This document is a Statement of Work (SOW) for the installation of three vehicle restraint systems at the 48th Logistics Readiness Squadron (48 LRS) facility located at Royal Air Force (RAF) Lakenheath in the United Kingdom.
The contractor will be responsible for supplying and installing the vehicle restraint systems, which must meet specific technical requirements outlined in the SOW, as well as removing and disposing of the existing systems. The contractor will also be required to train 48 LRS/LGRDDC personnel on the use and safety features of the new systems. The work is to be performed during normal business hours, Monday through Friday, excluding U.S. federal and U.K. bank holidays. The SOW includes requirements related to contractor business relations, contract management and administration, subcontractor management, security, and shipping instructions. The related federal contract opportunity is Solicitation Number FA558724Q0059 issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA558724Q0059.pdf | ||
| Quote Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
(SOW)
48 LRS/LGRDDC 3x Vehicle Restraint System at
Royal Air Force (RAF) Lakenheath
Rev. 1, 23 February 2024
1.0 Introduction
1.1 Mission: The 48 LRS/Deployment and Distribution Flight incorporates Traffic Management Operations (TMO) of Inbound and Outbound cargo for the 48th Fighter Wing as well as providing the ability to deploy the wing at moments notice. These vital TMO sections require three new vehicle restraint systems to safely load and unload vehicles of a multitude of sizes. The contractor shall supply and install a vehicle restraint system at each bay door (3 total). They will also remove and dispose of the existing ones.
1.2 Background: Bldg 1035 suffered significant damage to the exterior of the building due to lorries backing into the docks and bumping the building. Construction has since been completed, and the restraint system is necessary to signal the drivers when to stop, thus avoiding hitting the building. There are 3 total docks that need this system installed.
1.3 Scope: “The Contractor” will install three vehicle restraint systems to include the training of all 48 LRS/LGRDDC personnel on the equipment and its safety features.
2.0 General Requirements
2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.
2.2 Contract Management & Administration
2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.
2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.
2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.
2.4 Hours of Work: Workdays are from Monday through Friday excluding US federal holidays and UK bank holidays.
Work hours are from 0800 to 1700 local UK time.
3.0 Product Specifications & Delivery Requirements
3.1 The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, safety equipment, any other items, and services necessary to install the three new vehicle restraint systems at Building 1035, 48th Logistics Readiness Squadron located at RAF Lakenheath UK. They will train the work-centers on its use and safety features.
3.2 The contractor shall ensure the supplied restraint system meets the minimum specification requirements listed below:
3.3 Skip or disposal of all items provided by the contractor.
3.4 Removal and disposal of any old restraints.
3.5 820 high buffers at 1.2m
3.6 Open box beam post kit with anchors, joint plates and flat ends
3.7 Items having a galvanized finish
3.8 200mm diameter LED Red and Green traffic light signal with sun visors, 2 per bay.
3.9 An ultrasonic vehicle detector for each bay
1394833386A Highlight
3.10 A traffic signal controller inside a lockable steel enclosure
3.11 Everything in accordance with UK regulations
3.12 12-month warranty
4.0 Special Requirements
4.1 Security & Safety
4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.
4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.
4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.
4.3 Shipping Instructions
4.3.1 For vendors located inside the United Kingdom.
4.3.1.1 Shipment shall be FOB Destination.
4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).
4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
4.3.2 For vendors located outside of the United Kingdom.
4.3.2.1 Option One: United States Postal Service.
4.3.2.1.1 Shipping shall be FOB Destination.
4.3.2.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
1394833386A Highlight
4.3.2.1.3 Weight of individual shipments must not exceed 70lbs.
4.3.2.1.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.
4.3.2.1.5 Hazardous material is not submitted.
4.3.2.1.6 The Government will provide the APO shipping address as part of the solicitation.
4.3.2.2 Option Two: Commercial small parcel carrier.
4.3.2.2.1 Shipping shall be FOB Destination.
4.3.2.2.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.2.3 Weight of individual shipments must not exceed 300lbs.
4.3.2.2.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.
4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.
4.3.2.2.6 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
4.3.2.3 Option Three: Consolidated Shipping Point.
4.3.2.3.1 Shipping shall be FOB Destination.
4.3.2.3.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.3.3 Weight of individual shipments must exceed 300lbs.
4.3.2.3.4 Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).
4.3.2.3.5 Hazardous material may be shipped via this method.
4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR.
4.3.2.3.7 The Contractor shall ensure all cargo is marked “UNITED
STATES AIR FORCE” in order to ensure shipments clear customs.
4.3.2.3.8 48 FW logistics points of contact are provided for in 4.3.3.
4.3.3 Contact Information; 48th Logistical Readiness Squadron (48 LRS)
4.3.3.1 48 LRS/Inbound Customs; 48lrs.lgrddc.inboundcustoms@us.af.mil.
4.3.3.2 48 LRS/Inbound Cargo; 48lrs.inboundcargo@us.af.mil.
4.3.3.3 Commercial phone number; +44 01638 525620.