1st Round of Q&A's
| Question: | ANSWER: | COMMENTS | |
| 1 | Will the vendor required to use their own account numbers with carriers (Example: USPS) to do the bookings for outbound shipments? | No. Accounts will be established via Gov't. for USPS, NGDS, etc.... . . | I would think that that the vendor would be using an established account provied by Govt. Why would we not have our own accounts set up for vendor to use. By letting the vendor establish own accounts, the cost of doihg business wil be higher. This was also confrimed by Scott Kidd of FAS transportation. - Hal |
| 2 | Will account numbers for the FACTS/IBS/GATES/GFM to manage bookings on each portal be provided to the awardee? | ||
| Yes | |||
| 3 | In the Anticipated Workload attachment, there are 7,592 Lines (Monthly), could you please advise what is meant by lines? Do they include the 22,776 packages (Monthly)? | Lines meant Requisition Numbers. Yes, packages are part of the requisitions. For example, one requisition may have several packages of single line item. Example. HP Toner, customer ordered 10 of the same toner and that will be 10 packages. | |
| 4 | How do we manage Damaged and RV packages? | Damages will be reported to via desctrepancy report with pictures to GSA NCSC with SCM Transportation also being copied. | |
| 5 | Are there any Insurance requirements? | Yes to cover shipments received in you warehouse to protect the Government. | |
| 6 | How are we going to receive notifications of incoming shipments? Will they include Packing lists, items reference numbers? | ||
| Yes. GSA will provide of all incoming shipments from GSA vendors to 3PL contractor will all information including ultimate overseas destination of each shipment. | |||
| 7 | What are the required operating hours? Are we required to have operational people 24 hours? | Normal operating hours. Monday - Friday. 8 hours shift. | |
| 8 | Are we going to receive inbound shipments on weekends and/or Federal Holidays? | NO....Normal operating hours. Monday - Friday. 8 hours shift. | |
| 9 | Does the Government require the facility(s) to be a bonded facility? | No | |
| 10 | Are we allowed to charge a handling fee per the size of package? | If you plan to charge a handling fee, please explain the manner in which you plan to charge GSA. | |
| 11 | We are apparently allowed to charge a Declaration Fee, but there is no mention of repackaging. In addition, we would need supplier to provide all details such as MSDS Sheets etc.(vendor) | Most shipments should be packaged correctly by the supplying GSA vendors asper contractual requirements. If shipment was not packaged or packed IAW Federal requirements, material will be repacked by the 3PL contractor. Any materials if required will be supplied by 3PL contractor. With HAZMAT materials, GSA vendors are required to provide the packing list and SD/MSDS. Shipment should already have necessary HAZMAT labels. If hazmat labels and/or documentation are required, 3PL contractor will provide materials., . | |
| 12 | General: Would you consider a virtual industry day?That would allow the bidding community to understand better all the details of the program and as such, offer the best solution we can provide. | RFI was already conducted. The Q&A document will be posted with an additional question deadline. | |
| 13 | . How long does Recertification take? Based on PWS, the approximate average time of storage is not more than 15 days. | Yes. It's a new requirement. | |
| 14 | Could you provide detail relating to ship-to customer locations, such as Country, City, Zip Code along with annual shipment volumes? | Yes. We can provide ultimate overseas destination address of the customers and we can provide an estimated volume. | |
| 15 | Is there any seasonality to the demand? Is so, please describe. | Yes. Volume of shipments is usually lower in the beginning of the FY and historically higher during the last quarter of the FY. | |
| 16 | What is the estimated square feet required to store materials per warehouse / by location? | Other than frustrated freight, there will be no requitrement to store material. facility will be a transshipments. . | |
| 17 | Are there any specific storage requirements (e.g. temperature controlled, hazardous, controlled substances, goods requiring licenses, etc.)? | No. This will be a transhipment facilty and will be no requirement to store material. | |
| 18 | Would we be working with VSM? | No. Maybe in the near future. | |
| 19 | Who owns the inventory? | It will be no inventory required. It will be solely transhipment requirements. Material is owned by Gov't. | |
| 20 | What are the Incoterms? | The vendor ships to the customer through your transhipment facilty. While the shipment is in contractor warehouse, contractor is responsible for material until shipped to the end user from transhipment center.. | |
| 21 | Is there a requirement for Reverse Logistics activities? | That maybe a possibility. | |
| 22 | Are there any oversized products or any products requiring special handling or special material handling equipment? | Other than some hazmat material and some Odd ball items as shovels, axes, trash cans, there will not be special handling. | |
| 23 | Are any debadging / destruction / disposal services required? | No | |
| 24 | Who is responsible for coordinating and moving current inventory? Where is it located? | No inventory. | |
| 25 | Is / are there facilities we could take over and assume operations thereof? | No | |
| 26 | Can we consolidate shipments to same facility / location / address? | Yes for the same customer. No. It will be no consolidation especially for different customers even if they're located in the same overseas destination address. | |
