4860_Addendum_One_FINAL.pdf

PDF 324 KB Posted

Attached to
Invitation for Bid - City of Chandler Public Housing Kitchen Cabinet Replacement AMP 1 ; HO5-910-4860
Solicitation number
BPM006630
Issued by
Maricopa County, Arizona

About this file

This Addendum #1, issued November 8, 2024, by the City of Chandler, Arizona, modifies the Invitation for Bid (IFB) HO5-910-4860 for Public Housing Kitchen Cabinet Replacement in AMP 1. The addendum clarifies operational requirements and provides unit-specific floorplans for the project. The solicitation addresses kitchen cabinet replacement across multiple public housing units, with the original bid deadline established as November 21, 2024. The addendum includes floorplans for five distinct unit configurations: Units 9, 12, 19, 22, and 29; Unit 23; Units 10, 11, 13, 14, 15, 16, 20, 21, 25, 28, and 30; Units 1, 3, 5, and 7; and Units 2, 6, and 8, providing contractors with existing layout references for project planning.

The addendum establishes two critical operational requirements for contractors: units must remain occupied during construction, and contractors are required to leave operational, running sinks available for residents at the end of each workday. Additionally, the addendum addresses unforeseen circumstances, specifically requiring that if galvanized pipe replacement is discovered and deemed necessary, the contractor must provide a quote to the Contract Administrator for review and approval prior to proceeding with such work. The Procurement Officer for this solicitation is Raquel McMahon, who can be contacted at raquel.mcmahon@chandleraz.gov for inquiries or clarifications regarding the project requirements.

View the file

Other files

File Type Posted
4860_Public_Housing_Cabinet_Replacement_IFB_FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 8, 2024

PUBLIC HOUSING KITCHEN CABINET REPLACEMENT-AMP 1

Solicitation # HO5-910-4860

Addendum #1

The IFB (HO5-910-4860) is amended by the addition of the following provisions. If any provision in this Addendum conflicts with any existing provisions in the IFB, the Provisions of this addendum control. All other provisions in this Addendum remain effective as previously published.

SOLICITATION CHANGES/CLARIFICATIONS

Operating Sinks: The units are occupied, contractor is required to leave an operational, running sink for residents at the end of each workday.

Galvanized Pipe: In the event a unit is found to have unforeseen galvanized pipe that must be replaced, and the work is deemed an unforeseen circumstance, the contractor will provide a quote to the Contract

Administrator to review and approve.

FLOORPLANS

Attached are floorplans of the units showing existing layouts, these are not to scale.

End of Addendum.

Raquel McMahon

Procurement Officer

Email: raquel.mcmahon@chandleraz.gov mailto:raquel.mcmahon@chandleraz.gov

UNITS 9, 12, 19, 22 AND 29

UNIT 23

UNITS 10, 11, 13, 14, 15, 16, 20, 21, 25, 28, 30

UNITS 1, 3, 5, AND 7

UNITS 2, 6 AND 8