47PK0525R0024 Solicitation Package- Fiber Cabling.pdf

PDF 2 MB Posted

Attached to
US Attorney Fiber Cabling Federal contract opportunity
Solicitation number
47PK0525R0024
Issued by
General Services Administration Public Buildings Service Region 9

About this file

This is a solicitation package for GSA contract 47PK0525R0024 to install fiber cabling between floors at the US Attorney's Office Suite in the Matsui Federal Courthouse in Sacramento, CA. The scope includes removing existing copper wire runs and installing new plenum-rated 12F, 50um MultiMode (OM3) fiber optic cable between the 10th floor MDF room and both the 9th floor IDF room (approximately 205 linear feet) and 11th floor IDF room (approximately 170 linear feet). Work includes terminating all ends with LC connectors, ensuring proper fire stopping between floors, and testing per ANSI/TIA/EIA-526-14-A standards.

This is a small business set-aside with an estimated price range under $25,000. A site visit is scheduled for March 4, 2025 at 9:00 AM PST. Questions are due by March 14, 2025 and proposals must be submitted by March 25, 2025 at 4:00 PM PST. The period of performance is 180 calendar days from Notice to Proceed. The contractor must achieve substantial completion within this timeframe and contract completion within 10 days thereafter. Award date is to be determined. The General Services Administration Public Buildings Service Region 9 is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to US Attorney Fiber Cabling, newest first.
File Type Posted
47PK0525R0028 Amendment 0002.pdf PDF
Solicitation Package 47PK0525R0024- USAO Fiber Cabling.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date:

PROJECT TITLE: USAO – Fiber Cabling

SOLICITATION NUMBER: 47PK25R0024

SOLICITATION CLOSES ON: Tuesday, March 25, 2025 at 04:00 pm (PST).

Offers must be submitted by this date and time.

SUBMIT BIDS/OFFERS TO: Patrick Dunlavey, Contracting Officer patrick.dunlavey@gsa.gov, Margo Jaime, COR margo.jaime@gsa.gov, Janette Bair, Procurement janette.bair@gsa.gov

FOR INFORMATION ON THIS PROCUREMENT, CONTACT:

Margo Jaime margo.jaime@gsa.gov

(916) 539-7389

ITEMS OR SERVICES TO BE PURCHASED:

Provide all labor, supervision, materials, and equipment necessary to install fiber cabling between floors for the US Attorney’s Office Suite located at Matsui Federal Courthouse, 501 I

Street, in Sacramento, CA 95814

Basis of Award: Price

SIGNIFICANT EVENTS/DATES:

Attendance at site walk is strongly suggested for this project. GSA urges bidders to visit the site to ascertain the nature and location of any factors which could affect the work or the cost thereof and warns that failure to do so will not relieve bidders of the responsibility to properly estimate the difficulty or cost of successfully performing the work.

Tuesday, March 4, 2025 at 09:00 am. Please meet in Lobby of the Robert T. Matsui Federal Building located at 501 I Street, Sacramento CA 95814. Contact Margo Jaime at margo.jaime@gsa.gov to RSVP for the site walk and with questions about the project.

SUBMISSION OF QUESTIONS/ RFIs: questions must be submitted by Friday, March 14, 2025. Submit all questions to: Margo Jaime, margo.jaime@gsa.gov and Janette Bair, janette.bair@gsa.gov

Docusign Envelope ID: 2FA9CEED-4C98-4690-87E7-30804074CDEA

2/20/2025

PROPOSALS: Proposals are due on Due Date at time. Proposals must include:

● Signed SF1442

● Detailed price breakout per scope of work along with any subcontractor quotes or supporting documentation

● Offeror Representations and Certifications (check all boxes) Signed

CONTRACT AWARD DATE: To be Determined.

Sincerely, Patrick Dunlavey, Contracting Officer

Docusign Envelope ID: 2FA9CEED-4C98-4690-87E7-30804074CDEA

Table Of Contents

Section Description Page Number Section A Solicitation Form 1 Section B Schedule 15 Section C Clauses 61

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

47PK0525R0024

GSA, PBS R9, Acquisition Management Division Simplified Acquisitions Br, San Francisco Sect, 9PQAF 50 United Nations Plaza, Mailbox 9 San Francisco, CA 94102 USA

SOW- USAO – Fiber Cabling dated 11/25/2024

9PQAF

GSA, PBS R9, Acquisition Management Division Simplified Acquisitions Br, San Francisco Sect, 9PQAF 50 United Nations Plaza, Mailbox 9 San Francisco, CA 94102 USA

