This specification package describes preservation work requirements for the USCG ANT DULUTH (49423) fiscal year 2024 unplanned industrial repair availability. The specification covers preservation of the underwater body on the 49-foot buoy utility stern loading boat, requiring removal of the existing coating system and application of a new anticorrosive epoxy undercoating and antifouling topcoat system. The contractor must accomplish pre-surface preparation washing, surface preparation by water jetting or abrasive blasting, and coating application in accordance with SFLC Standard Specification 6310. The contractor must also install protective measures, address known interferences, and inspect draft marks. The work will be conducted at a Coast Guard facility, with the Coast Guard hauling and blocking the boat.

View the file

Other files

File Type Posted
49423 PPQ.pdf PDF
70Z04024QSBPL0008.pdf PDF
49423 Schedule of Supplies and Services.pdf PDF
49423_FAR 52.212-2 Language for Solicitations REVISED.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCG 49423 (BUSL 49)

USCG ANT DULUTH

SPECIFICATION FOR UNPLANNED DRYDOCK REPAIRS

FY2024

Developed By: Kalee J Campbell

(Rev-0, 23 June 2023)

USCG 49423 (BUSL-49) UNPLANNED AVAILABILITY FY2024

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: U/W Body, Preserve, 100 percent WORK ITEM 2: Hull Plating Freeboard, Preserve, 100 Percent WORK ITEM 3: Stern Tube Interior Surfaces, Preserve, 100 Percent WORK ITEM 4: Deck (Foredeck), Preserve 100% WORK ITEM 5: Hull Identification Markings, Apply WORK ITEM 6: Decks – Exterior (Buoy), Preserve 100 Percent WORK ITEM 7: A-Frame, Preserve 100 Percent WORK ITEM 8: Work Shelter, Temporary, Provide WORK ITEM 9: Anchor Chain Hawse Pipe, Preserve iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 49A BUSL 114-004, Rev G, Skeg & Shaft Tube Arrangement & Details

Coast Guard Drawing 49A BUSL 171-002, Rev G, Mast Construction and Details

Coast Guard Drawing 49A BUSL 243-001, Rev G, Propulsion Shafting & Bearing Arrangement

Coast Guard Drawing 49A BUSL 573-005, Rev E, Stern A-Frame Construction & Details

Coast Guard Drawing 49A BUSL 573-006, Rev E, Removable Base for A-Frame

Coast Guard Drawing 49A BUSL 581-002, Rev D, Anchor Handling Details

Coast Guard Drawing 49A BUSL 601- 003, Rev E, Outboard Profile and Main Deck

Coast Guard Drawing 49A BUSL 601-003, Rev E, Outboard Profile & Main Deck Arrangement

Coast Guard Drawing 49A BUSL 601-003, Rev E, Outboard Profile and Main Deck Arrangement

Coast Guard Drawing 49A BUSL 602-001, Rev C, Hull LBL Plates/Marks

Coast Guard Drawing 49A BUSL 631- 001, Rev F, Painting Schedule

Coast Guard Drawing 49A BUSL 634- 001, Rev C, Deck Covering Schedule

Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem

Coast Guard Fleet Drawing FL 2804-22, Rev A, Consolidated Visual ID for Cutters

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Commandant Instruction (COMDTINST) M16114.22, October 2002, 49ft. Buoy Utility Stern Loading (BUSL) Boat Operators Handbook

Fire Prevention and Response

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems v (Rev-0)

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary Services

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment

MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power-Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC), Surface Preparation Standard SSPC-SP 1, November 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Metal Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, July 2012, Near-White Blast Cleaning vi (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

This section is not applicable to this package.

vii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item

Title

1 U/W Body, Preserve, 100 percent viii (Rev-0)

PRINCIPAL CHARACTERISTICS

49’ BUSL

PHYSICAL

Length overall 49’ 7” Depth (main deck at side to baseline) N/A Maximum beam 16’ 10” Height of highest projection (above

