HVAC System, Clean WORK ITEM 6: Bilge Zinc(s), Remove WORK ITEM 7: Fire Alarm Control Panel, Replace WORK ITEM 8: Foundation, Boat Winch, Modify WORK ITEM 9: Sewage Air Compressor, Remove WORK ITEM 10: Stern Door Cross Connect Valves Modify WORK ITEM 11: Interior Deck Covering System, Renew WORK ITEM 12: MDE, Fuel Filter Bank Assembly, Renew WORK ITEM 13: Multi-Cable Transit, Renew iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 085-013, Rev B, Docking Plan Coast Guard Drawing 87 WPB 111-001, Rev H, Shell Expansion Coast Guard Drawing 87 WPB 113-001, Rev G, Platform Plating & Framing Coast Guard Drawing 87 WPB 113-002, Rev B, Galley/Mess Deck Bilge Access Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan Coast Guard Drawing 87 WPB 161-001, Rev C, Skeg Construction Coast Guard Drawing 87 WPB 167-002, Rev C, CG Schedule of Doors, Manholes, Windows & Hatches Coast Guard Drawing 87 WPB 167-003, Rev -, Weather Tight Door for Fuel Station Access Coast Guard Drawing 87 WPB 167-004, Rev H, W.T. Doors and Hatches Coast Guard Drawing 87 WPB 185-001, Rev AP, Auxiliary Foundation Booklet Coast Guard Drawing 87 WPB 243-003, Rev -, Propulsion Shaft Details Coast Guard Drawing 87 WPB 252-002, Rev P, Alarm and Monitoring System Coast Guard Drawing 87 WPB 261-001, Rev L, Fuel Oil Service Piping Coast Guard Drawing 87 WPB 302-001, Rev AB, Misc. Controls Wiring Diagram Coast Guard Drawing 87 WPB 304-001, Rev C, Wireways Arrangement Coast Guard Drawing 87 WPB 304-002, Rev A, Wireway Penetration Details Coast Guard Drawing 87 WPB 304-003, Rev -, Multi-Cable Transit (MCT) Riser Box Coast Guard Drawing 87 WPB 310-001, Rev J, Ship’s Service One-Line Diagram Coast Guard Drawing 87 WPB 321-001, Rev L, Power System Deck Plan Coast Guard Drawing 87 WPB 321-002, Rev AT, Power & Lighting Circuit Details & V.D. Calculations Coast Guard Drawing 87 WPB 436-001, Rev F, Fire Detection System Coast Guard Drawing 87 WPB 514-001, Rev M, HVAC Duct & Piping Systems Coast Guard Drawing 87 WPB 526-001, Rev J, Scuppers & Deck Drains Piping Coast Guard Drawing 87 WPB 556-005, Rev -, Hyd Steering Sys mods for Emer Door Operation Coast Guard Drawing 87 WPB 562-001, Rev A, Rudder Details Coast Guard Drawing 87 WPB 583-001, Rev W, RIB Deployment Structure Coast Guard Drawing 87 WPB 593-005, Rev -, Air Compressor, Removal Coast Guard Drawing 87 WPB 601-001, Rev R, Outboard Profile & General Arrangements Coast Guard Drawing 87 WPB 621-001, Rev K, Joiner Work Details v (Rev-0)

Coast Guard Drawing 87 WPB 633-001, Rev A, Cathodic Protection Coast Guard Drawing 87 WPB 634-001, Rev G, Deck Covering and Details

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual Coast Guard Technical Publication (TP) 4559, SWBS 513, Oct 2019, Ventilation System, Engine Room Coast Guard Technical Publication (TP) 9051, SWBS 436, Mar 2016, Fire Alarm Control Panel NFS-

320/E/C & LCD2-80, Multiple Class Cutters Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2018, Shipboard

Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2018, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, And Installation Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2018, Clean

Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2018, Install Interior

Deck Covering Systems

OTHER REFERENCES

American Society for Nondestructive Testing, SNT-TC-1A: Personnel Qualification and Certification in