EQ9PFN-25-0024

9PQAF

Janette Bair NA

N3654013

1 32/19/2025

3/25/2025

1 4:00 PM (PST)

47PK0525R0024, Section A Page 1

JanetteLBair Cross-Out

JanetteLBair Highlight

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

9PQAF

GSA, PBS R9, Acquisition Management Division Simplified Acquisitions Br, San Francisco Sect, 9PQAF 50 United Nations Plaza, Mailbox 9 San Francisco, CA 94102 USA

PBS PAYMENTS BRANCH

P.O. BOX 17181

https://finance.ocfo.gsa.gov/

FORT WORTH, TX 76102-0181 USA

Patrick Dunlavey

47PK0525R0024, Section A Page 2

JanetteLBair Highlight

JanetteLBair Highlight

JanetteLBair Highlight

JanetteLBair Highlight

JanetteLBair Highlight

JanetteLBair Highlight

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

0001 __________

__________1

LSUS Attorney's Fiber Cabling

Provide all labor, supervision, materials, and equipment necessary to install fiber cabling between floors for the US

Attorneys Office Suite located at Matsui Federal Courthouse, 501 I Street, in Sacramento, CA 95814

All work must be done in accordance with the scope of work titled "USAO

Fiber Cabling

Construction wage rates are attached and apply to this contract. They will be updated at award if they change, and the latest rates are publicly available on SAM.gov.

Deliverable

PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS

Contract Type: Firm Fixed Price

PoP: 04/14/2025 - 08/15/2025

Place of Performance: CA0306ZZ ROBERT T MATSUI US COURTHOUSE

501 I ST SACRAMENTO, CA 95814-7300

47PK0525R0024, Section A Page 3

N3654013 USAO Fiber Cabling FY25 JF CA0306 11/25/2024

U.S. GENERAL SERVICES ADMINISTRATION

SAN FRANCISCO SERVICE CENTER

SACRAMENTO FIELD OFFICE

SPECIFICATIONS

For

USAO – Fiber Cabling Robert T. Matsui Federal Courthouse

501 I St.

Sacramento, CA 95814

Table of Contents

1.0 GENERAL

1.1 DESCRIPTION

1.2 POINTS OF CONTACT

1.3 USE OF SITE

1.4 FACE COVERINGS

1.5 QUALITY ASSURANCE

1.6 PROJECT COMPLETION PERIOD

2.0 PRODUCTS

2.1 SCHEDULE SUBMISSION

2.2 SECURITY CLEARANCE REQUIREMENTS AND INFORMATION

3.0 CODES AND STANDARDS

3.1 WORKING HOURS

3.2 CLEAN-UP OPERATIONS

4.0 GOVERNMENT OCCUPANCY

5.0 ROLES AND RESPONSIBILITIES

5.1 GOVERNMENT PARTICIPATION IN THE PROJECT PROCESS

6.0 SAFETY AND HEALTH

6.1 CONSTRUCTION PAYMENTS

7.0 WARRANTY

8.0 EXHIBITS

47PK0525R0024, Section A Page 4

SUMMARY OF WORK

1.0 GENERAL

1.1 DESCRIPTION

The site of this project is the US Attorney’s Office Suite located at the Matsui Federal Courthouse, 501 I Street, in Sacramento, CA.

The intent of this project is to install fiber cabling between floors of the project address. The Matsui Federal Courthouse is owned by the Federal Government and it is not subject to the requirements of the local Building Department. However, all local, state, and federal codes need to be followed.

The contractor shall furnish adequate supervision, labor, materials, supplies and equipment necessary to perform all the services required under this contract in an orderly, timely and efficient manner.

Unless otherwise indicated, items of work are inclusive of, but not limited to, all labor, materials, equipment, traffic control, safety measures, replacement of disrupted improvements, coordination, preparation and accommodation of project constraints (whether specifically identified in these specifications or encountered during the contract) necessary to complete the item in conformance with all applicable governing agency regulations and specifications to the satisfaction of the Government and inspecting agency. Items of work that are necessary to complete the project in accordance with the plans and specifications if any, but that are not specifically called out in the Schedule of Unit Prices, are considered incidental to the project and are not subject to separate compensation.

The project requirements include all engineering, programming, labor, testing, and cleanup.

Proposal The contractor's proposal should include pricing for all items listed below as well as any item the contractor believes will be needed to complete this project. The proposal will need to include a line item break out of pricing for each item listed below.