| 27 | Do we need to provide adedicated facility or facilities for this contract (i.e. we cannot use any of our existing locations / facilities)? | No. It does not have to be dedicated facility or warehouse. Existing warehouse can be utilized as long as they have enough space to dedicate to perform the requirements. | |
| 28 | Who is responsible for assuring each order / shipment is processed i/a/w global trade compliance regulations? | GSA is responsible in ensuring all products that will be supplied by GSA vendors are in accordande with TAA agreement. 3PL contractor will not have to inspect or check if the product for transhipment for OCONUS customers is TAA or not. However, the 3PL is responsible for ensuring that the Hazmat regulations and certifications are followed per shipment. Additionally, documentation for shipment must be inspected to ensure proper shipment to end-users. | |
| 29 | The requirement for a CONUS warehouse as opposed to an OCONUS warehouse. Are there any restrictions to setting up OCONUS locations like HI or Guam? | No, but will be interested in the value of a OCONUS location. | |
| 30 | Are we required to use USPS for 50% of items or was that the government listing that info as an example? | Most transhipments that will be performed by the 3PL contractor will be processed using DoD Transportation system. High volume will go MILAIR using FACTS system and small percent will need to be containerized because of high volume or weight will be booked for surface shipment using IBS. In the future, some shipments have to go commercial air NGDS which GSA will set up accounts for the 3PL contractor to use. | |
| 31 | Approximately how many vendors will be supplying product to the warehouse facility(ies)? | Multiple vendors. Some large vendors will be supplying more products than others. Some small vendors will be supplying only one or twice a month and some only a few times a year. | |
| 32 | Who is ordering the products from the vendors? | Mostly military customers deployed or based overseas. | |
| 33 | Are we the primary ecommerce hub for the items stocked in the warehouse, or are the KOs going directly to vendors and the facility is moreso a pick/pack/ship operation? | No stock items. 3PL will perform transhipments to final overseas destination after receiving shipment packages from GSA vendors. | |
| 34 | s/are any type of forward stocking locations in the delivery region(s) required? | No stock items. | |
| 35 | Where are the OCONUS locations? We cannot accurately quote unless we know the OCONUS locations. Also once in PACOM or EUCOM, are we responsible for final mile delivery or just to a central location? | 3PL Contractor will not be responsible for final mile delivery. All shipments' final destinations are mostly military bases overseas in country like Korea, Japan, Germany, Italy, Kuwait, etc. Most shipments will go MILAIR using FACTS and when shipment is approved and cleared for MILAIR by ACA, information automatically to GATES. Small percent of shipments that because of high volume or weight cannot go MILAIR or commercial air, they have to be containerized, processed and booked through IBS for surface/ocean shipment. Supposedly IBS is not interfacing with GATES so when a shipment is successfully booked in IBS, information about the TCN shipment will have to inputted to GATES for tracking purposes. The 3PL responsibility ends when the shipment leaves their warehouse. | |
| 36 | The contractor shall be responsible for the creation and application of supply shipping documentation". We need further information here. Are you requiring us to create a packing list and commercial invoice? If so, how do we accomplish that? | All GSA vendors are required to provide packing list when they ship to 3PL Contractor for transhipments. Since most shipments will go MILAIR, once approved and cleared for MILAIR, FACTS system will provide the copy of TCMD and MSL for printing. | |
| 37 | The contractor shall be responsible to remediate any discrepancies. Does this mean work with the shipper? Also under the same paragraph f, what is our risk of loss when that transfers to the 3PL? | Most shipments should be packaged already as required but if shipment was not packaged or packed properly by the supplying GSA vendors, it will need to be repacked by the 3PL contractor and if required other materials, 3PL contractor will use their own materials. If there is any discrepancy cannot be fixed by the 3PL contractor, they can contact the supplying GSA vendor to resolve the issue. | |
| 38 | Where will we obtain the TAC Codes? | GSA will provide the appropriate TAC for each requisition. | |
| 39 | Are we shipping to one centralized PACOM/EUCOM logistics hub, or are we shipping to multiple locations within each theater region? | Please see #35. Most shipments will be going MILAIR to overseas military bases. In the future, some shipments have to go commercial air NGDS, which GSA will set up accounts for the 3PL contractor. The 3PL will be shipping to the POE CONUS for surface shipment, Aiport of Embarkazion for the Air shipments, and if NGDS the UPS, FedEx, or DHS will come to pick the packages up from the 3PL warehouse. | |
| 40 | If there are multiple destinations within each region that we're shipping to, will we be shipping to logistics hubs in country or individual commands? |
Ex. In PACOM AOR, will we ship to bases such as Changi, Singapore & Yokosuka, Japan or will we ship to individual commands such as DESRON 15, CTF-70, etc? This will affect the amount of freight handling and personnel that we'll need to account for in our proposal.