DWL)

15’

Frame spacing N/A Full load draft 5’ 7” Full load displacement 31.65 Long tons Shore tie voltage requirements 120v

HULL

Hull material

MACHINERY

Number of propellers 2 Number of blades per propeller 4 Diameter of propeller 31” Pitch 22” fixed

RPM 2300

Shaft diameter N/A

TANKS

1 (Rev-0)

00000_0522_FLT

REC_00000_FLT_Boats @ CG Facility (0121)

General Requirements

1. SCOPE

1.1 1.1 Intent. This standard specification invokes general requirements for conducting boat repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

3 COAST GUARD DRAWINGS

None

4 COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface

Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

5 OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.1.1 NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents. Contractors can apply to NAVSEA headquarters directly for copies.

3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec

6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC

Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is .

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3 (Rev-0)

3.5.2 Test and procedures. The Contractor must be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor must be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, and must be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For

Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Hazardous Waste Manifest. The Contractor must be aware of the following:

3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the

Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.

3.5.7 Facilities Response Plans. Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. The Contractor must refer to site (e.g. Base) Regulations and Instructions for details regarding local policies (e.g. crane services, parking, or facility usage).

4 (Rev-0)

3.6.1 Coast Guard facility usage and provisions. The Contractor must be aware of the following:

5 (Rev-0)

3.6.1.1 Coast Guard personnel will haul and block the boat on a Coast Guard installation; consequently, the Contractor must not include the cost of lifting or re-floating the vessel in the bid price estimates

3.6.1.2 All work described herein is intended to be accomplished at this location.

3.6.1.3 The COR will submit to the Contractor a copy of the “Coast Guard Facility Survey”/”Landlord Survey” which contains utilities and/or equipment that the Coast Guard Facility will make available for use by the Contractor.

3.6.2 Contractor equipment. The Contractor must make arrangements to provide all other necessary equipment to accomplish the work described in this specification package including (as applicable) but not limited to generators, compressors, welding equipment, power tools, consumables, and storage containers.

3.6.2.1 The Contractor must be responsible for storing own equipment.

3.6.2.2 Prior to setting up equipment and/or storage containers for long-term duration, the Contractor must obtain approval from the COR at least 48 hours prior to placing the equipment in order to avoid conflict with other base activities.

3.6.3 Sewage Facilities. If the Coast Guard facility opts to provide sewage facilities (as listed on the Landlord

Survey) for use by the Contractor, the Contractor must supply sanitary supplies such as toilet paper, paper towels, soap, etc. for use by contract personnel. Use of Government toilet paper, and other sanitary supplies must not be authorized and the additional caveats apply as well.

3.6.3.1 The Contractor must ensure the sanitary facilities (bathrooms) are left in a clean and neat condition as found.

3.6.3.2 The Contractor is NOT authorized to use any shower facilities which may or may not be located in the same room as the toilet facilities.

3.6.3.3 The Contractor must adhere to any special requirements or regulations listed in the comments section of the Landlord survey forms, provided at the end of this document.

3.6.4 Coast Guard turn-over preparation. The Contractor must be aware that, upon arrival, after haul out, and prior to departing the Contractor’s facility, the Coast Guard crew must be allowed to accomplish various tasks in preparation for the turn-over of the boat to the Contractor. The following conditions apply to this paragraph:

3.6.4.1 The Coast Guard requires a maximum of three days at the beginning of the contract, and three days at the end to accomplish various tasks.

3.6.4.2 The Contractor may commence/continue work during these time frames.

3.6.4.3 Coast Guard personnel will disconnect the Detroit Diesel Electronic Control (DDEC) System and any other electronic equipment, as required to avoid damage to systems arising from hotwork on the vessel during the availability.

3.6.4.4 Coast Guard personnel will remove the transducers after initial haul-out and reinstall prior to re-floating the vessel.