1. Equipment Cost (if applicable)

2. Labor Rates

3. Materials/Supplies

4. Disposal (if applicable)

5. Overhead & Profit

Design Sufficient drawings, specifications, or notes, and calculations shall be prepared by the contractor to show the extent of work being performed. Documentation provided should allow for adequate inspection of proposed work by the GSA.

Refer to section 8.0 for the design intent exhibit. They provide an indication of the extent and location of the proposed work. The intent of the exhibit is to express design intent and not intended to be a construction document. Contractor shall field verify all conditions and dimensions.

Work Summary

1. Contractor to remove and properly dispose of two existing copper wire runs. The first is from the MDF room 10-105 to the 9th floor IDF room 9-615, approximately 205 lf. The second is from the MDF room 10-105 to the 11th floor IDF room 11-139, approximately 170 lf.

2. Contractor to provide and install plenum rated 12 F, 50 um MultiMode (OM3) fiber optic cable from the 10th floor MDF room to the 9th floor IDF room. Both ends to have a minimum 5-foot service loop. Terminate all ends with LC connectors. Contractor to provide product data sheet for the fiber cabling with proposal.

47PK0525R0024, Section A Page 5

3. Contractor to provide and install plenum rated 12 F, 50 um MultiMode (OM3) fiber optic cable from the 10th floor MDF room to the 11th floor IDF room. Both ends to have a minimum 5-foot service loop. Terminate all ends with LC connectors.

4. During the course of the copper removal and fiber installation, contractor shall ensure that all fire stop material disturbed floor to floor be returned to its initial condition.

5. Once both runs of the fiber optic cabling are installed, contractor to test each line per ANSI/TIA/EIA-526-14-A standards and provide results to GSA.

Full compensation for providing all labor, materials, tools and equipment necessary to meet the above requirements shall be considered included in the contract price and no additional compensation shall be allowed therefore.

1.2 POINTS OF CONTACT

Name Role Building/Agency Office Cell

Margo Jaime PM/COR 650 Capitol Mall/GSA (916) 930-3632 (916) 539-7389

Alisha Decena Building Manager 501 I St./GSA (916) 930-2120 (916) 216-7858

1.3 USE OF SITE

Limit use of the premises to the immediate work area. Do not disturb portions of the Matsui Federal Courthouse beyond the immediate work area. The contractor must repair or replace damage to existing site features caused by construction. Protect the building during the construction period. Keep driveways, loading docks, elevators, elevator entrances, and building entrances clear. These areas are not authorized for parking or material storage without permission. Contractor will schedule deliveries to minimize on-site storage of materials and equipment. The contractor shall designate a representative to receive building materials. Government personnel are not authorized to receive shipments or deliveries upon behalf of a construction contractor.

Work in the Matsui Federal Courthouse will require coordination with the GSA project representative.

Please contact him/her to coordinate arrangements upon behalf of the project.

1.4 FACE COVERINGS

The U.S. General Services Administration (GSA) remains committed to ensuring that proper steps are taken to protect the health and wellbeing of GSA personnel, GSA contractors, and the community in response to the COVID-19 pandemic.

The Centers for Disease Control and Prevention (CDC) recommends wearing cloth face coverings in public settings where social distancing measures are difficult to maintain, especially in areas of significant community-based transmission. Consistent with the CDC’s recommendations, the individuals listed below are required to wear, at a minimum, cloth face coverings: (1) to gain access to property under the jurisdiction, custody, or control of GSA (“GSA-controlled facilities”); and (2) while in GSA-controlled facilities and recommended social distancing measures are difficult to maintain. This Guidance applies to all:

• GSA employees (except the Office of Inspector General and the Civilian Board of Contract Appeals)

• GSA contractors

• All other individuals transacting business with or visiting GSA employees or GSA contractors while on or in GSA-controlled facilities

Contracting Officers may approve exceptions to the face covering requirement for reasons such as impracticality, health, or other bases. A request for an exception must be submitted to the Project Manager and the Contracting Officer prior to entering GSA-controlled facilities.

Contractors who do not wear the required cloth face covering (unless an exception is approved per the above procedure) will not be allowed to participate in the site visit.

47PK0525R0024, Section A Page 6

A cloth face covering should extend above the nose without interfering with eyewear, and below the chin to cover the mouth and nostrils completely. It should fit snugly but comfortably against the sides of the face and be secured (e.g., by being tied in place or with ear-loops). Cloth face coverings should be laundered regularly to maintain good hygiene. Any cloth face coverings supplied by GSA to employees or visitors are the responsibility of the employee or visitor to launder.

