This is a Justification and Approval (J&A) document for a sole source procurement under FAR 12.102(a) and FAR 13.501(a). The General Services Administration's White House Service Center is procuring emergency leak and gutter repair services for the Winder Building from DJB Contracting, Inc. (UEI: KM1KVDZ8JUF9) without full and open competition. The Winder Building's façade on the 17th Street side, which is highly visible to the public and the Executive Office of the President Building, is experiencing severe staining due to ongoing leaks from the existing gutter system at eight locations. The repair work includes gutter section replacement and drain connection repair or replacement to eliminate the leaks and prevent further façade damage.
The justification for sole source procurement is based on DJB Contracting, Inc.'s unique qualifications: they previously conducted the study that identified the leak sources and possess specialized knowledge necessary to perform emergency repairs quickly and accurately. Additionally, the contractor has over 10 years of experience in restoration and roofing repairs for historic buildings, including those designated as National Historic Landmarks and listed on the National Register of Historic Places (NRHP), to which the Winder Building belongs. Market research was conducted identifying limited available vendors, but only DJB Contracting possessed the specific capability and experience to address the requirement in a timely manner. The authority for other than full and open competition derives from 41 U.S.C. 3304(a)(1) as implemented by FAR Subpart 6.302-1 (Only One Responsible Source). The document was signed on 11/16/2026 by Contracting Officer Adrian Jackson and Contracting Officer's Representative Aimee Latour. The specific estimated dollar value is redacted in the document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
revised 08/26/2024
JUSTIFICATION AND APPROVAL (FAR 12.102(A), FAR 13.501(a))
Emergency NTP Leak & Gutter Repair Winder Building
1. Contracting Agency and Activity. The General Service Administration, White House Service Center plans to contract by means other than full and open competition. Select one option below.
☐ Brand Name Justification X Sole Source Justification (SSJ)
If SSJ, Annotate the following: Vendor Name: DJB Contracting, Inc UEI: KM1KVDZ8JUF9
2. Nature of Action Being Approved & Description of Supplies or Services
The current condition of the Winder Building Façade is stained badly due to ongoing leaks from the existing gutter system in eight locations. The sources of the leak were identified by the recommended vendor during a previous study. The intent of this project is to make the necessary repairs to the gutter system and all associated components (gutter section replacement and drain connection repair/replacement) to stop the leak and ultimately stop the façade from staining. The staining/ongoing leak is located on the 17th street façade that is highly visible to the public and the EEOB from across the street.
3. Estimated Dollar Value: The government estimate is
4. An identification of the statutory authority permitting other than full and open competition (FAR
FAR 12.102(A),)
The statutory authority permitting other than full and open competition is 41 U.S.C. 3304(a)(1) as implemented by the Federal Acquisition Regulation (FAR) Subpart 6.302-1 entitled, Only One
Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements.
5. A statement demonstrating the unique qualifications of the proposed contractor or the nature of the action requiring the use of the authority (FAR 12.20-2(b)(5))
This is an urgent and compelling requirement. DJB Contracting, Inc. has extensive knowledge of how to repair the leak quickly and accurately because they previously conducted the study that identified the sources of the leak. This knowledge and previous experience makes them the only vendor who could perform these emergency repairs successfully and in a timely fashion, which is critical due to the emergency nature of the leak.
Additionally, DJB Contracting, Inc. has 10+ years of experience with the restoration and roofing/repairs of historic buildings. Their experience with historic restoration and roofing/repairs includes buildings and sites that are recognized as US Secretary of State's Registrar of Culturally Significant Properties, UNESCO World Heritage Sites, and National Historic Landmarks, as well as the National Register of
Historic Places (NRHP). The Winder Building belongs to the NRHP and therefore DJB
Contracting, Inc. is uniquely qualified to perform the repairs to the Winder Building gutter systems and associated components.
6. . A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by FAR 5.2 and, if not, which exception under FAR 5.202 applies (FAR FAR 12.102(A), Multiple offers were not solicited due to the specialized ability and knowledge of the proposed vendor:
DJB Contracting, Inc. They are uniquely qualified to perform these emergency leak/gutter repairs, and no other offers will be made.
7. Determination by the contracting officer that the anticipated cost to the government will be fair revised 09/09/2024 2 and reasonable (FAR FAR 12.102(A),)
8. A description of the market research conducted (see FAR Part 10) and the results or a statement of the reason market research was not conducted (FAR FAR 12.102(A),)
Market research was conducted by the White House Service Center to identify available sources and to evaluate the availability of the marketplace to meet the requirement as follows: Based on the results of market research, the government determined that a limited number of vendors were/are available to perform the emergency repairs - but only one possesses the capability, specific knowledge and experience to accurately address the leak in a timely fashion.
9. Any other facts supporting the use of other than full and open competition (FAR 6.303-2(b)(9))
10. A listing of any sources that expressed a written interest in the acquisition (FAR 6.303-2(b)(10))
11. A statement of any actions the agency may take to remove or overcome any barriers to competition, if subsequent acquisitions are anticipated (FAR 12.102(A),)
The Government will continue to conduct thorough market research to gauge the marketplace capabilities for future requirements. The Government will seek competition for future acquisitions for these (products or services) in non-emergent cases.
12. Research to support the facts presented for the justification above
13. CERTIFICATIONS (See, FAR Part 6.304 for approval thresholds and FAR Part 6.305 for 6.305 availability of the justification)
Technical/Requirements Personnel: I certify the requirement meets the Government’s minimum need and that the facts, representations, and data included in this justification are complete and accurate.
Signature (Project Manager) Date
Name: ____________________________
Title: _____________________________
Signature (Contracting Officer’s Representative) Date
Name: ____________________________
Title: _____________________________
Contracting Officer: I certify that the data supporting the recommended use of other than full and open competition is accurate and complete to the best of my knowledge and belief.
Signature Date
Name: ____________________________
Title: _____________________________
Adrian Jackson Contracting Officer
Contracting Officer's Representative Aimee Latour
11/16/2026 revised 09/09/2024 3
| 2026-11-16T13:36:21-0500 | |
| AIMEE LATOUR |
File details come from the government source that posted it. Updated .