6 (Rev-0)

3.6.4.5 The Unit will contact the servicing ESD or ESU to setup removal/installation of the transducer if Unit personnel are unable to accomplish this task.

7 (Rev-0)

3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 8636. Add missing paragraphs between 3.2 and 3.5 of Std Spec 8636 as follows:

“3.3 Access cut boundaries. The Contractor shall ensure that access cuts comply with the requirements and restrictions detailed in the following and in SFLC Std Spec 0740, and referenced codes.

5.3.1 Location of boundaries. Boundaries of access cuts and closure plates shall, in general, be located between principal ship framing, bulkheads, and other structural members and shall be at least three inches from any of these members or from the toes of other welds. A reduction in this three inch minimum may be approved by the KO on a case by case basis provided sufficient clearance is maintained for welding and inspection requirements.

The boundaries of access cuts and closure plates should land on existing butts or seams, wherever practicable. The boundaries of prior access cuts should be utilized wherever possible. Boundaries may extend across one or more frames as required for the size of the opening.

5.3.2 Access hole dimensions and arrangements. Holes or access cuts shall be the minimum size necessary and shall be in accordance with the following:

Rectangular access cuts and closure plates welded into primary hull structure shall be at least 12 inches wide in the lesser dimension.

For circular access cuts, the minimum diameter shall be 4T, where T = thickness of the involved structural member, but not less than three inches.

Circular closure plates for access cuts less than two feet in diameter shall be dished 1/16 to 1/8 inch to allow for shrinkage when welded.

Corners of rectangular access cuts and closure plates shall have a minimum radius of 6 inches except when a boundary lands on an existing hull longitudinal seam or transverse butt weld.

Corners at an existing seam or butt shall intersect at a 90 degree angle.

Cuts that are to cross existing butts or seams shall do so at an angle of 90 degrees plus or minus 15 degrees.

In primary hull structure, existing welds forming the boundary of a cut shall be cut back 3 inches beyond the toe of the access cut, except that the cut back shall not intersect or cross an existing weld, frame, or structural member. In which case, the cut back may be reduced to a minimum of two inches in length.

Existing welds crossed by the cut shall not be cut back.

5.3.3 Primary hull structure. Primary Hull Structure includes the shell, main strength decks, principal longitudinal bulkheads, vertical keel, deep web girders and stiffeners designed to withstand the ship bending stress.

5.3.4 Mechanically fastened joints. Welding closer than six inches to a mechanically fastened joint should be avoided. When access cuts cross or come within six inches of a mechanically fastened joint, the fasteners shall be checked for tightness and if necessary, loose fasteners shall be seal welded or removed, and replaced for a distance of 6 inches beyond the edge of the cut. When a cut crosses a mechanically fastened seam the cut plates shall be repaired using single V welds backed with glass tape (MIL-C-20079) to prevent fusion between the mechanically fastened plates.

8 (Rev-0)

3.4 Ship integrity maintenance. The Contractor shall maintain safety and ship integrity by installing temporary guarding and coaming, in addition to weathertight and watertight closures. Remove these temporary fabrications

9 (Rev-0)

NOTE

NAVSEA S0600-AA-PRO-160/CH16 provides requirements for design, fabrication, and installation of temporary watertight closures.”

after closing the hull access, and grind surfaces flush in way of removals. For shell plating cuts made at or below the waterline where temporary closures are impractical, the Contractor shall secure each vulnerable compartment and subdivision to minimize potential damage to the extent permitted by the scope and urgency of the work.

3.4.1 Guarding. Install temporary guards in accordance with 29 CFR 1915.73.

3.4.2 Coaming. Ensure that in areas where flammable liquids may be stored, a 4 inch high metal coaming shall be installed on the surface of the deck with tack welds and fully sealed with caulking compound. The coaming shall encircle the access cut in the deck.