Nondestructive Testing, 2016 Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 2011, Commercial Diving Operations MIL-PRF-24613A, Nov 2007, Deck Covering Materials, Interior, Cosmetic Polymeric MIL-PRF-3135H, Sept 2008, Deck Covering Underlay Materials vi (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

4 N Fan, Tube Axial NSN: 4140-01-598-0425 1 ea. 2,223.72 4 N Fan, Tube Axial NSN: 4140-01-598-1549 1 ea. 3,091.15 7 N Fire Alarm Control

Panel NSN: 6320-01-F18-5529 1 ea. 2,185.00

7 N Battery, 12 Volt, 12

AH

NSN: 6140-01-529-4234 2 ea. 151.95

11 N **Panel, Deck, 5/8"x48"x96", Aluminum 5052-H32 Core, 1/4" Cell, 0.063" 6061-T6 Face Sheets, Natural Mill Finish

NSN: 2040-01-F19-5621 PN:

SPXC-1000-1000D

7 Ea. 654.00

13 N Multi-Cable Transit (MCT), Brattberg, with

Removable End

PN: RGSO-4 ALU 1 ea 500.00

13 N Addblocks (4mm-8mm Cable)

PN: 20/4-8 9 ea 20.00

13 N Addblocks (9mm- 13mm Cable)

PN: 20/9-13 6 ea 20.00

13 N Solid Blocks PN: 20/0 21 ea 20.00 13 N Stayplate, 120 mm SS PN: N/A 5 ea 20.00 13 N Endpacking PN: STG1SS 1 ea 30.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter vii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item Title

11 Interior Deck Covering System, Renew

This section is not applicable to this package.

viii (Rev-0)

PRINCIPAL CHARACTERISTICS

87' WPB

PHYSICAL

Length overall 87' Length between perpendiculars 81' 7" Depth 10' 11" Maximum beam 19.4' Draft, mean to design waterline 5' 9" Height of highest projection 50.2' Full load displacement 93.5 long tons Minimum operating displacement 83.9 long tons Displacement, light ship 77.9 long tons Framing Longitudinal Bulkheads Four watertight bulkheads located below the Main Deck Anchor 40 lb Fortress with 480 ft. 3 strand 5/8" dia. Line stayset

HULL

Hull/main weatherdeck material ABS Grade AH 36 Superstructure 5086 Aluminum

MACHINERY

Main propulsion Two MTU 8V396TE94, sequential turbo-charged diesels Reduction gears Two ZF Type BW 255 Propulsion shaft Two AQUAMET 22, 101.6mm Shaft diameter 4" Shaft seal Two John Crane mechanical seals Shaft bearing, intermediate Thordon Elastomeric Bearing Shaft bearing, aft Thordon Elastomeric Bearing Number of propellers 2 Number of blades 5 Diameter of propeller 1040mm Pitch 1230 mm fixed Shaft RPM 828 Rudders Two 316L Stainless Steel Ship's service generators Two Man Model D08241F01 diesel with Stanford 60KW Generator

TANK CAPACITIES

3-9-1-f (fuel oil) 1402 gal 3-9-2-f (fuel oil) 1402 gal 3-12-2-f (waste oil) 86 gal 3-12-1-f (oily water) 86 gal 3-7-0-q (sewage collection) 352 gal 3-7-1-q (grey water) 52 gal 3-12-1-w (fresh water) 200 gal 3-12-2-w (fresh water) 200 gal

1 (Rev-0)

00000_0220_FLT

REC_00000_FLT_Commercial Project @ CG Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

1.1.2 The Contractor shall coordinate with the below-listed USCG-hired contractors to provide access in order to perform the work outlined during the time period in the table below. The Contractor shall ensure that this work is accounted for in their project plan and provide the resources as detailed in the table below.