| Please see #35. Most shipments will be going MILAIR to overseas military bases. In the future, some shipments have to go commercial air NGDS, which GSA will set up accounts for the 3PL contractor. The 3PL will be shipping to the POE CONUS for surface shipment, Airport of Embarkazion for the Air shipments, and if NGDS the UPS, FedEx, or DHS will come to pick the packages up from the 3PL warehouse. | |||
| 41 | Who Performs the recertification of Hazardous materials/DG prior to outbound shipment? | The 3PL is responsible for the recertification of HAZMAT Shipments. | |
| 42 | . How long does Recertification take? Based on PWS, the approximate average time of storage is not more than 15 days. | You tell us how long would it take you based on your experience. Usually will not take more than 2 days or leass. | |
| 43 | Contractors are to provide a description of, and documentation verifying that the contractor has/will have warehouse(s) upon contract award. What type of verifying documentation is required? | A signed letter or agreement shows an offer and an intention of the lease upon awarding the contract. The contract award has to be the de facto of the agreement. | |
| 44 | Each proposal must identify Key Personnel and provide resumes of supervisors and technical staff that lead. Would this consist of a Program Manager and Shift Supervisors only? Would resumes for Sectional Leads of different functional areas be required? | Program Manager and Shift Supervisor would suffice. | |
| 45 | Can you provide the estimated number of inbound and outbound shipments? | Please see attachment 5 of the solicitation. The number of inbounds will be equal to number of outbounds because what comes in must go out for transhipment to final destination overseas. | |
| 46 | Does the Government have a desired locale for the cross-dock operation? | The 3PL is allowed to propose strategic locations within reason. 1 or 2, it is up to you. | |
| 47 | Is there a specific list of materials received, packaged and shipped to support the indicated workload? | Yes | |
| 48 | Must the contractor comply with MIL-STD-2073 for packaging on all shipments? | Yes | |
| 49 | Can the Government please provide an example of the type of electronic reports (Required Deliverable) of discrepancies encountered bi-weekly? | ||
| 50 | Will the instructions from SCM PMO describe the type of consolidation and containerization required? | Yes | |
| 51 | Is the contractor reimbursed for miss-shipments and re-transportation CONUS? | No if it is the contractors fault | |
| 52 | Three(3) data systems are to be used, i.e., Financial and Air Clearance Transportation System (FACTS), the Integrated Booking System (IBS), and Global Air Transportation and Execution System (GATES).” Can the Government please clarify that all three (3) systems are needed for each shipment? If only one (1) system is needed for each shipment, will the contractor receive instruction on which system is to be used? | The contractor will need access to all three systems. Most shipments will go MILAIR using FACTS, and when the shipment is approved and cleared for MILAIR by ACA, information automatically goes into GATES. A small percent of shipments that cannot go MILAIR or commercial air; they have to be containerized, processed, and booked through IBS for surface/ocean shipment. IBS is not interfacing with GATES at the moment, so when a shipment is successfully booked in IBS, information about the TCN shipment will have to be manually inputted into GATES. | |
| 53 | What are the segregation/fencing requirements for a shared warehouse? | ||
| Recommend that if shared warehouse is approved, must have dedicated doors for receiving and shipment operations for Federal Govt. If chain link fence is used for separation, chain link fence must go from warehouse floor to the top ceiling rafters and no access gates or doors in chain link fence. . | Recommend that if shared warehouse is approved, must have dedicated doors for receiving and shipment operations for Federal Govt. If chain link fence is used for separation, chain link fence must go from warehouse floor to the top ceiling rafters and no access gates or doors in chain link fence. . | ||
| 54 | Must we own the warehouse outright or can we lease space from another owner? | You could lease space from another owner. However, the shipments must not be mix with another material. It most be segregated. The 3PL is responsible and will be held accountable for all the products that go into their warehouse. | |
| 55 | Is the freight required to be repacked or does the shipments (freight) prepackaged already? Are we to use our own Triwals or will GSA provide the materials? | ||
| Most shipments should be packaged already as required but if shipment was not packaged or packed properly from the supplying vendors, it will need to be repacked by the contractor and if required other materials, 3PL contractor will use their own materials. This process is called remediation. |
2nd round of Q&A's