3.4.3 Weathertight and contamination closures. Fabricate temporary closures, using fire retardant material, before cutting access openings and install closures whenever access is not in use. Closures shall be:

Constructed to protect the access from inclement weather and entry of contaminants (shall include a coaming or dam on the deck to redirect rain runoff away from the opening).

Fitted with fasteners that permit rapid installation and removal.

Able to support a minimum of 150 pounds per square foot for horizontal deck closures.

Where the access opening is in way of a removed hatch, scuttle or door, the closure shall be configured to allow normal passage of ship’s personnel and equipment.

3.4.4 Watertight closures. Ensure that access openings created four feet or less above the maximum anticipated waterline shall include temporary watertight closures when the vessel is waterborne.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

10 (Rev-0)

63130_0523_FLT

REC_63130_100Percent_FLT_49’ BUSL (0523)

WORK ITEM 1: U/W Body, Preserve, 100 percent

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve U/W body surfaces.

NOTES

1. The purpose of the preservation tasks covered by this item is to completely remove all existing coatings and recoat the U/W body surfaces with a new coating system.

2. U/W body surfaces are as defined in 4.1 (Definitions) and exclude areas covered by docking blocks unless the vessel is fleeted for the express purpose of preserving blocked areas.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 49A BUSL 601-003, Rev E, Outboard Profile and Main Deck Arrangement

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning

11 (Rev-0)

3.1 General.

3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):

3.2.3 Post-surface preparation cleaning and inspection

3.1.2 Tech Rep. The Contractor must refer to SFLC Std Spec 0000, paragraphs 3.2.4.2.1 (Painting contractor certification program requirement) and 3.2.4.2.2 (Coating Tech Rep), for applicable requirements.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection) to the following components, spaces and equipment:

All scuppers and overboard discharges.

Waterline area where U/W body coating system interfaces with freeboard coating system (unless freeboard surfaces are also being preserved).

Fathometer transducer surfaces.

Sea valve openings.

Propeller shaft bearings and seals.

Rudder bearings.

Propellers.

Zinc anodes (unless anodes are being renewed).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Sea chest grating.

3.1.5 Initial inspection. Prior to removing the existing coating system, the Contractor must inspect and verify whether all draft marks have permanent markings (weld beads or impressions), showing their location on the hull. Submit a CFR.

3.1.6 Water used in preparation and washing procedures. The Contractor must ensure that water used in all surface preparation tasks, including pre-surface preparation wash and water jetting, is of sufficient purity and quality that it does not prevent the surface being cleaned from achieving the required degree of surface cleanliness or non-visible contamination criteria.

3.1.6.1 Ensure that surface preparation water does not contain sediments or other impurities that are destructive to the proper functioning of the cleaning equipment.

12 (Rev-0)

3.1.6.2 Ensure that all water used in any surface preparation or cleaning procedures is captured, contained, and all spent water disposed of in accordance with all Federal, state and local regulations.

3.1.7 Surface preparation optional methods. The Contractor has the option of using either high/ultrahigh pressure water jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system specified in 3.2 (Preservation requirements). The Contractor may add abrasives to the water jet stream, for one or both of the following reasons:

Achieving greater productivity.

Achieving the required surface profile.

NOTES

1. Existing coating system on the U/W body surfaces may have a nominal thickness in excess of that which was originally installed, because of “patch-coats” applied during past drydock availabilities.

2. Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.

3. Whenever fleeting is required for any reason, if the U/W Body has not yet been fully preserved, the areas adjacent to all docking blocks must be fully preserved at least 2 feet in each direction prior to refloating the vessel. If the vessel will be placed onto a different blocking position, the areas in way of the new blocking position must be fully preserved.

3.2 Preservation requirements. The Contractor must accomplish the following tasks:

3.2.1 Pre-surface preparation wash. Accomplish low-pressure (less than 5,000 psi) freshwater wash of all affected surfaces, to remove soluble chlorides and other surface contaminants. Refer to SSPC-SP 1, for guidance.

