47QMCA22R0013_Attachment_2_-_Proposal_Checklist.docx

DOCX document 18 KB Posted

Attached to
Medium and Heavy Duty Trucks / Wreckers and Carrie
Solicitation number
47QMCA22R0013
Issued by

About this file

This proposal checklist outlines the requirements for proposals submitted in response to solicitation number 47QMCA22R0013 for medium and heavy duty trucks and wreckers and carriers. Offerors must submit proposals in three volumes - an administrative volume containing forms and certifications, a technical volume addressing technical capability and management approach, and a price volume with pricing submitted through AutoBid by September 2, 2022. The technical volume must include the offeror's technical approach, project plan, and any exceptions to federal standards. It must also include the offeror's management approach and damage in transit procedures. The past performance volume should include details of relevant previous projects. The GSA will use the information provided to evaluate the offeror's technical capability, management capability, past performance, and price.

View the file

Other files

File Type Posted
GSA_47QMCA22R0013_MHWC_Questions_and_Answers_0003.pdf PDF
47QMCA22R0013_MHWC_2022_Solicitation_FINAL_8_8_2022_0003.pdf PDF
47QMCA22R0013_MHWC_Industry_Day_Presentation_7_25_2022_0002.pptx PPTX presentation
47QMCA22R0013_MHWC_2022_Solicitation_7_18_2022_0001.pdf PDF
47QMCA22R0013_Attachment_20_-_DIT_Claim_Form_Template_Purchasing.pdf PDF
47QMCA22R0013_Attachment_14_-_AutoBid_Instructions.pdf PDF
47QMCA22R0013_Attachment_5_-_Technical_Exceptions_Worksheet.xlsx XLSX spreadsheet
47QMCA22R0013_Attachment_4_-_Offeror_Response_Document.docx DOCX document
47QMCA22R0013_Attachment_19_-_DIT_Claim_Form_Template_Leasing.pdf PDF
47QMCA22R0013_Attachment_17_-_Item_888E.pdf PDF
Sol_47QMCA22R0013.pdf PDF
47QMCA22R0013_Attachment_12A_-_Commercial_Model_Subcontracting_Plan.docx DOCX document
47QMCA22R0013_Attachment_10_-_Weekly_Status_Report_Example.xlsx XLSX spreadsheet
47QMCA22R0013_Attachment_7_-_Schedule_of_Items.docx DOCX document
47QMCA22R0013_Attachment_6_-_Federal_Standards_DRAFT.pdf PDF
47QMCA22R0013_Attachment_1_-_Incorporated_by_Reference.docx DOCX document
47QMCA22R0013_Attachment_16_-_GSA_Form_1611.xlsx XLSX spreadsheet
47QMCA22R0013_Attachment_13_-_Inspection_Points_Template.xlsx XLSX spreadsheet
47QMCA22R0013_Attachment_8_-_Estimated_Quantities.docx DOCX document
47QMCA22R0013_Attachment_11_-_Monthly_Status_Report_Template.xlsx XLSX spreadsheet
47QMCA22R0013_Attachment_12B_-_Individual_Model_Subcontracting_Plan.docx DOCX document
47QMCA22R0013_Attachment_18_-_FedConnect_Instructions.pdf PDF
47QMCA22R0013_Attachment_3_-_SF1449.pdf PDF
47QMCA22R0013_MHWC_2022_Solicitation_7_18_2022.pdf PDF
47QMCA22R0013_Attachment_9_-_Weekly_Vendor_Status_Submission_Requirements_Report.pdf PDF
47QMCA22R0013_Attachment_15_-_AutoChoice_Online_Ordering_Instructions.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 – PROPOSAL CHECKLIST

SOLICITATION 47QMCA22R0013

This proposal checklist is to assist Offerors in ensuring that proposals are complete. An electronic copy of this completed checklist must be included with all offers submitted. Prior to preparation of your offer, be sure to read the entire solicitation. Offers shall be prepared and submitted in the format outlined below.

Proposal Checklist

Volume 1—Administrative Requirements

(ELECTRONIC VERSION ONLY)

Included/ Completed
GSA

Use

Completed Proposal Checklist

TAB A – SF1449 {complete with blocks 17(a), 30(a), 30(b) and 30(c)}

TAB B – Offeror Response Document (DO NOT include entire solicitation document)

TAB C – Financial Information

TAB D – SAM Information

TAB E – Proof of completion of VETS-4212 reporting requirement

TAB F – Subcontracting Plan

TAB G – Letter of Supply

TAB H – Inspection Points / Place(s) of Performance

Volume 2—Technical Proposal

Included/ Completed
GSA

Factor 1 – Technical Capability

TAB A – Technical Approach

TAB B – Project Plan

TAB C – Exceptions to Federal Standards

Factor 2 – Management Capability

TAB A – Management Approach

TAB B – Damage in Transit (DIT) Procedures

Factor 3 – Past Performance

TAB A – Projects

Volume 3—Price Proposal

Included/ Completed
GSA

Factor 4 – Price

AutoBid Pricing Completed and Submitted by 3:00 PM Eastern Time on September 2, 2022

Tab A - ELECTRONIC copy of AutoBid printout

File details come from the government source that posted it. Updated .