5-Combined Project Budget, Scope of Work and Funding Worksheet.docx

DOCX document 35 KB Posted

Attached to
2028 Capital Outlay Application - Vehicles & Equipment - 11/4
Solicitation number
US.261105
Issued by
New Mexico

About this file

This is a 2028 Colorado Capital Outlay Application worksheet template for combined project budgeting, scope of work, and funding documentation, administered by the State of Colorado for facility improvement projects. The document serves as a comprehensive application framework for renovation, code compliance, and new addition projects, requiring applicants to detail existing conditions, proposed work scope with specific deliverables and quantities, project phases with completion status and timing, planning and design status, permitting requirements, and service continuity measures. The worksheet distinguishes between current-phase costs and full-project costs, requiring applicants to identify measurable work, affected locations, exclusions, and dependencies, with instructions noting that renovations of $225,000 or less may not require formal planning and design, while renovations exceeding $225,000 and new construction additions must include proof of completed planning and design appropriate to the requested work.

The budget section requires itemization of all project costs across categories including land acquisition, planning and architectural services, assessments, environmental testing, permits, site preparation, renovation or code-compliance work, new-addition construction, equipment installation, construction administration, and contingency amounts. The funding reconciliation section requires applicants to identify all funding sources, distinguish between secured, pending, and anticipated funds, and reconcile current-phase and full-project costs against identified funding. Applicants must disclose prior expenditures separately from available funds for future work, provide itemized contractor estimates or professional cost estimates, attach proof of required planning and design completion, submit obtained permits and approval schedules, and complete final verification checklist confirming no cost or funding duplication and readiness to proceed. The template requires applicant certification and is designed to ensure comprehensive project documentation before final program release and funding determination.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2028 CO Application Combined Project Budget, Scope of Work and Funding Worksheet Draft applicant template | Renovation, code compliance and new additions Instructions Complete one combined worksheet for the project or phase included in the application. Identify the current phase separately from the full project, from beginning to end.

Describe measurable work, affected locations, quantities, deliverables and exclusions. Add table rows or attachments as necessary.

Enter dollar amounts in the budget and funding tables. Use N/A where appropriate. Do not duplicate costs or funding sources.

Draft assumption: the $225,000 renovation threshold applies to total renovation project cost, not just the amount requested. Confirm this basis before final program release.

Renovations of $225,000 or less may not need formal planning and design, depending on scope. Permits may still be necessary; identify requirements and status.

Renovations greater than $225,000 and construction of new additions must include proof of completed planning and design appropriate to the requested work. If incomplete, identify planning and design as the initial phase. This draft treats additions as new construction; confirm before release.

Planning and design may include assessments, environmental testing, engineering, cost estimates and other preconstruction activities, not only schematics or blueprints.

This draft worksheet does not establish cost eligibility or guarantee funding. Confirm final application requirements before submission.

1. Applicant and project information Applicant/entity name:

Facility name and physical address:

Project title:

Contact name, title, telephone and email:

Project type: ☐ Renovation ☐ Code compliance ☐ New addition ☐ Combination Request type: ☐ Planning and design ☐ Renovation/construction ☐ Other: __________ Current phase number and title:

2. Scope of work A. Existing conditions and need: Describe the problem, affected areas and beneficiaries.

B. Proposed work: Describe what this application phase will accomplish.

Work item / location
Quantity or extent
Specific work / deliverable

1.

2.

3.

4.

5.

C. Exclusions and dependencies: What is not included, and what must occur first?

D. Overall project: Explain how this phase fits into the full project.

Phase / title
Work and completion status
Estimated cost ($)
Timing

Phase 1

Phase 2

Phase 3 / later

Can the current phase be used independently of future phases? ☐ Yes ☐ No. Explain:

Expected start: __________________ Expected completion: __________________ E. Service continuity: Describe closures, relocation or measures to maintain services.