Contractor Name Work to be

Performed Spaces Effected Period of

Performance Resources

Requested of Prime

POCs

CG Yard SINSII Install Pilot House, Mast

24-28 MAY Power to energize Pilot House systems.

CWO Keith Jarvis

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures

2 (Rev-0)

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific

3 (Rev-0) portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is _________.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

4 (Rev-0)

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

NOTE

SEA DOG is stationed onboard Kings Bay Naval Submarine Base in Kings Bay, GA.

A HAZMAT policy is in effect for all units onboard. The guidelines are discussed below in Section 4.2.

3.7 SFLC Standard Specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:

None.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

4.2 Environmental

4.2.1. Contractor shall be responsible for:

4.2.1.1. Complying with all requirements of TRIREFFACKYINST 5090.1C& 2A and Recycling Instruction 4100.1D.

4.2.1.2 . Providing hazardous materials and supplies to complete operations.

4.2.1.3. Providing all associated material safety data sheets (MSDS) 30 days prior to the start of work to Code

108. (DOD 6050.5)

4.2.1.4. If Hazardous Material is brought onto the base check in the material with Supply Code 5313.

4.2.1.5. Maintain all work areas in a satisfactory state of industrial cleanliness. (29 CFR 1915.81 and 1910.22)

4.2.1.6. Complying with all applicable Federal, State and local environmental laws, rules and regulations. In addition, all specific requirements listed in base permits including RCRA, NPDES, and Title V must be followed.

4.2.1.7. Contacting Code 108 for establishment of waste accumulation area(s).

5 (Rev-0)

4.2.1.8. Attending Satellite Accumulation Area (SAA) training prior to accumulating waste. Contact Code 108.4, for scheduling @ 912-573-2094.

4.2.1.9. Cleaning, sorting and consolidation of all hazardous and industrial waste prior to disposal. Notifying Code 108 of process or material changes that may alter waste streams.

4.2.1.10. Responsible for the cost incurred with required Environmental, Hazardous Waste, or Hazardous Constituent sampling, spill clean up, violations and monetary fines received from Georgia Department of Natural Resources, Environmental Protection Division (GA DNR EPD) and the cost of restoration of areas involved within the scope of clean-up. Contractor is financially responsible for their waste disposal and associated cost including drums, rings, and containments required to properly manage the waste.

4.2.1.11. Controlling dust from hopper filling operations, blasting operations, and discharging to roll-off containers/dumpsters.

4.2.1.12. Notifying Code 108.4 personnel anytime there is a spill in water or on land.

Prior to work and at work completion authorized representatives of both parties conduct work area cleanliness inspections to ensure that work areas are restored to original cleanliness conditions.

4.2.1.13. SUBASE must be notified prior to any portable tanks brought into TRIREFFAC in support of production. The respective contractor shall notify SUBASE for the purpose, content and location of this tank prior to its use. The respective tank must be accompanied by a Spill Prevention and Controls and Countermeasure Plan, per 40 CFR 112.7.

4.2.2. TRIREFFAC will be responsible for:

• All requisite inspections.

• Poviding authorized SAA site and signage.

• Providing Appropriate Satellite Accumulation Area training through Code 108.4 (912-573-2094).

• In the event of gross mismanagement of Hazardous Material or Waste, Code 108 has the authority to stop work until all violation is abated.

• Providing Safety, Explosive Safety and HERO Req. training to all contractor personnel through Code

108.3 @ 912-573- 9765

• Providing the use of dumpsters for non-hazardous waste only.

6 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

7 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL # WORK ITEM

# WORK ITEM TITLE

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

8 (Rev-0)

QA-3A - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /

TIME

9 (Rev-0)

QA-3B - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

10 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

11 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL # WORK ITEM

# WORK ITEM TITLE

COATING MFG PRODUCT NAME BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

12 (Rev-0)

11001_FJL_0220_87WPB

WORK ITEM 1: U/W Body, Diver Clean and Inspect

1. Scope

1.1 Intent. This work item describes the requirements for the Contractor to inspect and clean the vessel’s underwater (U/W) body prior to sea trials, while the vessel is moored pier side. Affected surfaces or components include, but are not limited to the following:

• Hull plating.

