About this file
This file is an Amendment 002 containing contractor questions and government responses for a shearing machine procurement by the Air Force Life Cycle Material Command (AFLCMC). The solicitation (47QSWC25Q0118) is a Firm-Fixed Price, small business set-aside Request for Quote (RFQ) for one shearing machine to be used for cutting various metals into desired shapes and sizes.
Key details from the Q&A include confirmation that the contractor is responsible for machine installation, with government providing electrical connections. The procurement requires on-site final installation and training, including precise equipment calibration (+/-.001" squareness per foot). The machine must have specific features like T-slots in the table, support arms for manual gauging, and the purchase will occur after contract award within a 365-day performance period. The procurement is being conducted under Simplified Acquisition Procedures and will be fulfilled through the GSA Federal Acquisition Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_002_Packing instructions.pdf | ||
| Amendment_002_RFQ Amendment_ShearingMachine_6172025.docx | DOCX document | |
| Amendment_002_47QSWC25Q0118_GovResponseToKTRQuestions.pdf | ||
| Amend_01_Q0118_Ext.ShearingMachine_6112025.pdf | ||
| Attachment 2 Technical_ShearingMachine.xlsx | XLSX spreadsheet | |
| Attachment 3_ASSIST Registration.pdf | ||
| Attachment 1 Pricing Spreadsheet_ShearingMachine.xlsx | XLSX spreadsheet | |
| RFQ_47QSWC25Q0118_shearingmachine_5152025.docx | DOCX document | |
| Attachment 4 Shipping Shearing machine_Location.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Answers 5202025
| AFLCMC Shearing Machine Questions and Responses Form | ||||
| Page | Section | Para | Question | Government Answer |
| General Question | Is the government responsible for: rigging - offload, set, level, lag the machine to the floor? | No, the contractor is responsible for installation/base(Civil Engineering) will connect to power | ||
| General Question | If not please clarify with an amendment and answer the following: |
Dock or ground level?
Surface conditions just outside and inside the building- asphalt, concrete, gravel?
Door height and width?
Clear access to final installation location? Ground level Surface condition inside the building - concrete Door height: 50ft (w) x 20 ft (H) Clear access to final installation location - yes
| General Question | Building electrical connections- government to supply disconnect breaker box, conduit, wire, to the machine? | Yes. |
| General Question | If not, |
Length of run of conduit that will be required from building source power to breaker box?
Length of run of conduit from breaker box to the machine?
Voltage required?
| Amps available? | See question and reply above. | ||
| General Question | Does the government require on site final installation and training: blades gaped, squaring arm squared, backgauge bar squared, proof/ sign-off that shear is shearing within spec: +/-.001” squareness per foot? | Yes. | |
| General Question | 4’ frontgauge?- support arms along with table to achieve 4’ of manual gauging? | Based on the nature of the question, the Government is unable to offer clarification or additional information beyond what has already been stated in the RFQ | |
| General Question | T-slots in table to match slots in arms for drop stops to be positioned 0-48” out from the blade? | Yes. | |
| General Question | Recessed scales- tape measure, next to the slots and in the arms? | Based on the nature of the question, the Government is able to offer clarification or additional information beyond what has already been stated in the RFQ | |
| General Question | Is this an immediate purchase on award or is it at the discretion of the AF when it will be purchased during a 365 time period? | The requirement is for the purchase of the shearing machine to occur after contract award. Deliveries must align with the period of performance. |