Amendment_002_Contractor_Questions_ShearingMachine_5202025.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- AFLCMC Shearing Machine Procurement Federal contract opportunity
- Solicitation number
- 47QSWC25Q0118
- Issued by
- GSA Federal Acquisition Service
About this file
This file is an Amendment 002 containing contractor questions and government responses for a shearing machine procurement by the Air Force Life Cycle Material Command (AFLCMC). The solicitation (47QSWC25Q0118) is a Firm-Fixed Price, small business set-aside Request for Quote (RFQ) for one shearing machine to be used for cutting various metals into desired shapes and sizes.
Key details from the Q&A include confirmation that the contractor is responsible for machine installation, with government providing electrical connections. The procurement requires on-site final installation and training, including precise equipment calibration (+/-.001" squareness per foot). The machine must have specific features like T-slots in the table, support arms for manual gauging, and the purchase will occur after contract award within a 365-day performance period. The procurement is being conducted under Simplified Acquisition Procedures and will be fulfilled through the GSA Federal Acquisition Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_002_RFQ Amendment_ShearingMachine_6172025.docx | DOCX document | |
| Amendment_002_47QSWC25Q0118_GovResponseToKTRQuestions.pdf | ||
| Amendment_002_Packing instructions.pdf | ||
| Amend_01_Q0118_Ext.ShearingMachine_6112025.pdf | ||
| RFQ_47QSWC25Q0118_shearingmachine_5152025.docx | DOCX document | |
| Attachment 4 Shipping Shearing machine_Location.xlsx | XLSX spreadsheet | |
| Attachment 1 Pricing Spreadsheet_ShearingMachine.xlsx | XLSX spreadsheet | |
| Attachment 2 Technical_ShearingMachine.xlsx | XLSX spreadsheet | |
| Attachment 3_ASSIST Registration.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Answers 5202025
| AFLCMC Shearing Machine Questions and Responses Form | ||||
| Page | Section | Para | Question | Government Answer |
| General Question | Is the government responsible for: rigging - offload, set, level, lag the machine to the floor? | No, the contractor is responsible for installation/base(Civil Engineering) will connect to power | ||
| General Question | If not please clarify with an amendment and answer the following: |
Dock or ground level?
Surface conditions just outside and inside the building- asphalt, concrete, gravel?
Door height and width?
Clear access to final installation location? Ground level Surface condition inside the building - concrete Door height: 50ft (w) x 20 ft (H) Clear access to final installation location - yes
| General Question | Building electrical connections- government to supply disconnect breaker box, conduit, wire, to the machine? | Yes. |
| General Question | If not, |
Length of run of conduit that will be required from building source power to breaker box?
Length of run of conduit from breaker box to the machine?
Voltage required?
| Amps available? | See question and reply above. | ||
| General Question | Does the government require on site final installation and training: blades gaped, squaring arm squared, backgauge bar squared, proof/ sign-off that shear is shearing within spec: +/-.001” squareness per foot? | Yes. | |
| General Question | 4’ frontgauge?- support arms along with table to achieve 4’ of manual gauging? | Based on the nature of the question, the Government is unable to offer clarification or additional information beyond what has already been stated in the RFQ | |
| General Question | T-slots in table to match slots in arms for drop stops to be positioned 0-48” out from the blade? | Yes. | |
| General Question | Recessed scales- tape measure, next to the slots and in the arms? | Based on the nature of the question, the Government is able to offer clarification or additional information beyond what has already been stated in the RFQ | |
| General Question | Is this an immediate purchase on award or is it at the discretion of the AF when it will be purchased during a 365 time period? | The requirement is for the purchase of the shearing machine to occur after contract award. Deliveries must align with the period of performance. |
Sheet3
File details come from the government source that posted it. Updated .