These instructions do not alter or supersede the authority of any (a) Federal agency occupying space in a GSA-controlled facility to issue face covering guidance pertaining to its own employees, contractors, or visitors; or (b) Facility Security Committee to implement security measures in a GSA-controlled facility.

1.5 QUALITY ASSURANCE

The contractor shall designate a specific individual as a project/contract manager. The project manager or approved designate will be on site during the time work is performed on this contract.

1.6 PROJECT COMPLETION PERIOD

The work of the project must be completed within 120 days after the notice to proceed is issued by the Contracting Officer. The contractor should anticipate much of the work will be accomplished during normal business hours with minimal distruption the existing office routine.

Completion of work is herein defined as follows: All work specified shall be fully completed per the plans and specification and accepted by the governing agencies, all certifications, as-built plans, and guarantees are submitted to the Government.

The working days specified shall be inclusive of all construction windows, utility energizing, punch list buy-off and final acceptance of all facilities.

The project work shall not be considered complete until these items have been addressed. They are:

a. Published punch-list work items must be corrected in a manner acceptable to the Government.

b. As-built drawings and operations manuals must be made available to the Government.

c. The final payment request accompanied by a release of claims form must be made available to the Government.

2.0 PRODUCTS

The work of this project shall be constructed of new products delivered to the job site in their original unopened, undamaged containers. Provide only products manufactured or specifically recommended to match existing installed components.

Whenever available, products, equipment and materials utilized and installed under this statement of work shall comply with the following energy efficient and eco-friendly standards:

a. Energy-efficient (ENERGY STAR® or Federal Energy Management Program (FEMP)-designated);

b. Water-efficient;

c. Biobased;

d. Environmentally preferable (e.g., EPEAT-registered, or non-toxic or less toxic alternatives);

e. Non-ozone depleting; and/or

f. Made with recovered materials.

47PK0525R0024, Section A Page 7

GSA purchases for products and services must meet sustainable product requirements. Every contractor shall comply with these sustainable product requirements by using products that meet the criteria and standards listed in the PBS Sustainable Product Requirements document at the time of contract award, and or exercise of option modification. The contractor is also responsible for providing sufficient documentation to confirm that the products provided have the required sustainable criteria, upon the Government's request. See attached PBS Sustainable Products Requirements List.

2.1 SCHEDULE SUBMISSION

The contractor shall submit a schedule regarding the work of this project to the Government for review and approval before the work of this project shall begin.

2.2 SECURITY CLEARANCE REQIREMENTS AND INFORMATION

The contractor shall submit a completed Contractor Information Worksheet (CIW) for each employee working on the project to the Zone-D Credentialing Office. In addition, a Requesting Official worksheet must be filled out with each employee working on the contract and sent to the Project Manager for verification. The forms will be provided by the Project Manager, along with further guidance on submittal procedures.

It is the contractor’s responsibility to verify the forms are completed correctly, properly endorsed and dated, and they contain the necessary fingerprint forms. Please note recent history suggests the evaluation of the forms by the Defense Homeland Security Agency (DHS) requires a minimum of nine working days. The actual evaluation time is a function of DHS’s workload. Submit the forms a suitable period in advance of the actual start of work in order to maintain the projected construction schedule. Only those individuals who receive a favorable security response from a DHS will be allowed to work on the project. The submitted security clearance information is maintained in the strictest confidence, and once a favorable report is provided it is valid for a five-year period.

3.0 CODES AND STANDARDS

The contractor shall be responsible for the delivery of a completed project that is operational for its intended use by the building tenants and visitors, fits with its building context and its systems, and its surrounding environment.

The work of this project shall conform to the following codes. They are:

P-100 Facility Standards for the Public Building Service (GSA) UBC Uniform Building Code UL Underwriter’s Laboratory NEC National Electrical Code UMC Uniform Mechanical Code NFPA National Fire Protection Association Title-24 Accessibility Standards, State of California ASHRAE American Society of Heating, Refrigerating and Air Conditioning ADA American Disabilities Act

3.1 WORKING HOURS

The normal hours of operation of the Matsui Federal Courthouse are 7:00 AM to 5:00 PM, Monday through Friday, unless stated otherwise. The work requirements of the project will be scheduled normal busing hours. The parking lot may be available for contractor use and staging during that time period but must be scheduled with the Project Manager in advance.

3.2 CLEAN-UP OPERATIONS

The project site must be left in a clean condition at the conclusion of each work shift to the satisfaction of the tenant and\or Governing Agencies, whichever is more stringent. Once the project has been completed and accepted by the Government, the project site must be thoroughly cleaned and ready for occupancy or use. Contractor shall employee green cleaning practices whenever possible. Payment for final cleanup

47PK0525R0024, Section A Page 8 shall be considered as included in the various contract items and no additional compensation will be allowed, therefore.

4.0 GOVERNMENT OCCUPANCY

Please note the Government will occupy the Federal Building throughout the entire period of construction.

Cooperate fully with the Government representatives during construction operations to minimize conflicts with normal building operations. Circulation within corridors and access to elevators, stairwells, use of occupancy of office suites, and access to the parking lots shall be maintained. Provide necessary barricades, construction tape, and temporary signage as required to define the project site and redirect circulation flow as conditions require.

5.0 ROLES AND RESPONSIBILITIES

The contractor shall be required to coordinate the current project with other ongoing construction activities at the site.

Coordinate with property manager construction work that may generate noise, airborne debris, and odors within adjacent occupied areas. Do not proceed with such work until the project representatives grant approval for such operations. Disruptive construction operations must be conducted before or after standard business hours.

Coordinate seventy-two hours in advance with the project representatives’ disruption of building systems and utilities. Disruptions to these building elements shall be accomplished before or after normal business hours, and restoration of service must be made not later than two hours before the resumption of the next business day.

Supervision: Contractor shall supervise and direct the efficient performance of the Work in accordance with Contractor's best skill, attention and judgment. Contractor shall be solely responsible for the means, methods, techniques, sequences and procedures of construction and shall be responsible to see that the finished Work complies fully and completely with the Contract Documents.

Labor and Workmanship: Where the Contract Documents refer to particular construction means, methods, techniques, sequences or procedures, or indicate or imply that such are to be used on the Work, such mention is intended only to indicate that the operations of Contractor shall be such as to produce the quality of work implied by the operations described, but that the actual determination of whether the described operations may be safely or suitably employed on the Work shall be the responsibility of Contractor, who shall notify the Government in writing of the actual means, methods, techniques, sequences or procedures which will be employed on the Work, if they differ from those mentioned in the Contract Documents. All loss, damage or liability, or cost of correcting defective work arising from the employment of any construction means, methods, techniques, sequences or procedures, shall be borne by Contractor, notwithstanding that such construction means, methods, techniques, sequences or procedures are referred to, indicated in or implied by the Contract Documents. Contractor shall at all times enforce strict discipline and good order among its employees and shall not employ on the Work any unfit person or anyone not skilled in the task assigned to him.

Materials and Equipment: All materials and equipment incorporated into the Work shall be new, unless otherwise specifically provided in the Contract Documents. Materials and equipment not otherwise designated by detailed specifications shall be of the best commercial quality and shall be suitable for the purpose intended. If required by the Government Contractor shall furnish evidence satisfactory to Government as to the kind and quality of materials and equipment. Any material specified by reference to the number, symbol or title of a specific standard such as that of the American Society for Testing Materials (ASTM), a Product or Commercial Standard, Federal Specification or other similar standards, shall comply with the requirements of the dated revisions stated in the Specifications, or where the Specifications contain no revision date, shall comply with the requirements of the latest revision thereof and any supplement or amendment thereto in effect on the date of receipt of bids. The standards referred to, except as specifically modified in the Specifications, shall have the same force as if they were printed in full context within the Specifications.

47PK0525R0024, Section A Page 9

Manufacturers' Instructions: All materials and equipment shall be applied, installed, connected, erected, used, conditioned and cleaned in accordance with the instructions of the respective manufacturer, fabricator or processor, unless otherwise expressly provided in the Contract Documents.

Substitute Materials or Equipment: In the event the Specifications or applicable law, ordinances, rules or regulations permit Contractor to furnish or use a substitute equal in quality to any material or equipment specified, and in the event Contractor wishes to furnish or use any such substitute, Contractor shall, prior to the commencement of construction of the Work, make written application to the Government for approval of such a substitute:

a. Certifying in writing that the proposed substitute will perform adequately all functions called for by the general design, will be similar and of equal substance to that specified and will be suited to the same use and capable of performing the same function as that specified;

b. Stating whether its incorporation in or use in connection with the Project is subject to the payment of any license fee or royalties; and

c. Identifying all variations of the proposed substitute from that specified and indicating available maintenance service.

No substitute whatsoever shall be ordered or installed without the prior written approval of the Government, which approval the Government may give or withhold in its sole discretion and which approval the Government may condition upon Contractor's furnishing such other data about the proposed substitute as the Government may consider pertinent and such performance guaranties and bonds as the Government may require, all at Contractor's sole cost and expense.

Provide protection for existing items to remain within work areas.

Properly dispose of all solid, liquid, and gaseous contaminants in accordance with all local codes and regulations. Comply with all applicable local and state laws, ordinances, and regulation regarding noise control.

5.1 GOVERNMENT PARTICIPATION IN THE PROJECT PROCESS

The Government will participate in the project process in these respects. They are:

a. Review materials submitted by the contractor.

b. Inspect work in progress and convey notice of deficient work items to the Contractor in writing.

c. Provide a final inspection and a final acceptance of the work.

d. Process construction progress (when applicable) and final payments in accordance with contract requirements.

6.0 SAFETY AND HEALTH

All work shall comply with the applicable requirements of 29 CFR 1910/1926 and 40 CFR 761. All work shall comply with applicable local building codes and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply.

The contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work and shall hold the Government harmless for any action on its part or that of its employees or subcontractors that result in illness or death.

47PK0525R0024, Section A Page 10

The contractor shall provide all necessary safety equipment and ensure that such equipment and all relevant safety procedures are adequate for contract performance.

6.1 PROJECT PAYMENT

Typically, one payment is made at completion of the project. If this is not adequate, please request progress payments from the contracting officer. Progress payments will be approved on a case-by-case basis.

7.0 WARRANTY

The contractor warrants materials supplied and work provided under this contract are free from defects.

The contractor shall remedy at his expense any failure to conform to the specifications, defects in material, and unacceptable workmanship. This warranty shall continue for a period of 1 year from the date of final project acceptance.

8.0 Attachments: 1 - 9TH Floor

2 - 10th Floor 3 - 11th Floor

End of Document

Scope of work approved by:

Name / Agency

Signature

Date

47PK0525R0024, Section A Page 11

USAO Fiber Cabling

FLOOR 9

501 I Street

SACRAMENTO, CA

12/6/2024

KEYNOTES:

IDF LOCATION ROOM 9-615

ELECTRICAL CLOSET W/FLOOR TO FLOOR CONDUIT

47PK0525R0024, Section A Page 12

AutoCAD SHX Text

UP

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

TELE

AutoCAD SHX Text

TELE

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

WORKROOM

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

MENS

AutoCAD SHX Text

PUMP RM.

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

MENS

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

STAIR NO.2

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

STAIR NO.3

AutoCAD SHX Text

STAIR NO.1

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

ELEV. LOBBY

AutoCAD SHX Text #5A

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text #5B

AutoCAD SHX Text #5D

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text #5C

AutoCAD SHX Text

FREIGHT ELEV.

AutoCAD SHX Text #4

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

REF.NORTH

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

10-135

FILE

ROOM

USAO Fiber Cabling

FLOOR 10

501 I Street

SACRAMENTO, CA

12/6/2024

KEYNOTES:

MDF LOCATION ROOM 10-105

ELECTRICAL CLOSET W/FLOOR TO FLOOR CONDUIT

ROOM 10-135

47PK0525R0024, Section A Page 13

AutoCAD SHX Text

STAIR NO.2

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

STAIR NO.3

AutoCAD SHX Text

STAIR NO.1

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

ELEV. LOBBY

AutoCAD SHX Text #5A

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text #5B

AutoCAD SHX Text #5D

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text #5C

AutoCAD SHX Text

FREIGHT ELEV.

AutoCAD SHX Text #4

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

REF.NORTH

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

USAO Fiber Cabling

FLOOR 11

501 I Street

SACRAMENTO, CA

12/6/2024

KEYNOTES:

IDF LOCATION ROOM 11-139

ELECTRICAL CLOSET W/FLOOR TO FLOOR CONDUIT

47PK0525R0024, Section A Page 14

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text #5A

AutoCAD SHX Text #5B

AutoCAD SHX Text #5D

AutoCAD SHX Text #5C

AutoCAD SHX Text #4

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

REF.NORTH

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

"General Decision Number: CA20250007 02/07/2025

Superseded General Decision Number: CA20240007

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

Counties: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba Counties in California.

BUILDING CONSTRUCTION PROJECTS (excluding Amador County only);

DREDGING CONSTRUCTION PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); AND HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

2/18/25, 10:11 AM SAM.gov https://sam.gov/wage-determination/CA20250007/2 1/45

47PK0525R0024, Section B Page 16

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 01/10/2025 2 02/07/2025

ASBE0016-001 01/01/2024

AREA 1: MARIN, NAPA, SAN BENITO, SAN FRANCISCO, SOLANO, &

SONOMA COUNTIES

AREA 2: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,

MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,

SISKIYOU, SUTTER, TEHEMA, TRINITY, YOLO, & YUBA COUNTIES

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 84.76 25.07 Area 2......................$ 64.56 25.07

ASBE0016-007 05/01/2024

AREA 1 : ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,

LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,

SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO

& YUBA COUNTIES

AREA 2: MARIN & NAPA COUNTIES

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)

AREA 1......................$ 34.56 11.40

AREA 2......................$ 36.53 9.27

BOIL0549-002 01/01/2021

Rates Fringes

BOILERMAKER

(1) Marin & Solano Counties.$ 49.62 41.27

(2) Remaining Counties......$ 45.60 38.99

BRCA0003-001 08/01/2023

2/18/25, 10:11 AM SAM.gov https://sam.gov/wage-determination/CA20250007/2 2/45

47PK0525R0024, Section B Page 17

Rates Fringes

MARBLE FINISHER..................$ 41.18 18.58

BRCA0003-004 05/01/2024

AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,

LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,

SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES

AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA AND TRINITY

COUNTIES

Rates Fringes

BRICKLAYER

AREA 1......................$ 52.76 25.01

AREA 2......................$ 57.02 28.50

SPECIALTY PAY:

(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.

(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.

(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.

BRCA0003-008 07/01/2023

Rates Fringes

TERRAZZO FINISHER................$ 43.90 19.51

TERRAZZO WORKER/SETTER...........$ 59.06 28.31

BRCA0003-010 04/01/2024

Rates Fringes

TILE FINISHER

Area 1......................$ 35.00 17.44 Area 2......................$ 34.76 19.22 Area 3......................$ 37.75 19.28 Area 4......................$ 35.78 19.23 Tile Layer Area 1......................$ 55.55 21.08 Area 2......................$ 55.17 22.52 Area 3......................$ 59.92 22.62 Area 4......................$ 56.79 22.54

AREA 1: Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Sutter, Tehema, Yolo, Yuba AREA 2: Alpine, Amador AREA 3: Marin, Napa, Solano, Siskiyou AREA 4: Sonoma

BRCA0003-014 08/01/2023

2/18/25, 10:11 AM SAM.gov https://sam.gov/wage-determination/CA20250007/2 3/45

47PK0525R0024, Section B Page 18

MARBLE MASON.....................$ 60.20 28.82

CARP0034-001 07/01/2021

Rates Fringes

Diver Assistant Tender, ROV Tender/Technician...........$ 54.10 34.69 Diver standby...............$ 60.51 34.69 Diver Tender................$ 59.51 34.69 Diver wet...................$ 103.62 34.69 Manifold Operator (mixed gas)........................$ 64.51 34.69 Manifold Operator (Standby).$ 59.51 34.69

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2021

Rates Fringes

Piledriver.......................$ 54.10 34.69

CARP0035-001 08/01/2020

AREA 1: MARIN, NAPA, SOLANO & SONOMA

AREA 3: SACRAMENTO, WESTERN EL DORADO (Territory west of an including highway 49 and the territory inside the city limits of Placerville), WESTERN PLACER (Territory west of and including highway 49), & YOLO

AREA 4: ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN,

LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA,

SISKIYOU, SUTTER, TEHAMA, TRINITY, & YUBA

2/18/25, 10:11 AM SAM.gov https://sam.gov/wage-determination/CA20250007/2 4/45

47PK0525R0024, Section B Page 19

Drywall Installers/Lathers:

Area 1......................$ 52.65 31.26 Area 3......................$ 47.27 31.26 Area 4......................$ 45.92 31.26 Drywall Stocker/Scrapper Area 1......................$ 26.33 18.22 Area 3......................$ 23.64 18.22 Area 4......................$ 22.97 18.22

CARP0035-009 07/01/2020

Marin County

Rates Fringes

CARPENTER

Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41

CARP0035-010 07/01/2020

AREA 1: Marin, Napa, Solano & Sonoma Counties

AREA 2: Monterey, San Benito and Santa Cruz

AREA 3: Alpine, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Sutter, Tehama, Trinity, Yolo & Yuba counties

Rates Fringes

Modular Furniture Installer Area 1 Installer..................$ 28.76 22.53 Lead Installer.............$ 32.21 23.03 Master Installer...........$ 36.43 23.03 Area 2 Installer..................$ 26.11 22.53 Lead Installer.............$ 29.08 23.03 Master Installer...........$ 32.71 23.03 Area 3 Installer..................$ 25.16 22.53 Lead Installer.............$ 27.96 23.03 Master Installer...........$ 31.38 23.03

CARP0046-001 07/01/2023

El Dorado (West), Placer (West), Sacramento and Yolo Counties

Rates Fringes

Carpenters Bridge Builder/Highway

2/18/25, 10:11 AM SAM.gov https://sam.gov/wage-determination/CA20250007/2 5/45

47PK0525R0024, Section B Page 20

Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 54.66 33.52 Journeyman Carpenter........$ 54.51 33.52 Millwright..................$ 57.01 35.11

Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory inside the city limits of Placerville.

CARP0046-002 07/01/2023

Alpine, Colusa, El Dorado (East), Nevada, Placer (East), Sierra, Sutter and Yuba Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 53.31 33.52 Journeyman Carpenter........$ 53.16 33.52 Millwright..................$ 55.66 35.11

CARP0152-003 07/01/2020

Amador County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41

CARP0180-001 07/01/2021

Solano County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49

2/18/25, 10:11 AM SAM.gov https://sam.gov/wage-determination/CA20250007/2 6/45

47PK0525R0024, Section B Page 21

Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP0751-001 07/01/2021

Napa and Sonoma Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP1599-001 07/01/2020

Butte, Glenn, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama and Trinity Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41

ELEC0180-001 06/01/2024

NAPA AND SOLANO COUNTIES

Rates Fringes

CABLE SPLICER....................$ 66.44 3%+27.84

ELECTRICIAN......................$ 59.06 3%+27.83

ELEC0180-003 12/01/2023

NAPA AND SOLANO COUNTIES

Rates Fringes

Sound & Communications Installer...................$ 48.44 27.60 Technician..................$ 55.71 27.82

SCOPE OF WORK INCLUDES-

SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS

2/18/25, 10:11 AM SAM.gov https://sam.gov/wage-determination/CA20250007/2 7/45

47PK0525R0024, Section B Page 22

SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.

EXCLUDES-

Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems.

ELEC0340-002 02/01/2018

ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN,

NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES

Rates Fringes

Communications System Sound & Communications Installer...................$ 29.35 3%+15.35 Sound & Communications Technician..................$ 33.75 3%+15.35

SCOPE OF WORK

Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS

Background foreground music Intercom and telephone interconnect systems, Telephone systems, Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide.

B. FIRE ALARM SYSTEMS

Installation, wire pulling and testing

C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems, Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV

D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems Sonar/infrared monitoring equipment

E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO

THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems Digital Data Systems

2/18/25, 10:11 AM SAM.gov https://sam.gov/wage-determination/CA20250007/2 8/45

47PK0525R0024, Section B Page 23

Broadband and Baseband and Carriers Point of Sale Systems VSAT Data Systems Data Communication Systems RF and Remote Control Systems Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two

(2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.

ELEC0340-003 08/01/2022

ALPINE (West of Sierra Mt. Watershed), AMADOR, BUTTE, COLUSA, EL DORADO (West of Sierra Mt. Watershed), GLENN, LASSEN, NEVADA (West of Sierra Mt. Watershed), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (West of Sierra Mt. Watershed), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES

Rates Fringes

ELECTRICIAN

Remaining area..............$ 45.06 34.09 Sierra Army Depot, Herlong..$ 48.83 18.54 Tunnel work.................$ 41.01 18.54

CABLE SPLICER: Receives 110% of the Electrician basic hourly rate.

ELEC0401-005 01/01/2025

ALPINE (east of the main watershed divide), EL DORADO (east of the main watershed divide), NEVADA (east of the main watershed), PLACER (east of the main watershed divide) and SIERRA (east of the main watershed divide) COUNTIES:

Rates Fringes

ELECTRICIAN......................$ 48.50 23.04

ZONE RATE:

70-90 miles - $10.00 per hour 91+ miles - $15.00 per hour

ELEC0551-004 06/01/2024

MARIN AND SONOMA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 59.17 32.04

2/18/25, 10:11 AM SAM.gov https://sam.gov/wage-determination/CA20250007/2 9/45

47PK0525R0024, Section B Page 24

ELEC0551-005 12/01/2024

MARIN & SONOMA COUNTIES

Rates Fringes

Sound & Communications Installer...................$ 51.59 28.20 Technician..................$ 59.33 28.43

SCOPE OF WORK INCLUDES-

SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .