Q u e s t i o n s a n d A n s w e r s f o r
BLM Non-Slip Coating 47PK1520R0005
December 11, 2019
Questions
1) Is the floor a bare floor? Yes, the floor is bare concrete that has a sealed coating on top.
2) Any concerns with temperature? Winning contractor must keep the space warm as required for a good painting environment per manufacture instructions.
3) What is the cure time for floor drying? At least 7 days but if done in cooler temps recommendation is 10 days for full use. Walking can occur in 48 hours.
4) Does floor need to be etched? Yes floor will need to be prepped prior to painting/sealing.
5) What type of floor prep is required? Etching, sealing, and epoxy non-slip finish.
6). Can water be used on the floor during prep? Yes
7). Will finished work have warranty? Yes, typically one year.
Contractor must provide clear care instructions and warranty stipulations upon project completion.
8). What if manufacturer will not grant 5-year warranty for defects for a job this small? The SOW asks for a minimum of a 5-year manufacture warranty which should be included in cost estimates.
If product used cannot or will not honor 5-year warranty, cost estimate should reflect exclusion of or a reduced manufacture warranty period but one year contractor warranty for installation must still be honored.