Amendment_002_Contractor_Questions_ShearingMachine_5202025.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
AFLCMC Shearing Machine Procurement Federal contract opportunity
Solicitation number
47QSWC25Q0118
Issued by
GSA Federal Acquisition Service

About this file

This file is an Amendment 002 containing contractor questions and government responses for a shearing machine procurement by the Air Force Life Cycle Material Command (AFLCMC). The solicitation (47QSWC25Q0118) is a Firm-Fixed Price, small business set-aside Request for Quote (RFQ) for one shearing machine to be used for cutting various metals into desired shapes and sizes.

Key details from the Q&A include confirmation that the contractor is responsible for machine installation, with government providing electrical connections. The procurement requires on-site final installation and training, including precise equipment calibration (+/-.001" squareness per foot). The machine must have specific features like T-slots in the table, support arms for manual gauging, and the purchase will occur after contract award within a 365-day performance period. The procurement is being conducted under Simplified Acquisition Procedures and will be fulfilled through the GSA Federal Acquisition Service.

View the file

Other files for this federal contract opportunity

Other files attached to AFLCMC Shearing Machine Procurement, newest first.
File Type Posted
Amendment_002_RFQ Amendment_ShearingMachine_6172025.docx DOCX document
Amendment_002_47QSWC25Q0118_GovResponseToKTRQuestions.pdf PDF
Amendment_002_Packing instructions.pdf PDF
Amend_01_Q0118_Ext.ShearingMachine_6112025.pdf PDF
RFQ_47QSWC25Q0118_shearingmachine_5152025.docx DOCX document
Attachment 4 Shipping Shearing machine_Location.xlsx XLSX spreadsheet
Attachment 1 Pricing Spreadsheet_ShearingMachine.xlsx XLSX spreadsheet
Attachment 2 Technical_ShearingMachine.xlsx XLSX spreadsheet
Attachment 3_ASSIST Registration.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Answers 5202025

AFLCMC Shearing Machine Questions and Responses Form
PageSectionParaQuestionGovernment Answer
General QuestionIs the government responsible for: rigging - offload, set, level, lag the machine to the floor?No, the contractor is responsible for installation/base(Civil Engineering) will connect to power
General QuestionIf not please clarify with an amendment and answer the following:

Dock or ground level?

Surface conditions just outside and inside the building- asphalt, concrete, gravel?

Door height and width?

Clear access to final installation location? Ground level Surface condition inside the building - concrete Door height: 50ft (w) x 20 ft (H) Clear access to final installation location - yes

General QuestionBuilding electrical connections- government to supply disconnect breaker box, conduit, wire, to the machine?Yes.
General QuestionIf not,

Length of run of conduit that will be required from building source power to breaker box?

Length of run of conduit from breaker box to the machine?

Voltage required?

Amps available?See question and reply above.
General QuestionDoes the government require on site final installation and training: blades gaped, squaring arm squared, backgauge bar squared, proof/ sign-off that shear is shearing within spec: +/-.001” squareness per foot?Yes.
General Question4’ frontgauge?- support arms along with table to achieve 4’ of manual gauging?Based on the nature of the question, the Government is unable to offer clarification or additional information beyond what has already been stated in the RFQ
General QuestionT-slots in table to match slots in arms for drop stops to be positioned 0-48” out from the blade?Yes.
General QuestionRecessed scales- tape measure, next to the slots and in the arms?Based on the nature of the question, the Government is able to offer clarification or additional information beyond what has already been stated in the RFQ
General QuestionIs this an immediate purchase on award or is it at the discretion of the AF when it will be purchased during a 365 time period?The requirement is for the purchase of the shearing machine to occur after contract award. Deliveries must align with the period of performance.