This document is a Solicitation Amendment for Solicitation Number 47PJ0024R0067 to replace approximately 2,300 square feet of colored concrete sidewalk at the U.S. Courthouse in Sioux Falls, South Dakota. The amendment provides answers to various questions submitted by potential offerors, including the ability to move stone barricades, coordination with the city, and the potential for after-hours work to avoid disrupting courthouse operations. It confirms the work consists of demolition, jack-hammering, and concrete replacement, and clarifies that damage to adjacent concrete not being replaced will need to be repaired at the contractor's expense. The amendment also provides additional details on the project scope and solicits acknowledgement of the amendment from offerors prior to the proposal due date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
KristenCFeickert Highlight
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Solicitation 47PJ0024R0067, Replace Colored Concrete Plaza Sidewalk, Federal Courthouse, Sioux Falls, South Dakota
Amendment 0001. Questions and Answers:
A. Questions and Answers:
1) Please provide site visit list.
ANSWER:
2) Please confirm work consisting of jack-hammering, demolition, or other “loud work that may interrupt court proceedings…” will need to take place outside of normal working hours / afterhours work.
ANSWER: It is possible after hours work will be possible if court proceedings are taking place, the court schedule is unknown this far in advance and subject to change daily. It may be possible to schedule work while no proceedings are being held. The contractor will need to coordinate with GSA to limit any disruptions to the Federal Courthouse operations. There are events that take place through downtown Sioux Falls as well that may need to be considered.
3) Please confirm “Section 11: Bading and Security Requirements (Vendor Fitness Determination Training Manual)” is to be followed and documented even though the site is located in a public / non secure area.
ANSWER: This requirement can be waived if contractors only access public space.
4) Large stone barricades on the east (and west) sidewalk entrances to the Plaza were observed during the site walk. Are these stone barricades permitted to be moved during construction to allow construction traffic / concrete trucks to back up to the location?
ANSWER: The stones are movable and the contractor will be responsible for moving them, contractor is responsible for any damage caused by moving them.
Concrete trucks are not allowed on the plaza concrete sidewalks or sidewalks adjacent to the street. Contractor shall take care not to damage concrete with heavy equipment.
5) As this location in a “public plaza”, will the contractor need to work with any other local agencies (ex: the city) for proper permitting or scheduling?
ANSWER: This has not been required in the past, but it is recommended that the contractor check with the city. Contractor will need to have utilities located.
6) It has been observed that more than the highlighted concrete area (on the SOW) shows signs of deterioration. Can the owner either confirm 2,300 sq ft is the correct amount or give a exact amount of sq footage for contractors to bid the same quantity of concrete replacement?
ANSWER: In accordance with the statement of work, approximately 2300 square feet are be replaced starting at the east end of the marked picture going west. The GSA property line is roughly center of the plaza from north to south. End point should stop at an existing panel separation. A site visit is recommended to verify quantities and assess the site conditions.
7) As SOW 6), d. states “remove existing concrete so as to not spall or crack adjacent concrete”, the surrounding damaged concrete that is not to be included in pricing could unintentionally be disturbed when removing the concrete that is to be included.
ANSWER: Contractor will need to prevent damage to adjacent concrete to the fullest extent possible. Any damage caused will be repaired at the contractor’s expense.
| topmostSubform[0]: |
| Page2[0]: |
| TextField1[5]: |
| TextField1[2]: |
| TextField1[1]: |
| TextField1[4]: |
| TextField1[3]: |
| TextField1[0]: |
| Page1[0]: |
| Code[0]: 8PQ |
| Copies[0]: |
| CheckBox9[0]: 1 |
| Code[2]: |
| NameandTitleOfficer[0]: |
| Is[0]: Off |
| CheckBox10[0]: Off |
| NameandAddress[0]: |
| DateSigned[1]: |
| Pages[0]: 2 |
| AmendmentNo[0]: 0001 |
| Dated10B[0]: |
| ModificationNo[0]: |
| AdministeredBy[0]: |
| FacilityCode[0]: |
| CheckBox13B[0]: Off |
| CheckBox13D[0]: Off |
| ReqNumber[0]: EQ8PSMMS-24-0027 |
| Dated9B[0]: 4/18/2024 |
| C13[0]: |
| Description[0]: Project: Replace Colored Concrete Plaza Sidewalk, Federal Courthouse, Sioux Falls, South Dakota |
This amendment provides answers to questions received. See attached for details.
| NotExtended[0]: 1 |
| Code[1]: |
| AmendmentNo[1]: 47PJ0024R0067 |
| ContractIDCode[0]: |
| DateSigned[0]: |
| CheckBox11[0]: 1 |
| Page[0]: 1 |
| AccountingData[0]: |
| CopiesReturned[0]: |
| CheckBox13A[0]: Off |
| IsNot[0]: Off |
| EffectiveDate[0]: 5/6/2024 |
| A13[0]: |
| ProjectNo[0]: |
| CheckBox13C[0]: Off |
| Extended[0]: Off |
| D13[0]: |
| IssuedBy[0]: GSA PBS Acquisition Division 8PQ |
1 Denver Federal Center PO Box 25546, Building 41 Denver, CO 80225-0546 USA NameandTitleSigner[0]:
File details come from the government source that posted it. Updated .