• Shafts.

• Transducers

• Propellers.

• Rudders.

• Sea chests and gratings.

• Miscellaneous appendages (examples: bilge keels, rope guards, and fairwaters).

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 085-013, Rev B, Docking Plan Coast Guard Drawing 87 WPB 111-001, Rev H, Shell Expansion Coast Guard Drawing 87 WPB 161-001, Rev C, Skeg Construction Coast Guard Drawing 87 WPB 243-003, Rev -, Propulsion Shaft Details Coast Guard Drawing 87 WPB 562-001, Rev A, Rudder Details

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 2011, Commercial Diving

Operations

13 (Rev-0)

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not Applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.1.5 Dive notification. The Contractor shall provide the Coast Guard Inspector 24 hours advance notice of when the diver inspection will occur. Before diving procedures are commenced, meet with the COR and the Coast Guard Inspector, to discuss diving safety requirements and the securing of cutter machinery, as applicable.

NOTE

Coast Guard preference is to schedule diving operations as near as possible to the end of the availability in order to minimize development of new growth prior to sea trials.

3.2 Pre-diving requirements.

3.2.1 The Contractor shall, in accordance with 29 CFR 1910.401-440, provide a certified diver and a tender team, as well as necessary support personnel and equipment, to accomplish the tasks specified herein.

WARNING

Mixed gas diving and live boating are not permitted.

3.2.2 The Contractor shall ensure that the diving team shall obtain clearance from the Officer-of-the-Deck (OOD) before beginning diving operations. Ensure the Coast Guard Inspector has capability for maintaining continuous two-way communication with diving personnel at all times, during the performance of the this work item.

3.3 Inspection requirements. Using the drawings listed in Section 2 as guidance, the Contractor shall perform the following inspections and fill out forms provided in Section 4. Submit CFR with results of inspections.

14 (Rev-0)

3.3.1 Conduct a pre-clean biofouling inspection. Fill out Form 4-1, including fouler rating for each component (see Table 1 for fouler rating descriptions).

NOTE:

When completing the fouler rating, ensure that all (100%) of the area of the component/surface being inspected has a fouler rating. For example, if only 50% of the rudder has growth at a FR-20 rating, then there should be another rating on the rudder that is FR-0 rating over 50% of the area. All ratings should equal 100% of the area/component being inspected.

TABLE 1 - FOULING RATINGS (FR) IN ORDER OF INCREASING SEVERITY

TYPE FOULING

RATING

(FR)

DESCRIPTION

Soft 0 A clean, foul-free surface; red and/or black AF paint or a bare metal surface.

Soft 10 Light shades of red and green (incipient slime). Bare metal and painted surfaces are visible beneath the fouling.

Soft 20 Slime as dark green patches with yellow or brown colored areas (advanced slime).

Bare metal and painted surfaces may be obscured by the fouling.

Soft 30 Grass as filaments up to 3 inches (76 mm) in length; projections up to ¼ inch (6.4

mm) in height; a flat network of filaments, green, yellow, or brown in color; or soft, non-calcareous fouling such as sea cucumbers, sea grapes, or sea squirts projecting up to ¼ inch (6.4 mm) in height. The fouling cannot be easily wiped off by hand.

Hard 40 Calcareous fouling in the form of tubeworms less than ¼ inch in diameter or height.

Hard 50 Calcareous fouling in the form of barnacles less than ¼ inch in diameter or height.

Hard 60 Combination of tubeworms and barnacles, less than ¼ inch (6.4 mm) in diameter or height.

Hard 70 Combination of tubeworms and barnacles, greater than ¼ inch in diameter or height.

Hard 80 Tubeworms closely packed together and growing upright away from surface.

Barnacles growing one on top of another, ¼ inch or less in height. Calcareous shells appear clean or white in color.

