This is a Bid Worksheet for acquisition and demolition construction services issued by the North Carolina Department of Public Safety, Division of Emergency Management (NCEM), for Hazard Mitigation Grant Program (HMGP) project 4827-0010 in Polk County. The RFB seeks bids from prequalified vendors to perform acquisition and site demolition work on six properties located in Tyron and Saluda, North Carolina. Properties 1 through 3 are mandatory bid items, while Properties 4, 5, and 6 are optional. Work phases include property acquisition (intake/DOB calculation, appraisal, title research, document preparation, and closing attorney fees) and site demolition (asbestos/lead inspection and remediation, structure demolition, underground storage tank clearance, grading/seeding, and removal of structures such as cabins and septic tanks). Vendors must provide construction management costs and profit/overhead costs for each property. The worksheet requires vendors to specify unit prices, quantities, and units of measure for all line items, with three additional miscellaneous cost rows available per property for any eligible costs beyond standard categories.

Vendors are responsible for completing the bid worksheet in its entirety without modifications to formulas or line items, with noncompliance grounds for proposal rejection. All pricing must be entered in the light blue cells designated for vendor input. Vendors must also provide an overall project timeframe in days from Notice to Proceed through final closeout for all contracted work, which will be used by the state to evaluate bids against HMGP goals and deadlines. The worksheet auto-calculates work phase totals and a grand total across all properties. Vendors are required to verify calculation accuracy and report any errors or concerns to the state immediately using the contact method specified in the RFB. No specific budget amounts, funding sources, or award dates are indicated in this worksheet template.

View the file

Other files

File Type Posted
19-IFB-2239551321-RMT- 4827-0010 Polk Co Acq-Demo.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SUMMARY SHEET

North Carolina Department of Public Safety
Emergency Management
ACQUISITION REQUEST FOR BID WORKSHEET
RFB NUMBER:
VENDOR:
BID DATE:
BID SUMMARY
WORK PHASETOTAL
ACQUISITION$0.00
SITE DEMOLITION$0.00
PROFIT & OVERHEAD$0.00
CONSTRUCTION MANAGEMENT COSTS$0.00
GRAND TOTAL:$0.00

TOTAL PROJECT TIME (DAYS):

NOTES:**Please read the following information carefully**
1) The Vendor shall fill out this Bid Worksheet in its entirety.
2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal.
3) Vendor is responsible for providing information in light blue cells.
4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB.
5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable.
6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet.
7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs).
8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity.
9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines.

REF-SHEET2-DONOTMOVE

*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.

PROPERTY (1)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:3 Wall Road
PROJECT #:10CITY:Tyron
*Structure drifted from original location
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead Remediation$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Septic Tank$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (2)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:3419 Green River Cove Rd
PROJECT #:10CITY:Saluda
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead Remediation$0.00
Structure Demolition$0.00
UST (Propane, 500 Gal.) / Other Clearance$0.00
Grade / Seed$0.00
Misc.Cabin 24'x12'$0.00
Misc.Septic Tank$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (3)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:2863 Green River Cove Rd
PROJECT #:10CITY:Saluda
*Structure washed away
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead Remediation$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Septic Tank$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

Opt. PROPERTY (4)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:2741 Green River Cove Rd
PROJECT #:10CITY:Saluda
*Structure washed away
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead Remediation$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Septic Tank$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

Opt. PROPERTY (5)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:2507 Green River Cove Rd
PROJECT #:10CITY:Saluda
*Structure washed away
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead Remediation$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Septic Tank$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

Opt. PROPERTY (6)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:2848 Green River Cove Rd
PROJECT #:10CITY:Saluda
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead Remediation$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Septic Tank$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00