The file's text, extracted by GovTribe without its formatting.
SECTION B – SCHEDULE OF ITEMS
127EAW21R0028 - LTBMU ROUNDHILL PINES PROJECT
LAKE TAHOE BASIN MANAGEMENT UNIT
B- 1 - SCHEDULE OF ITEMS (BASE CONSTRUCTION)
ITEM NO.
DESCRIPTION
PAY UNIT
EST.
QTY.
UNIT PRICE
TOTAL PRICE
15101
| Mobilization |
| Lump Sum |
| 1 |
| $________ |
| $____________ |
| Bonding |
| Lump Sum |
| 1 |
| $________ |
| $____________ |
| 15201 |
| 15201 Construction survey and staking, method (i) |
| Lump Sum |
| 1 |
| $________ |
| $____________ |
| 20102 |
| Clearing and grubbing, disposal method (a) |
| Lump Sum |
| 1 |
| 20207 |
| Removal of Individual Trees, disposal method (FS permit) |
| Each |
| 81 |
| 20301 |
| Pavement Removal Disposal Method (a) |
| Square yard |
| 2,515 |
| 20402 |
| Roadway excavation and embankment, compaction placement method (a) |
| Mile |
| 0.5 |
| 20415 |
| Embankment construction, compaction placement method (a) |
| Cubic Yard |
| 400 |
| 20425 |
| Drainage Excavation, type sediment basin |
| Each |
| 2 |
| 20425 |
| Drainage Excavation, type swale ditch |
| Linear Feet |
| 235 |
| 25701 |
| Rock Retaining Wall, Dry Stack |
| Linear Feet |
| 197 |
| 30202 |
| Aggregate base, CalTrans ¾” Class 2, or approved equal |
| Ton |
| 1909 |
| 40304 |
| Asphalt Concrete, CalTrans ½” Max Medium ‘B’ Type, or approved equal |
| Ton |
| 1430 |
| 60102 |
| Concrete, Sidewalk |
| Square Yard |
| 59 |
| 60103 |
| Concrete, Stairway with Handrail |
| Each |
| 1 |
| 60902 |
| Curb and gutter, Curb with Gutter, 9.5 inches depth |
| Linear Feet |
| 1723 |
| 60903 |
| Curb and gutter, Valley Gutter, 7-inch depth |
| Linear Feet |
| 159 |
| 63501 |
| Temporary traffic control |
| Lump Sum |
| 1 |
| 63603 |
| Conduit, 4-inch, Schedule 40 PVC |
| Linear Feet |
| 180 |
| 63603 |
| Conduit, 2-inch, Schedule 40 PVC |
| Linear Feet |
| 180 |
| $________ |
| $____________ |
| 60404 |
| Manhole adjustment |
| Lump Sum |
| 1 |
| 61802 |
| Concrete Foundation for Handrail |
| Linear Feet |
| 177 |
| 61905 |
| Relocate Existing Boulders |
| Each |
| 79 |
| 61906 |
| Double Gate 32 feet |
| Lump Sum |
| 1 |
| 63401 |
| Pavement markings Solid Double Yellow Line, Type B |
| Linear Feet |
| 839 |
| 63405 |
| Pavement markings White Directional Arrows, Type B |
| Each |
| 8 |
| 63405 |
| Pavement markings, Cross Walks, Type B |
| Each |
| 8 |
| 63405 |
| Pavement markings, Single White Parking Lot Striping, Type B |
| Linear Feet |
| 5068 |
| 63405 |
| Pavement markings, White Cross Hatching, Type B |
| Square Feet |
| 7000 |
| 63405 |
| Pavement markings, Blue Handicap Parking Area Marks, Type B |
| Each |
| 8 |
BASE ITEMS SUB TOTAL:
B- 2 - SCHEDULE OF ITEMS (OPTION ITEMS)
ITEM NO.
DESCRIPTION
PAY UNIT
EST.
QTY.
UNIT PRICE
TOTAL PRICE
| 61802 |
| Handrail on Concrete Foundation |
| Linear Feet |
| 177 |
| $________ |
| $____________ |
| 61905 |
| Boulder |
| Each |
| 71 |
| $________ |
| $____________ |
OPTION ITEMS TOTAL:
BASE ITEMS & OPTION ITEMS TOTAL:
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
| Company Name: |
| POC & Title: |