Hard 90 Dense growth of tubeworms with barnacles, ¼ inch or greater in height; calcareous shells brown in color (oysters and mussels); or with slime or grass overlay.

Composite 100 All forms of fouling present, soft and hard, particularly soft sedentary animals without calcareous covering (tunicates) growing over various forms of hard growth.

15 (Rev-0)

TABLE 2 - PAINT DETERIORATION RATINGS (PDR)

FORANTIFOULING/ANTICORROSION (AF/AC) PAINT SYSTEM

PAINT

DETERIORATION

RATING (PDR)

DESCRIPTION

10 AF paint intact, red in color or with mottled pattern of light green and red.

20 AF paint missing from edges, corners, seams welds, river or boll head to expose AC paint.

30 AF paint missing from slightly curved or flat areas to expose AC paint.

40 AF paint missing from intact blisters to expose AC paint.

50 AF blisters ruptured to expose intact AC paint.

60 AF/AC paint missing or peeling to expose steel substrate, no corrosion present.

70 AF/AC paint removed from edges, corners, seams, welds, river or bolt heads to expose steel substrate with corrosion present.

80 Ruptured AF/AC blisters on slightly curved or flat surfaces with corrosion stains present.

90 Area corrosion of steel substrate with no AF/AC paint cover due to peeling or abrasion damage.

100 Area corrosion showing visible surface evidence of pitting, scaling, and roughening or steel substrate.

3.3.2 Conduct diver hull inspection. Fill out Form 4-2. Complete any additional inspection forms as required to document underwater component damage (Forms 4-2, 4-3, and 4-4). See Table 2 for description of Paint Deterioration Ratings (PDR’s).

3.4 Cleaning requirements. The Contractor shall employ suitable means to clean the U/W body surfaces free of all marine growth, debris, and all other surface contaminants as detected during biofouling inspection. The Contractor shall ensure the following:

3.4.1 Ensure all transducer surfaces are cleaned with only hand held brushes, without the use of power attachments.

3.4.2 Ensure that existing u/w body coating system or non-coated surfaces do not incur any damage during cleaning process.

3.5 Additional documentation requirements. The Contractor shall submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.) before and after cleaning. Place linear measuring devices, as applicable, in the field of view when videotaping hull damages, to provide scale for these damages.

16 (Rev-0)

4. NOTES

4.1 Unit responsibilities. The ship's force will tag-out and secure the following:

• All propulsion machinery and shafting and all steering machinery whenever the diver is in the water.

• All underwater body transducers, including the sonar equipment, for the duration of the underwater hull cleaning operation.

• All active cathodic protection equipment for the duration of the hull cleaning operation.

• Each sea suction while the diver is inspecting the sea suction's sea chest strainer.

4.2 Inspection forms. (See following pages)

17 (Rev-0)

FORM 4-1. PRE-CLEAN BIOFOULING INSPECTION DATA

VESSEL NAME: HULL TYPE / NUMBER LOCATION (CITY) DATE (mm/dd/yy)

PRODUCT LINE: INSPECTING ACTIVITY VISIBILITY (ft)

LOCATION OF LAST DRYDOCKING UNDOCKING DATE

LOCATION OF LAST PAINTING DATE

PAINT

TYPE: ANTIFOULING: ANTICORROSION:

DATE OF THE LAST WATERBORNE FULL HULL CLEANING DATE OF THE LAST WATERBORNE INTERIM CLEANING

UNDERWATER PHOTOGRAPHS TAKEN □ YES □ NO VIDEO TAKEN □ YES □ NO

COMPONENTS ( CHECK IF: )

N/A NOT INSPECTED

( PERCENTAGES MUST ADD UP TO 100 )

FOULING RATING FOULING RATING FOULING RATING

PROPELLER Centerline FR- % FR- % FR- %

Port Outboard FR- % FR- % FR- %

Port Inboard FR- % FR- % FR- %

Starboard Inboard FR- % FR- % FR- %

Starboard Outboard FR- % FR- % FR- %

SHAFT Centerline FR- % FR- % FR- %

Port Outboard FR- % FR- % FR- %

Port Inboard FR- % FR- % FR- %

Starboard Inboard FR- % FR- % FR- %

Starboard Outboard FR- % FR- % FR- %

RUDDER Centerline FR- % FR- % FR- %

Port FR- % FR- % FR- %

Starboard FR- % FR- % FR- %

SONAR DOME Port Side FR- % FR- % FR- %

Starboard Side FR- % FR- % FR- %

SEA CHEST Typical FR- % FR- % FR- %

BOW Port FR- % FR- % FR- %

Starboard FR- % FR- % FR- %

SIDES Port FR- % FR- % FR- %

Starboard FR- % FR- % FR- %

BOTTOM Port FR- % FR- % FR- %

Starboard FR- % FR- % FR- %

STERN Port FR- % FR- % FR- %

Starboard FR- % FR- % FR- %

TRANSOM Port FR- % FR- % FR- %

Starboard FR- % FR- % FR- %

Signature (Ship’s Engineer):_______________________________________________________ Signature (Diving Supervisor):______________________________________________________

18 (Rev-0)

FORM 4-2. DIVER HULL INSPECTION DATA

VESSEL NAME: HULL TYPE / NUMBER LOCATION (CITY) DATE (mm/dd/yy)

PRODUCT LINE: INSPECTING ACTIVITY VISIBILITY (ft)

LOCATION OF LAST DRYDOCKING UNDOCKING DATE

LOCATION OF LAST PAINTING DATE

PAINT

TYPE: ANTIFOULING: ANTICORROSION:

DATE OF THE LAST WATERBORNE FULL HULL CLEANING DATE OF THE LAST WATERBORNE INTERIM CLEANING

UNDERWATER PHOTOGRAPHS TAKEN □ YES □ NO UNDERWATER COLOR VIDEO TAKEN □ YES □ NO

UNDERWATER WORK ACCOMPLISHED THIS DATE

□ FULL CLEAN □POLISH □MULTI-BRUSH □INSPECT □PAINT

□INTERIM □HYDRO □HAND-HELD □REPAIR □OTHER__________________________________

1. HULL COATING SYSTEM (PDR___________)

a. ANTIFOULING PAINT

PERCENTAGE REMAINING________________ PERCENT REJUVENATION________________

IS THE A/F □ HARD □ SOFT

PERCENTAGE __________ PEELING __________ LOCALIZED or __________ GENERAL __________ BLISTERING __________ LOCALIZED or __________ GENERAL __________ ABRASION __________ LOCALIZED or __________ GENERAL

CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ]

b) ANTICORROSION PAINT

PERCENTAGE REMAINING _______________

PERCENTAGE __________ PEELING __________ LOCALIZED or __________ GENERAL __________ BLISTERING __________ LOCALIZED or __________ GENERAL __________ ABRASION __________ LOCALIZED or __________ GENERAL

CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ]

c) DOCKING BLOCK AREAS (PDR _________)

AVERAGE PERCENTAGE OF BLOCK AREAS PAINTED ____________________ %

BARE METAL PITTING ____________________ % __________________ IN. DIAMETER ____________________ IN. DEEP

CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ]

19 (Rev-0)

FORM 4-2. DIVER HULL INSPECTION DATA (CONTINUED)

2. CATHODIC PROTECTION SYSTEM

a. SACRIFICIAL ANODES (ZINCS)

AVERAGE PERCENTAGES OF ANODES REMANING ____________________ %

ANODES ARE: □ UNIFORMLY WASTED □ WASTAGE GREATEST IN FOLLOWING AREAS:

ANODES ARE : □ WELDED □ BOLTED □ BOTH

NUMBER AND LOCATION OF ANY ANODES MISSING OR INACTIVE:

MISSING___________________________________________________

INACTIVE__________________________________________________

b. IMPRESSED CURRENT □ NOT APPLICABLE

□ DAMAGE NOTED ON ATTACHED DRAWING (Port/Stbd) (FRAME ____________________ )

□ WIRES LOOSE, BROKEN, OR MISSING (Port/Stbd) (FRAME ____________________ )

□ CAPASTIC SHIELD DAMAGE (Port/Stbd) (FRAME ____________________ )

□ INSULATORS LOOSE OR DAMAGED (Port/Stbd) (FRAME ____________________ )

□ OTHER (Port/Stbd) (FRAME ____________________ )

3. GENERAL HULL DAMAGE (HULL PLATING, BILGE KEELS, etc.):

4. HULL PENETRATIONS (PDR _________)

_______________ % CLOGGED WITH MARINE GROWTH (POST CLEAN)

_______________ % BARE METAL (AREA SURROUNDING PENETRATION)

_______________ % BARE METAL PITTING

AVERAGE PIT SIZE: _______________ in. DIAMETER, _______________ in. DEPTH

CONDITION SUMMARY: ___________________________________________________

20 (Rev-0)

FORM 4-2. DIVER HULL INSPECTION DATA (CONTINUED)

5. SONAR DOME □ NOT APPLICABLE

□ NO VISIBLE DAMAGE □ DAMAGE NOTED ON ATTACHED DRAWING □ CUTS □ LAYER SEPARATION □ WIRE PILES EXPOSED

6. PROPULSION SHAFTING

VISIBLE BARE METAL □ YES □ NO RUST BLEEDING □ YES □ NO PITTING □ YES □ NO

CONDITION SUMMARY (TYPE OF DAMAGE, LOCATION AND SIZE):

7. STRUTS AND BEARING HOUSING

PERCENT BARE METAL: STARBOARD PORT

MAIN _________________________ % ___________________ %

INTERMEDIATE _________________________ % ___________________ %

PDR _________________________ ___________________

CONDITION OF STRUT LEADING AND TRAILING EDGES: ______________________________________

CONDITION OF ROPE GUARDS: __________________________________________________

CONDITION OF FAIRWATERS: ___________________________________________________

8. RUDDERS

□ NO DAMAGE □ DAMAGE SHOWN ON ATTACHED DRAWINGS

STARBOARD PORT

PERCENT BARE METAL % %

PDR

ACCESS PLATES INTACT? □ YES □ NO □ YES □ NO

WAS RUDDER SOUNDED? □ YES □ NO □ YES □ NO

ANY SIGNS OF

FLOODING? □ YES □ NO □ YES □ NO

ANY SIGNS OF

DROPPING? □ YES □ NO □ YES □ NO

CONDITION SUMMARY:

9. PROPELLERS

□ NO DAMAGE □ DAMAGE SHOWN ON ATTACHED DRAWINGS

PROP #1: NICKS __________ CURLS __________ CRACKS – LARGEST CRACK LENGTH __________ in.

PROP #2: NICKS __________ CURLS __________ CRACKS – LARGEST CRACK LENGTH __________ in.

PROPELLERS NUMBERED STARBOARD TO PORT.

21 (Rev-0)

Diving Supervisor: ___________________________________________ Ship’s Engineer: _________________________________

22 (Rev-0)

FORM 4-3. PROPELLER VISUAL INSPECTION FORM

Pressure Face Suction Face

Contractor inspector (written/signature): /

USCG (written/signature): /

23 (Rev-0)

FORM 4-4. PORT AND STARBOARD RUDDER INSPECTION DATA

24 (Rev-0)

16700_FJL_0220_87WPB

WORK ITEM 2: Watertight Closures, Assess

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform a condition assessment of all installed watertight closures.

TABLE 1 - 87’ WPB WATERTIGHT CLOSURES

LOCATION DESIGNATION DESCRIPTION

Pilot House Access 01-15-0 54” x 24” Clear Opening w/ 4-Dog Weathertight Door w/2 Windows

(Hulls 87301-87309) Pilot House Access 01-15-0 54” x 24” Clear Opening, Quick-Acting Heavy Duty Style w/

Window, Weathertight (Hulls 87310 on) Forepeak Access 1-1-2 18” Clear Opening Round Al. Cast Hatch, SST Deck Ring w/ Integral

Topside Handle Fwd Crew Quarters Access

1-2-0 24”x24” Clear Opening 4-Dog Quick Action WTRTT Raised Hatch

Deck Locker Access 1-6-0 52” x 26” Clear Opening 6-Dog, Quick Acting WTRTT Door Fuel Station Access 1-6-2 26” x 28” Clear Opening, 8-Dog, Weathertight, Individually-Dogged Main Deck Access 1-15-0 54” x 26” Clear Opening, 6-Dog, Quick Acting WTRTT Door Engine Room Access 1-21-1 24” x 24” Clear Opening 4-Dog Quick Acting WTRTT Raised Hatch Lazaret Access (Stbd) 1-22-1 24” x 24” Clear Opening 4-Dog Quick Acting WTRTT Raised Hatch Lazaret Access (Port) 1-22-2 24” x 24” Clear Opening 4-Dog Quick Acting WTRTT Flush Hatch Fwd Passageway Access

2-9-0 54” x 26” Clear Opening 6-Dog, Quick Acting WTRTT Door

Engine Room Access 2-14-0 54” x 26” Clear Opening 6-Dog, Quick Acting WTRTT Door

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 167-002, Rev C, CG Schedule of Doors, Manholes, Windows &

Hatches Coast Guard Drawing 87 WPB 167-003, Rev -, Weather Tight Door for Fuel Station Access Coast Guard Drawing 87 WPB 167-004, Rev H, W.T. Doors and Hatches

25 (Rev-0)

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.1.5 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and non-destructive examination (NDE) in accordance with SFLC Std Spec 0740.

3.2. Watertight closure assessment. Using Coast Guard Drawings 87 WPB 167-002, 87 WPB 167-003, and 87 WPB 167-004 as reference, the Contractor shall perform an assessment of all watertight closures listed in Table 1 as follows. Submit CFR with results of inspections including recommendations for repair or renewal:

3.2.1 Inspect all watertight closures for loose, missing or damaged parts; wear of hinge pins and striker plates; and clogged drain lines where applicable.

3.2.2 Operate closures through complete dogging cycle, checking for binding and/or difficult operation.

3.2.3 Inspect closure gasket for the following:

3.2.3.1 Paint/foreign matter, cracks, or deterioration.

26 (Rev-0)

3.2.3.2 Uneven or excessive depression (greater than 1/8”).

3.2.3.3 Gaps greater than 1/16” where ends meet, or any ends that meet in a radius (except for round closures).

3.2.4 Apply grease to all intact grease fittings. Note any missing or broken fittings.

3.2.5 Inspect closure knife edge for nicks and gouges. Repair minor gouges by filing smooth.

NOTE

If the nick or gouge has a gap greater than 1/16”, the knife edge may require weld buildup prior to filing smooth in order to keep the knife edge fair.

3.2.6 Chalk test. Perform a chalk test of all inspected closures in accordance with SFLC Std Spec 0740, Appendix C.

3.2.7 Water hose test. Perform a water hose test of all watertight closure boundaries in accordance with SFLC Std Spec 0740, Appendix C.

3.2.8 String test. Perform a string test of all inspected closures to identify any twisting and/or warpage of knife edge. Measure and report gap at the intersection of the two strings both when pulled taught across corners and when pulled taut across the midpoints of the sides. See Figure 1 for guidance.

FIGURE 1. KNIFE EDGE STRING TEST

3.3 Repair change request authorization. If a Change Request has been authorized and released by the Contracting Officer (KO), the Contractor shall execute minor repairs as identified by CFR to return…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .