This document is a Bid Form for Construction Services issued by Halifax Health Medical Center (HHMC) for Project PROJ-25-133, specifically for a France Tower Helipad Roof Access Hatch. The bid invites contractors to submit a comprehensive proposal that includes a detailed project schedule/timeline, a Schedule of Values broken down by division, and a detailed work description demonstrating full understanding of the project scope. Bidders are required to hold their bid open for 120 days from the bid due date and agree to complete the work according to a schedule submitted and approved by HHMC.

The bid form requires contractors to quote a total project cost and accept responsibility for any facility repairs resulting from trucks operating outside designated routes. While the specific total project cost is left blank for the bidder to complete, the document mandates that the bid submission include detailed documentation such as a project timeline with sufficient detail to show comprehension of specifications, a Schedule of Values that lists any requested allowances separately, and a work description proving the bidder's understanding of the Scope of Work. The contractor must be prepared to complete the project within a timeline to be reviewed and approved by HHMC.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G

HALIFAX HEALTH MEDICAL CENTER

BID FORM of TOTAL PROJECT COST

Invitation to Bid for Construction Services

PROJ-25-133 – HHMC FRANCE TOWER HELIPAD ROOF ACCESS

HATCH

I/We propose to furnish the work described below at the following delivered price:

Contractor shall be responsible for any repair needed to the facility as a result of damages caused by trucks going outside designated routes.

As part of the project bid submittal, a detailed schedule/timeline must be included with each bid response. Sufficient detail will be included in the project schedule/timeline to demonstrate the bidder fully understands the project scope and specifications.

In addition, a Schedule of Values detailed by division must be provided with bid submittal and will include any requested allowances. Requested allowances will be listed separately.

Bidder will include with their bid submittal a detailed work description to show they fully understand the Scope of Work.

The Contractor agrees to:

A. Hold this bid open to acceptance for 120 days from the bid due date.

B. Accomplish project work in accordance with details provided in the bid solicitation.

C. Complete the work within a detailed schedule submitted to HHMC by the successful bidder for review and approval.