3.2.2 Surface preparation and coating application.

The Contractor must accomplish the following tasks:

3.2.2.1 Prepare and coat the U/W hull surfaces with the system specified for “Underwater (U/W) Body and Boot-Top (U/W Body and Boot-Top, Steel Hulls (Up to 7 Years), in Salt Water”, in SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems). Ensure that the anticorrosive (AC) is tacky prior to applying the first antifouling (AF) top-coat.

3.2.2.2 Ensure that the first AF coat is applied over the AC epoxy undercoating, while it is still tacky.

3.2.2.1 Prepare and coat the U/W hull surfaces with the system specified for “Underwater (U/W) Body and Boot-Top (U/W Body and Boot-Top, Icebreaker <235’, in Fresh Water (Excluding Sea Chest)” in SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems).

3.2.2.2 Sea chest. Prepare and coat the sea chests with the system specified for “Underwater (U/W) Body and Boot-Top (U/W Body Sea Chest, Icebreaker in Fresh Water)”, in SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems).

13 (Rev-0)

3.2.2.1 Prepare and coat the U/W hull surfaces with the system specified for “Underwater (U/W) Body and Boot-Top, Ice Breaking Capable Vessels <235’, in Salt Water” in SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems). Ensure that the anticorrosive (AC) is tacky prior to applying the first antifouling (AF) top-coat.

3.2.2.2 Ensure that the first AF coat is applied over the AC epoxy undercoating, while it is still tacky.

3.2.3 Post-surface preparation cleaning and inspection. After completion of surface preparation and prior to coating application, accomplish the following tasks and submit a CIR.

3.2.3.1 Perform a visual inspection of the prepared U/W body steel substrate.

NOTE

Lists of all authorized coating materials and suppliers are listed in SFLC Std Spec 6310, Appendix C (Cutter and Boat Authorized Coatings).

3.2.3.2 Perform solvent cleaning of all prepared surfaces, in accordance with SSPC-SP 1. Capture, contain, and dispose of all wastes from solvent cleaning, in accordance with all Federal, state and local regulations..

3.3 Draft mark painting. The Contractor must paint all draft marks with two coats of a “Polysiloxane” or “Silicone Alkyd Enamel” coating, at 2.0-3.0 mils DFT, white (17925).

3.4 In-process quality control. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces). Surfaces being preserved are considered “critical-coated surfaces”.

4. NOTES

4.1 Definitions.

4.1.1 U/W Body. The underwater body is defined as the areas from the bottom of the keel to the waterline, as shown on Coast Guard Drawing 49A BUSL 601-003, including rudders, transducer hull rings, keel coolers, bilge keels, struts, skegs, gratings, and rope guards.

14 (Rev-0)

63140_ESD_0822_FLT

REC_63140_100Prcnt_FLT_49’ BUSL (ALL) (0822)

WORK ITEM 2: Hull Plating Freeboard, Preserve, 100 Percent

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve 100% of the freeboard surfaces defined in 4.1 Definition of freeboard surfaces.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 49A BUSL 601-003, Rev E, Outboard Profile & Main Deck Arrangement

Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem

Coast Guard Fleet Drawing FL 2804-22, Rev A, Consolidated Visual ID for Cutters

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

15 (Rev-0)

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection) and to the following specific components, spaces and equipment:

Areas where underwater body coating system interfaces with freeboard coating system (unless u/w body surfaces are also being preserved).

Adjacent deck surfaces and deck fittings.

Wood fenders.

Buoy Deck wood covering.

Port and starboard deck lockers.

Deck equipment.

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

None.

3.2 Initial inspection. Prior to removing the existing coating system, the Contractor must inspect and verify whether or not all hull identification numbers and letters have permanent markings (weld beads or impressions), showing their location on the hull. Submit a CFR.

3.3 Pre-surface preparation wash. The Contractor must accomplish low-pressure (less than 5,000 psi) fresh water wash of all affected surfaces, to remove soluble chlorides and other surface contaminants.

Capture, contain, and dispose of wash water for proper disposal in accordance with all Federal, state and local regulations.

3.4 Surface preparation optional methods. The Contractor must have the option of using either high/ultrahigh pressure water Jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system specified in 3.6 (Preservation requirements). The Contractor may add abrasives to the waterjet stream, for one or both of the following reasons:

Achieving greater productivity.

Achieving the required surface profile.

NOTE

Waterjetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.

3.5 Substrate inspection. After completing surface preparation and before coating application, the Contractor must perform a visual inspection of the prepared substrate, and submit a CFR.

3.6 Preservation requirements. The Contractor must accomplish the following tasks:

3.6.1 System particulars. Prepare and coat 100% of the freeboard surfaces as designated in paragraph 1.1 (Intent) with the system specified for “Freeboard/Superstructure/Mast (Freeboard/Superstructure)” in SFLC Std Spec 6310. Select the following:

Select “Option I” system, for the applicable metal substrate.

Select “Option II” system, for the applicable metal substrate.

16 (Rev-0)

Black (17038) as the top/finish coat color for all plating surfaces and stern rails and stanchions.

White (17925) for all port and starboard rails and stanchions..

3.6.2 Visual identification markings. The Contractor must paint all distinctive visual safety and identification markings as follows:

3.6.2.1 Decals. Coast Guard Emblem decals may be substituted for painted emblems. Vinyl adhesive letters and numbers may also be substituted for painted letters and numbers - at the Contractor’s discretion.

3.6.2.2 Painted markings. Paint all distinctive visual identification markings, including the Coast Guard diagonal stripes, "U.S. COAST GUARD" legends, hull numbers, and draft marks in accordance with SFLC Std Spec 6310, and Coast Guard Drawings FL 2804-12 and FL 2804-22 as applicable.

NOTES

Surfaces being preserved are considered “critical-coated surfaces”.

Although there may be several possible procurement sources for the Coast Guard Emblem decals and vinyl adhesive letters and numbers, one known source is:

Brace Enterprises 10250 SE 138 Terrace Dunnellon, FL 34431

352-489-4442 / Fax: 352-489-4476 www.braceenterprise.com

3.6.3 Tear drop. Not applicable.

3.7 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).

4. NOTES

4.1 Definition of freeboard surfaces. For the purposes of this item the freeboard is defined as exterior steel hull surfaces from the waterline to the top of the gunwale; also included are the port, starboard, and stern steel rails and stanchions, shown on Coast Guard Drawing 49A BUSL 601-003.

17 (Rev-0)

63133_JCS_1121_FLT

REC_63133_FLT_49’ BUSL (ALL) (0819)

WORK ITEM 3: Stern Tube Interior Surfaces, Preserve, 100 Percent

WORK ITEM 1: SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve stern tube interior surfaces.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 49A BUSL 114-004, Rev G, Skeg & Shaft Tube Arrangement & Details

Coast Guard Drawing 49A BUSL 243-001, Rev G, Propulsion Shafting & Bearing Arrangement

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

OTHER REFERENCES

MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Metal Blast Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power-Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating

18 (Rev-0)

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection) and to the following specific components, spaces and equipment:

Stern tube flange surfaces.

Engine Room.

Bearings and bearing housings.

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Propellers.

Line cutters (if applicable).

Shaft zincs (if applicable).

Shaft seal assembly.

Drive-saver.

3.2 Preservation requirements. Using Coast Guard drawings 49A BUSL 114-004 and 49A BUSL 243-001 as guidance, the Contractor must preserve 100% of the interior tube surfaces as follows:

3.2.1 The Contractor must not prepare or coat waterborne bearing contact areas inside the stern tube. This includes bearing lands, areas in contact with bearing shell, areas in contact with Cutless type bearings, etc.

These areas must remain uncoated to provide required fits.