| Question | Answer | ||
| 1 | The RFP and PWS state that the warehouse space is to be used solely for the storage of material that supports the bid. Is it acceptable to provide dedicated space within a larger warehouse by, say, separating the GSA space from other cargo with a fence or painted line? Or does the warehouse need to be fully dedicated to the activity? | The space does not have to be dedicated facility or warehouse. Existing warehouse can be utilized as long as there is enough space to dedicate to perform the requirements. If shared warehouse is approved, must have dedicated doors for receiving and shipment operations for Federal Govt. If chain link fence is used for separation, chain link fence must go from warehouse floor to the top ceiling rafters and no access gates or doors in chain link fence. | |
| 2 | The RFP uses the words packing and packaging in several places without additional details. Is the contractor expected to repack each item, or is the only packing that's necessary creating an overpack for shipments going to the same destination? | Contactor is not required to repack each item. If box is idenfied as damaged or inadequate packing, repacking will occur to include reporting descrepancy. Overpack for shipments going to the same Activiy Address Code (AAC) destination. | |
| 3 | What is the desired commencement date for the activity? | The contract should be fully operational 30 days after contract award | |
| 4 | The RFP provides weight information but not volume. Can you provide guidance on the size of incoming cargo or the outgoing shipment sizes (either CFT or an average density per lb.)? This will ensure we size the facility accurately and also calculate the cost of any packaging materials. | Incoming number of cargo, total weight and volume will change from day to day. Incoming cargo will be equal to cargo outgoing because everything that comes in, must go out to final destination. Most shipments should be packaged already as required but if shipment was not packaged or packed properly from the supplying vendors, it will need to be repacked by the contractor and if required other materials, 3PL contractor will use their own materials. Previous history only small percent will need to be repackaged or relabeled. | |
| 5 | For the 3PL effort, could the Government please confirm the style of font and font size for the proposal? Are smaller font sizes allowable for tables and charts? | Font size in proposal shall be 12- point Times New Roman font however, smaller Font size is allowable within charts and tables as long as it is readable. | |
| 6 | Who will be selecting the Port of Embarkation – the shippers, GSA, or the awarded contractor for the GSA Export solicitation? | Most transhipments that will be performed by the 3PL contractor will be processed using DoD Transportation system. High volume will go MILAIR using FACTS system and small percent will need to be containerized because of high volume or weight will be booked for surface shipment using IBS. In the future, some shipments have to go commercial air NGDS which GSA will set up accounts for the 3PL contractor to use. Once MILAIR is cleared by military ACA in FACTS, POE will be provided in the MSL including the exact address of the POE. For example, if shipment for Air Force in Kuwait is cleared for MILAIR, POE will more likely be DOV (Dover AFB AMC). | |
| 7 | How and when is the selection of the Port of Embarkation done? | The Point of Embarkation is determined based on the overseas location when customer submitted the order. | |
| 8 | Can GSA advise the acceptable ports of embarkation for departures by military air based on the shipment destinations? For example, what is the anticipated port of embarkation for the following country destinations: Germany, UK, Spain, Italy, Japan, Korea, Bahrain, Kuwait, Oman, Qatar? | Yes, GSA can advise acceptable ports of embarkation for departures by military air based on the shipment destinations. Countires as Germany, UK, Spain, Italy, Bahrain, Kuwait, Oman, Qatar would be McGuire AFB or Dover AFB. Korea or Japan would be travis AFB. FACTS will determine aerial port of embarkation. | |
| 9 | How is the selection of the mode of transport (GHS vs milair vs NGDS vs USC ocean) made and how will the contractor be informed of this selection? | GSA will provide the guidelines, requirements and policy which transshipment will be going MILAIR, surface shipment or commercial air through NGDS. | |
| 10 | Is the contractor responsible for the cost of postage or will the government provide its own account for direct billing purposes? Is the contractor responsible for the cost of delivering freight to the port of embarkation or to the designated military aerial port? | Yes, 3PL contractor will be responsible for delivering to the POE. Transshipments should not be going to military postal service to the APO/FPO address. | |
| 11 | Are there any special operational procedures or systems required for the shipments processed by USPS? For example, presorting and drop shipping or postal barcodes, postage statements, and PS-2976-R forms? | Transshipments should not be shipping driectly to a military postal service to the APO/FPO address. | |
| 12 | Is the TCN included in the EDI 850 message, provided to the contractor by another means, or constructed by the contractor? | Yes, the TCN is included | |
| 13 | For recently established businesses what would satisfy the government's need for financial information? | Two years of balance sheets is requested at a minimum. However, if the newly established business has less than two years of financials to provide, please note date business was established that in proposal and provide financials for the time in business. | |
| 14 | THE RFP provides shipment weight information but not volume. Can you provide guidance that will assist in planning the correct facility size and shelving for the transload facility? | About 2000 - 2500 shipments per month. 95% are 70 lbs or less. | |
| 15 | Please advise the number of outbound shipments per month - is it one shipment per p.o., per line, or per package? | About 2000 - 2500 shipments per month | |
| 16 | • Solicitation Page 13, Tab 4, requires the completion of all Section K Representations and Certifications. Please confirm Offerors only must submit completed Section K paragraph 52.212-3(b)(1) Annual Representations and Certifications. | Yes; Please submit completed Section K paragraph 52.212-3(b)(1) Annual Representations and Certifications. | |
| 17 | • Solicitation Page 14, Tab 8, what will be the government’s determining factors/criteria in deciding if a contractor has “sufficient resources to perform the requirements of the contract”? | All financial infomation provided with proposal will be evaluated. Ideally, vendor's will provide financials to perform a quick and current ratio for the business. The vendor will be contacted by the CO reviewing the proposal and ask for additonal information on additional resources (If needed) or clarifications. The CO may also request KC Finance for assistance (if needed). | |
| 18 | • Solicitation Page 15, E.9, Quantity, states “Blank tabbed pages containing no substantive proposal data are not included in the page limitations.” Since submission of proposals are in electronic format are tab pages required in separating Factors and Subfactors of the Technical Proposal. | Yes; Tab(s) should be inserted in the electronic proposal to separate factor(s) and subfactor's. A tab should be listed on a page by itself. | |
| 19 | • Solicitation Page 16, Sub-factor 1) f. instruct Offerors to provide sufficient supporting documentation demonstration that the contractor will comply with the QASP as identified in Attachment 4. What type of supporting documentation does the government require? Would referencing the response to Sub-factor 2B – Quality Assurance provided by the Offeror suffice? | Please reference in Subfactor 1. F how you propose to manage the contract and manage quality assurance. This would suffice as supporting documentation for proposed compliance to the QASP (Attachment 4). | |
| 20 | • Solicitation Page 17, Sub-factor 2B 3) excludes from the page count resumes and letters of commitment of Key Personnel. Can Offerors include resumes and letters of commitment of Key Personnel as an Addendum at the end of Technical Proposal? | Yes; proposals and letters of committment can be added as an addendum to the proposal | |
| 21 | • Solicitation Page 19, E.9.5 Submission states the proposal must list the FFP per transaction type category utilizing each of the various carrier types and a final per unit FFP of each shipment size category that encompasses all costs for that transaction. Would completing Attachment 3 3PL Pricing Breakdown satisfy this requirement? | Yes. | |
| 22 | • Solicitation Page 19, E.9.5 Submission states the proposal must list the FFP per transaction type category utilizing each of the various carrier types and a final per unit FFP of each shipment size category that encompasses all costs for that transaction. Based upon this requirement and that of Attachment 3, Offerors can only provide a single FFP for each weight category per carrier type regardless of delivery location. Please provide the historical data for the last three years of the delivery destination in the format of Attachment 5. | Historically, 70% of the volume of transshipments bound for CENTCOM (Afghanistan, Qatar, Kuwait, etc), 10% EUCOM, 10% PACOM, and the other 10% are AFRICOM, SOUTHCOM and NORTHCOM | |
| 23 | • Attachment 1 Terms and Conditions Page 19 incorporates FAR 52.216-2 Economic Price Adjustment-Standard Supplies. Will Offerors be afforded the opportunity to propose economic price adjustments for each option year to cover increases in the cost of shipping due to factors beyond an Offeror’s control such as increases in fuel cost? Tariffs? Postal Cost? Ect…? | The awardee will be able to submit an EPA request and it will be evaluated on a case by case basis each option year by the Contracting Officer. | |
| 24 | • Attachment 1 Terms and Conditions Page 16 incorporates FAR 52.222-41 and 52.222-43 referencing the Service Contract Labor Standards. Wage Determination 2015-4282 Rev. 17 is “attached” to the solicitation. Attachment 2 – 3PL Performance Work Statement Page 3 states, “The contractor must have ownership or access to at least one warehouse in the Continental United States…” and “Ideally- The logistical solution should demonstrate that the vendor has access to commercial ocean ports or military aerial ports”. Are Offerors to use Wage Determination 2015-4282 Rev. 17 for developing FFP per transaction type or can the relevant Wage Determination schedule for the proposed location be used. | That version of the wage determination (Wage Determination 2015-4282 Rev. 17) was included in the soliciation because the exact awardee location was not known at that time. However, in the resultant award, the relevant determination schedule for the exact location shall be applicable. | |
| 25 | • Attachment 1 Terms and Conditions Page 16 incorporates FAR 52.222-41 and 52.222-43 referencing the Service Contract Labor Standards. Wage Determination 2015-4282 Rev. 17 is “attached” to the solicitation. This Wage Determination ends in an even number, which is not standard for contracts governed by Service Contract Labor Standards. Please confirm that Offerors can use the relevant Wage Determination schedule that ends in an odd number. | Offerors should use the appropriate wage determination for their location. | |
| 26 | • Section E.1 Solicitation Provisions Incorporated by Full Text, FAR 52.204-7 System for Award Management (Oct 2018), Paragraph (b)(2) states, “The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “Unique Entity Identifier” followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer.” Paragraph (c) in the same Section states, “If the offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one.” On the GSA Website, Unique Entity Identifier (UEI) Update page, it references that the UEI will be assigned to all entities who register to do business with the federal government. It further states, “New Unique Entity Identifiers will be automatically assigned to entities registered in SAM at a future date” and “Users are not required to take any action at this time. The IAE has shifted the UEI transition date from December 2020 to a future, to-be-determined date.” Based upon this information please confirm that businesses are able to obtain a UEI from www.SAM.gov. | This is no longer applicable. The IAE has shifted the UEI transition date from December 2020 to a future, to-be-determined date. Users are not required to take any action at this time. The UEI guidance is found at https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-information-kit/unique-entity-identifier-update | |
| 27 | Performance Work Statement Page 4 states, “The Contractor shall be responsible for processing shipments for induction into the Defense Transportation System, U.S. Postal System, Parcel Post, international commercial air and/or international ocean transportation terminal”. Who makes the decision how an item will be shipped, the government or the contractor? | GSA will determine and provide the guidelines if the transhipment should go either MILAIR, surface shipment and commercial air via NGDS. | |
| 28 | • PWS Page 3, B.1.II requires the contractor to inspect packages received. Will the contractor be required to open every package received and inspect and repackage in accordance with MILSPEC standards? | Only if packages are open or damaged. | |
| 29 | • | Amendment 0002 does not extend the proposal due date. Request that the proposal due date be extended to allow for adequate time for offerors to consider answers to questions submitted that will effect staffing and final pricing. | The due date for proposals is Oct 20, 2020. The tenative contract award in before the end of 2020 Calendar year. |
| 30 | Based on RFP data, how far in advance will offers be notified of next day inbound shipments? | GSA will provide daily updates of all incoming shipments in a form spreadsheet with all pertaining information. | |
| 31 | Will the 3PL that will act as a consolidation warehouse for the GSA? | 3PL will be allowed to consolidate as long as all orders came from the same DoDAAC and each order has the same issue group priority. | |
| 32 | On attachment 5, “Anticipated Workload Forecast,” are the numbers provided for the outbound portion only, ie. freight moving from the 3PL to the APOD/E? o Does this mean the freight will be consolidated and picked up by the USPS (50%)? Will the 3PL simply receive the freight, consolidate, label and release to the USPS 50% of the time? Or will the freight be consolidated at the 3PL for onward movement to the corresponding AMC HUB? | 3PL will be responsible for shipping to POE as approved MILAIR by Military Air Clearance Authority (ACA). 3PL will have an option to choose any commercial carrier in delivering to POE. |