3. Planning, permitting and readiness Renovation category: ☐ $225,000 or less ☐ Greater than $225,000 ☐ N/A Planning/design status: ☐ Complete ☐ Partial ☐ Not started ☐ Not necessary for scope Explain the determination, completed activities, responsible professionals and remaining work:

Documents attached: ☐ Drawings/specifications ☐ Assessments ☐ Environmental testing ☐ Engineering evaluation ☐ Cost estimate ☐ Other: __________ Code compliance, if applicable: Identify deficiency, reviewing authority, corrective work and deadline. Attach supporting reports or notices.

Permits/approvals required? ☐ Yes ☐ No ☐ Not yet determined Who determined requirements and on what basis? If unknown, explain how and when they will be determined.

Permit / approval and issuing authority
Status
Expected date / responsible party

Outstanding issues: Describe procurement, site control, utility, approval or other readiness dependencies.

Project manager / responsible party:

4. Project budget Current-phase costs are a subset of full-project costs. Do not add the two columns together. For a single-phase project, the columns may match. Include costs across all phases in the full-project column and distinguish prior expenditures from remaining costs below.

Cost category
Current phase ($)
Full project ($)

Land acquisition, if applicable

Planning, architectural and engineering design

Facility/site assessments and surveys

Environmental testing and investigations

Permit and approval fees

Site preparation and utilities

Renovation / code-compliance work

New-addition construction

Equipment / installation included in scope

Construction administration / inspections / testing

Other (describe):

Contingency (explain basis):

TOTAL PROJECT COST

Current-phase total (A): $____________ Amount requested (B): $____________ Other funding needed for this phase (A − B): $____________ Full-project cost: $____________ Prior-phase costs already incurred: $____________ Remaining project costs, including current phase: $____________ Estimate preparer, preparation/update date, basis and supporting document references:

Explain contingency and any significant cost uncertainties:

5. Funding sources and reconciliation List each source once. Allocate amounts to the applicable phase. Do not represent funds already spent as available for new work. Identify secured, pending and anticipated funding separately.

Source / reference
Status
Current phase ($)
Other phases ($)
This application request
Requested

Secured / pending / anticipated

Secured / pending / anticipated

Secured / pending / anticipated

Secured / pending / anticipated

Secured / pending / anticipated

TOTAL IDENTIFIED FUNDING

Current-phase reconciliation

Calculation
Amount ($)

A. Current-phase cost (Section 4)

B. Amount requested in this application

C. Other secured funding allocated to current phase

D. Other pending/anticipated funding allocated to current phase

E. Unidentified funding gap: A − B − C − D

F. Amount not yet secured today: A − C (includes this request)

If E is negative, explain excess funding or revise allocations. Pending and anticipated sources remain uncertain until secured.

Funding restrictions, availability dates and plan if pending funds are not awarded:

Full-project reconciliation Total full-project cost: $____________ Total identified funding across all phases, including prior funding spent: $____________ Unidentified full-project funding gap: $____________ Of total identified funding, amount already spent on prior phases: $____________ Count the application request once. Reconcile full-project costs and funding on the same beginning-to-end basis; separately disclose prior expenditures.

6. Attachments and applicant review ☐ Itemized estimates, contractor quotes or professional cost estimates.

☐ Proof of completed planning/design for renovations greater than $225,000 and construction of new additions.

☐ Planning/design determination for renovations of $225,000 or less, with explanation if unnecessary.

☐ Obtained permits/approvals and schedule for remaining approvals.

☐ Code-compliance inspection reports, notices or assessments, if applicable.

☐ Commitment documentation for secured funding.

☐ Phase schedule and supplemental scope/budget information as needed.

Attachment list / document names:

Final checks ☐ Scope, budget, funding request and schedule describe the same work.

☐ Current phase and full project are clearly distinguished.

☐ Required planning/design proof is attached.

☐ Permitting requirements and status are identified, including for smaller renovations.

☐ No costs or funding are duplicated; funding status and gaps are disclosed.

☐ Prior expenditures are distinguished from funds available for future work.

Applicant acknowledgment I certify that the information provided accurately describes the proposed scope, project phase, cost estimates, funding status and readiness to proceed to the best of my knowledge.

Prepared by / title:

Signature: __________________________________ Date: __________________ 2028 CO | Draft combined project worksheet