3.2.2 Surface preparation. The Contractor must prepare surfaces by waterjetting to a SSPC-SP 12/NACE No. 5, WJ-2/L standard, or by one or a combination of the surface preparation methods described in Table 1:

TABLE 1 – SURFACE PREPARATION

ABRASIVE BLASTING MECHANICAL CLEANING

19 (Rev-0)

Abrasive-blasting to SSPC-SP10/NACE No. 2, using grit conforming to MIL-A-22262 (1.5 to 2.5 mil anchor profile).

Used reference MIL-A-22262, Mar 1996, Abrasive

Blasting Media Ship Hull Blast Cleaning for guidence

Power tool cleaning to a SSPC-SP 11 (1.0 mil anchor profile).

3.3 Inspection. After surface preparation and before coating application, the Contractor must perform a visual inspection of the prepared stern tube surfaces, and submit a CFR.

3.4 Surface coating. The Contractor must prime and coat the prepared surfaces with two coats of a “High Turbulence Coating”, at 5.0-6.0 mils DFT each. Used reference MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull for guidance.

NOTE

List of authorized suppliers for “High Turbulence Coatings” is provided in SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.5 In-process quality control. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces").

NOTE

Surfaces being preserved are considered “critical-coated surfaces”.

This section is not applicable to this work item.

20 (Rev-0)

63100_AKP_0423_49BUSL

WORK ITEM 4: Deck (Foredeck), Preserve 100%

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve the foredeck.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 49A BUSL 601- 003, Rev E, Outboard Profile and Main Deck

Coast Guard Drawing 49A BUSL 631- 001, Rev F, Painting Schedule

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

None.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

21 (Rev-0)

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Coating System. The Contractor must preserve the foredeck, from frame 5, port and starboard, to the forward most part of the deck which is forward of the forepeak access hatch in accordance with Coast Guard Drawings 49A BUSL 601- 003, 631-001, SFLC Std Spec 0000 and SFLC Std Spec 6310.

NOTE

1. Inorganic zinc paints cause metal fume fever when cut or burned with a torch.

2. Do not apply inorganic zinc to water-jetted surfaces.

3. A mist coat is 1.0-2.0 mils (wet film thickness) of paint applied to promote adhesion or compatibility between unlike materials for spray applications only.

4. For broadcast grit non-skid systems, spread #8-16 Garnet or MIL-A-22262 Inert Abrasive Grit over the last polysiloxane or epoxy coat when wet. Let it dry for 8 hours and sweep off the excess. Then apply polysiloxane or MIL- PRF-24635 Silicone Alkyd Enamel topcoat.

5. The Polysiloxane System must be used for all new construction. The silicone alkyd system should only be selected for maintaining an existing silicone alkyd system or as a lower cost option when superior performance is not a requirement.

4.1 Related Work Item. Decks – Exterior (Buoy), Preserve 100 Percent

22 (Rev-0)

63100_AKP_0423_49BUSL

WORK ITEM 5: Hull Identification Markings, Apply

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to apply the hull identification markings selected in Table 1.

NOTE

Hull Identification Markings possible avenues of availability are through Federal Prison Industries (817) 413-3206, or Brace Enterprises (954) 723- 0435.

TABLE 1 – HULL IDENTIFICATION MARKINGS

SELECT ITEM DESCRIPTION SPACE QTY

USCG LOGO

Bow fwd Port & Stbd side

2 ea.

HULL NUMBERS

Bow fwd Port & Stbd side

2 ea.

HULL NUMBERS Stern 1 ea.

“U.S. COAST GUARD” LEGENDS Port & Stbd side 2 ea.

1.2 Government-furnished property.

None.2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 49A BUSL 602-001, Rev C, Hull LBL Plates/Marks

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

23 (Rev-0)

3.1.1 CIR.

None.

