This document is a Justification and Approval (J&A) for the use of other than full and open competition for a new work item to be added to an existing contract with National Steel and Shipbuilding Company (NASSCO) for the USS MAKIN ISLAND (LHD 8) Fiscal Year 2023 Selected Restricted Availability (SRA).

The new work item, 512-11-008, is to repair a vaneaxial fan on the ship. The estimated value of this work is $77,296.89, and it will be funded by Fiscal Year 2023 Operations and Maintenance, Navy (OPN) funds. The work must be completed within the window of the USS MAKIN ISLAND FY23 SRA, which starts on . NASSCO is the sole source for this work, as they are uniquely positioned to perform the repairs during the ship's maintenance availability without impacting the completion schedule. The Government and NASSCO intend to negotiate the pricing for this new work item to ensure a fair and reasonable cost.

View the file

Other files

File Type Posted
11N_JA_Approved_Redacted.pdf PDF
6N_JA_Approved_Redacted.pdf PDF
20N_JA_Approved_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J&A Number:

N55236230085

DEPARTMENT OF THE NAVY

SOUTHWEST REGIONAL MAINTENANCE CENTER

3755 BRINSER ST STE 1

SAN DIEGO, CA 92136-5299

Code 430A Contract Number: N00024-23-C-4407 Date: 15 August 2023

JUSTIFICATION AND APPROVAL

FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION

1. CONTRACTING ACTIVITY

The Naval Sea Systems Command, Southwest Regional Maintenance Center (N55236), Contracting Department Code 430A, 3755 Brinser Street, Suite #1, San Diego, CA 92136-5299. Contracting ACO:

Jonathon Mata, jonathon.mata@navy.mil

2. DESCRIPTION OF THE ACTION BEING APPROVED:

Sole source contract action is to add one (1) New Work Item at a Firm Fixed Price to National Steel and Shipbuilding Company (NASSCO) under N00024-23-C-4404, USS MAKIN ISLAND (LHD 8) Fiscal Year 2023 (FY23) Selected Restricted Availability (SRA).

Work Item to be incorporated:

512-11-008; Vaneaxiel Fan; repair

3. DESCRIPTION OF SUPPLIES/SERVICES:

a. New Work Item 512-11-008; Vaneaxial Fan; repair

b. Total Estimated Value: $77,296.89. Funding will be FY23 OPN

c. The window of opportunity to accomplish the work is . The USS MAKIN ISLAND FY23 SRA start of the availability is d.

technical and requirements personnel.

4. STATUTORY AUTHORITY PERMITTING OTHER THAN FULL AND OPEN

COMPETITION

The statutory authority permitting other than full and open competition is 10 U.S.C. 3204 (b)(B) as implemented by the Federal Acquisition Regulation (FAR) 6.302-1 this authority applies in those situations where the supplies or services required by the agency are available from only one responsible source, or, from only one or a limited number of responsible sources, and no other type of supplies or services will satisfy agency requirements, full and open competition need not be provided for. This availability is the last opportunity to complete this upgrade prior to deployment and this work is needed to fulfill required operational capability.

5. RATIONALE JUSTIFYING USE OF CITED STATUTORY AUTHORITY.

Request for Contractor Change (RCC) 4N was issued to correct Departure from Specification (DFS) currently in place and repair Vaneaxial Fan. After 100% (SF) discovered that the well deck/lower vehicle deck ventilation exhaust fan (E1-63-1) seized during operation. The fan and motor involved in the repair is 1 of 6 exhaust fans required for well deck ventilation and requires depot level of repair. SF performed a temporary repair on the exhaust fan with an approved DFS, set to expire . RCC 4N is written to repair Vaneaxial Fan and permanently correct the temporary minor non-conformance in place. This work item requires the contractor remove and install new fans and accomplish operational testing of new and disturbed ventilation system.

This work should not impact operational schedule or future execution key events. However, without this work, the DFS will expire and the existing internal surface wear will likely cause further erosion to the point where further repairs will need to be conducted, as well as, a reduction of the movement of fumes from lower well deck space resulting in a requirement of more time to vent fumes when vehicles are operating. Therefore, the repair is best suited to be accomplished during this window of opportunity.

RCC 4N was issued to the Contractor for pricing on . NASSCO submitted a Change Order Pricing Analysis (COPA) for The Government and NASSCO intend to negotiate this RCC, and the SWRMC ACO intends to settle this new work at a fair and ensure the Contractor invokes the installation through the end date of this availability.

6. DESCRIPTION OF EFFORTS MADE TO SOLICIT OFFERS FROM AS MANY

OFFERORS AS PRACTICABLE:

The original contract was awarded competitively in which NASSCO was the selected awardee.

During this window of maintenance no other source can without a significant impact to the availability completion schedule. The potential negative impact to the existing availability schedule associated with open competition of the RCC largely stems from the extensive period of time required to support open competition of the work. If competition is not limited, the requirement would have to be solicited for 30 days and would require up to 30 days to award.

An impact to the availability completion schedule would pose a serious risk to mission readiness. It also poses a risk for financial injury to the Government due to additional costs with the duplication of support services such as the Project Management Office (PMO) and temporary services. NASSCO is uniquely positioned to perform the work on the ship , and it is impracticable for another company to perform these support services.

7. DETERMINATION OF FAIR AND REASONABLE COST:

The Contracting Officer has determined that the anticipated cost to the Government of this acquisition will be fair and reasonable based on cost and price analysis to be conducted pursuant to FAR Part 15.

In addition, technical analysis will be performed with the Project Manager to ensure the proposed labor hours, material cost, and subcontractor cost correspond with the expected cost or Independent

Upon the basis of the above justification, I hereby approve, as Contracting Officer, the solicitation of the proposed procurement(s) described herein using other than full and open competition, pursuant to the authority of 10 U.S.C. 2304(c)(1).

ADMINISTRATIVE CONTRACTING OFFICER

Jonathon Mata, Administrative Contracting Officer, SWRMC C430A

(619) 726-1580

File details come from the government source that posted it. Updated .