5. REPAIR EXTERIOR BLDG 500 - FULL SET.pdf
PDF 7 MB Posted
- Attached to
- Building 500 Industry Day
- Solicitation number
- FA4626-25-R-B500
About this file
This is a set of architectural drawings and specifications for the repair of Building 500's exterior at Malmstrom Air Force Base. The drawings consist of five sheets (G-01 Cover Sheet, G-02 Site Overview, A-01 Main Floor, A-02 Elevations, and A-03 Pictures) that detail a three-story building with a tower reaching 56 feet in height and dimensions of approximately 272' x 152'.
The scope of work requires the contractor to provide labor, equipment, and materials to inspect and prepare surfaces for sealant, primer, and two top coats per ASTM D4258. The work includes patching spalled or gouged areas in the precast exterior with concrete filler, painting of retention walls, bollards, handrails, and exposed mechanical/electrical equipment to match adjacent surfaces. The contractor must protect stormwater inlets, provide daily site cleanup, and submit detailed work documentation in accordance with state and federal requirements. This drawing package appears to support the Industry Day pre-solicitation announcement seeking contractor input on options to either recover the existing concrete finish or pursue alternative exterior covering options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1. B500 Sources Sought.pdf | ||
| 3. Exterior 2.jpg | JPG image | |
| 4. Exterior 3.jpg | JPG image | |
| 6. CEAL Request.xlsx | XLSX spreadsheet | |
| 2. Exterior 1.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE _______ OF _______
Project number
Date
Drawn by
Checked by
PROJECT NUMBER
DSN CONTRACT NUMBER
CSN CONTRACT NUMBER
3/ 7/ :4 1:
A M
G-01
COVER SHEET
2430110
REPAIR EXTERIOR
BUILDING 500
MALMSTROM AIR
FORCE BASE
Issue Date Author
Checker
REPAIR EXTERIOR BUILDING 500
2430110
MALMSTROM AIR FORCE BASE
1 FRONT PERSPECTIVE
GENERAL NOTES
1. GENERAL CONTRACTOR SHALL VERIFY DIMENSIONS AND CONDITIONS OF SITE OR BUILDINGS INCLUDED IN PROJECT SCOPE
OF WORK.
2. THE TERM "CONTRACTOR" REFERS TO THE GENERAL CONTRACTOR UNLESS OTHERWISE SPECIFIED.
3. ALL ON SITE COORDINATION AND QUALITY CONTROL IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
4. GENERAL CONTRACTOR RESPONSIBLE FOR THE COMPLETE REPAIR AND REFINISHING OF ALL WORK TO MATCH EXISTING CONDITIONS AS A RESULT OF CUTTING, PATCHING OR DEMOLITION BY ALL TRADES WHILE PERFORMING WORK.
5. GENERAL CONTRACTOR TO PROVIDE ALL REQUIRED BLOCKING, ANCHORAGES, MILL WORK, TRIM, AND GRAB BARS.
6. ANY AND ALL DAMAGE CAUSED BY THE CONTRACTOR AND OR THE PEOPLE UNDER SUPERVISION OF THE CONTRACTOR
SHALL BE REPLACED AND OR REPAIRED AT THE CONTRACTORS EXPENSE.
Sheet List
Sheet Name Sheet Number
Page Number Discipline
COVER SHEET G-01 1 GENERAL
SITE OVERVIEW G-02 2 GENERAL
MAIN FLOOR A-01 3 ARCHITECTURAL
ELEVATIONS A-02 4 ARCHITECTURAL
PICTURES A-03 5 ARCHITECTURAL
SUMMARY OF WORK
1. THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS FOR PROJECT. CONTRACTOR SHALL INSPECT AND PREPARE ALL SURFACES FOR THE APPLICATION OF SEALANT, PRIMER AND TOP COATS (2) PER ASTM D4258.
CONTRACTOR SHALL EXAMINE SURFACES SCHEDULED TO BE FINISHED PRIOR TO COMMENCEMENT OF WORK AND REPORT
ANY CONDITION THAT MAY POTENTIALLY AFFECT PROPER APPLICATION.
2. THE CONTRACTOR SHALL PATCH ALL SPALLED OR GOUGED AREAS IN THE PRECAST EXTERIOR OF THE FACILITY WITH
CONCRETE FILLER PRIOR TO THE APPLICATION OF SEALANT, PRIMER AND TOP COATS (2).
3. THE CONTRACTOR SHALL DISPOSE OF ALL EXCESS MATERIALS AND MATERIALS REMOVED DURING PREPARATION TO
INCLUDE PAINT CHIPS AND MASONRY DEBRIS.
4. CONTRACTOR TO PROTECT ALL STORMWATER INLETS FROM CONSTRUCTION DEBRIS AND PROVIDE DAILY SITE CLEANUP.
4. THE CONTRACTOR SHALL SUBMIT A DETAILED REPORT OF WORK ACCOMPLISHED. THE CONTRACTOR SHALL PROVIDE ALL
DOCUMENTATION AND INSPECTIONS IN ACCORDANCE WITH STATE AND FEDERAL REQUIREMENTS.
5. WORK SHALL INCLUDE INSPECTION AND PREPARATION OF ALL SURFACES FOR THE APPLICATION OF SEALANT, PRIMER AND TOP COATS (2) ON ADDITIONAL RETENTION WALLS, BOLLARDS AND HANDRAILS THAT SURROUND THE BUILDING, SPECIFIED ON
THE DRAWINGS.
6. UNLESS OTHERWISE SPECIFIED OR NOTED PAINT ALL “UNFINISHED” AND "FINISHED" CONDUITS, PIPING, HANGERS, DUCTWORK, BOLLARDS AND OTHER MECHANICAL AND ELECTRICAL EQUIPMENT WITH COLOR TO MATCH ADJACENT EXTERIOR
SURFACES WHERE EXPOSED TO VIEW OR DIRECTED BY THE CONTRACTING OFFICER.
7. DO NOT PAINT: FIRE RATING LABELS, EQUIPMENT SERIAL NUMBERS AND CAPACITY LABELS OR OPERATING PARTS OF
EQUIPMENT.
8. WORK SHALL BE CONDUCTED IN ACCORDANCE WITH MANUFACTURER ’S SPECIFICATIONS AND RECOMMENDATIONS.
No. Description Date
A-03
Sim
A-03
Sim
A-03
Sim
A-03
Sim
A-03
Sim
A-03
Sim
A-03
Sim
A-03
Sim
BUILDING 500
A-03
Sim
PAGE _______ OF _______
Project number
Date
Drawn by
Checked by
DSN CONTRACT NUMBER
CSN CONTRACT NUMBER
3/ 7/ :4 1:
A M
G-02
SITE OVERVIEW
2430110
REPAIR EXTERIOR
BUILDING 500
Issue Date Author
Checker
NOT TO SCALE1 Site Overview
GENERAL NOTES
1. NOT ALL ITEMS ARE DEPICTED THAT REQUIRE PAINT
DN
DN
DN
DN
DN
A-024
A-02
A-02
A-02
7' - 0" 61' - 6" 272' - 6 1/16"
2' 1/
PAGE _______ OF _______
Project number
Date
Drawn by
Checked by
DSN CONTRACT NUMBER
CSN CONTRACT NUMBER
3/ 7/ :4 1:
A M
A-01
MAIN FLOOR
2430110
REPAIR EXTERIOR
BUILDING 500
Issue Date Author
Checker
1/16" 1'-0"1 Level 1
Level 1 0' - 0"
Level 2 15' - 0"
Level 3 27' - 6"
Roof 45' - 3"
Parapet 47' - 1"
Basement -11' - 3"
Tower Parapet 56' - 0"
Level 1 0' - 0"
Level 2 15' - 0"
Level 3 27' - 6"
Roof 45' - 3"
Parapet 47' - 1"
Basement -11' - 3"
Tower Parapet 56' - 0"
Level 1 0' - 0"
Level 2 15' - 0"
Level 3 27' - 6"
Roof 45' - 3"
Parapet 47' - 1"
Basement -11' - 3"
Tower Parapet 56' - 0"
Level 1 0' - 0"
Level 2 15' - 0"
Level 3 27' - 6"
Roof 45' - 3"
Parapet 47' - 1"
Basement -11' - 3"
Tower Parapet 56' - 0"
PAGE _______ OF _______
Project number
Date
Drawn by
Checked by
DSN CONTRACT NUMBER
CSN CONTRACT NUMBER
3/ 7/ :4 1:
A M
A-02
ELEVATIONS
2430110
REPAIR EXTERIOR
BUILDING 500
Issue Date Author
Checker
1/16" 1'-0"1 North
1/16" 1'-0"2 South
1/16" 1'-0"3 West 1/16" 1'-0"4 East
PAGE _______ OF _______
Project number
Date
Drawn by
Checked by
DSN CONTRACT NUMBER
CSN CONTRACT NUMBER
3/ 7/ :4 1:
A M
A-03
PICTURES
2430110
REPAIR EXTERIOR
BUILDING 500
Issue Date Author
Checker
NOT TO SCALE1 FRONT VIEW
NOT TO SCALE2 REAR VIEW
NOT TO SCALE3 LEFT VIEW
NOT TO SCALE4 RIGHT VEIW
NOT TO SCALE5 RW-8
NOT TO SCALE6 RW-1
NOT TO SCALE7 RW-2
NOT TO SCALE8 RW-3
NOT TO SCALE9 RW-4
NOT TO SCALE10 RW-5
NOT TO SCALE11 RW-6
NOT TO SCALE12 RW-7
NOT TO SCALE13 RW-9
| Sheets: A-01 - MAIN FLOOR |
| Sheets: A-02 - ELEVATIONS |
| Sheets: A-03 - PICTURES |
| Sheets: G-01 - COVER SHEET |
| Sheets: G-02 - SITE OVERVIEW |
File details come from the government source that posted it. Updated .