3.1.2 Tech Rep.

None.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Remove existing markings. The Contractor must remove the existing letters, symbols or stripes selected in Table 1, in accordance with Coast Guard Drawing 49A BUSL 602-001, SFLC Std Spec 0000 and SFLC Std Spec 6310.

3.3 Apply new markings. The contractor must renew the hull identification markings selected in Table 1, in accordance with Coast Guard Drawing 49A BUSL 602-001 and SFLC Std Spec 6310.

4. NOTES

4.1 Marking location. The markings described in this work item are found on the freeboard area of the hull.

24 (Rev-0)

63121_AKP_0423_49BUSL

WORK ITEM 6: Decks – Exterior (Buoy), Preserve 100 Percent

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve the buoy deck surfaces and apply slip resistant (non-skid) pads.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 49A BUSL 631- 001, Rev F, Painting Schedule

Coast Guard Drawing 49A BUSL 634- 001, Rev C, Deck Covering Schedule

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

The Society for Protective Coatings (SSPC), Surface Preparation Standard SSPC-SP 1, November 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, July 2012, Near-White Blast Cleaning

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

25 (Rev-0)

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Buoy Handling A-Frame(s)

Aton Box(s)

Work Bench(s)

Winch(s)

Access Hatch(s)

Chain Stopper

NOTE

Surfaces being preserved are considered “critical-coated surfaces”.

3.2 Preservation. The Contractor must preserve the buoy deck surfaces and apply slip resistant (non-skid) pads in accordance with Coast Guard Drawings 49A BUSL 631- 001, 634- 001, SFLC Std Spec 0000 and SFLC Std Spec 6310. Accomplish the following tasks:

3.2.1 Pre-surface preparation wash. Accomplish low-pressure (less than 5,000 psi) freshwater wash of all affected surfaces, to remove soluble chlorides and other surface contaminants. Refer to SSPC-SP 10, for guidance.

3.2.2 Surface preparation. The Contractor must prepare the deck surfaces in accordance with the surface preparation method listed in Table 1- Paint Schedule 49 BUSL.

3.2.3 Clean and inspect. Upon completion of surface preparation and prior to coating application the Contractor must clean and inspect the prepared buoy deck steel substrate. Submit a CFR.

3.2.3.1 The Contractor must perform a visual inspection of the prepared buoy deck steel substrate.

3.2.3.2 The Contractor must solvent clean the prepared surfaces in accordance with SSPC-SP 1. Capture, contain, and dispose of all wastes from solvent cleaning, in accordance with all Federal, state and local regulations.

3.2.4 Surface preservation. The Contractor must preserve the deck surfaces in accordance with the coating systems listed in Table 1- Paint Schedule 49 BUSL, using Contractor provided material.

NOTE

The safety markings are alternating yellow and black stripes at 45 degrees to the bulwark for a distance of two feet.

TABLE 1- PAINT SCHEDULE 49 BUSL (REF DWG 49 A BUSL 631-001)

EXTERIOR SURFACES

TO BE PRESERVED

SURFACE

PREPARATION

COATING

SYSTEM

DFT

(MILS)

COLOR

26 (Rev-0)

WORK DECK

*Starting 16 inches forward of FR 04 then aft to the stern*

**With Safety Markings – Marking start at a point 24 inches forward of the chain stopper then aft to the stern**

SSPC-SP 10/NACE NO. 2

using grit conforming to

MIL-A-22262 / (1.5-2.5)

1) Inorganic Zinc

Safety Markings on Inorganic Zinc Buoy Deck:

1) Polysiloxane

2) Polysiloxane

- or –

1) High Build Epoxy

2) High Build Epoxy

3) MIL-PRF-

24635 Silicone Alkyd, Type II, Cl. 1

3.0-4.0

Mist Coat 5.0-6.0

Mist Coat 5.0-6.0 2.0-3.0

Gray or (Gray - Green is acceptable)

Safety Markings, Alternating Stripes

– (Yellow 13538, Black 17038)

WORK DECK

**Starting 16…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .