Solicitation Amendment 47PJ0024R0031_0001.pdf
PDF 2 MB Posted
- Solicitation number
- 47PJ0024R0031
About this file
This document provides an amendment to a solicitation for ceiling repair and painting services in a federal courtroom. The general contractor will be required to repair damaged plaster and paint an estimated 500 square feet of ceiling as well as 2,160 square feet of ceiling and walls in Courtroom 1 of the United States Courthouse in Sioux Falls, South Dakota. Work must be completed during designated daytime hours unless the area can be closed off. The General Services Administration is the contracting agency, and photographs and room dimensions are provided to assist offerors. Questions from potential contractors are answered regarding work hours, scope of repair work, areas to be painted, furniture relocation, and warranty requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Solicitation 47PJ0024R0031, Ceiling Repair and Paint in Courtroom 1, US Courthouse, Sioux Falls, SD
Amendment 0001. Questions and Answers:
A. Questions and Answers:
1) Designated work hours are between 7am-5pm but with any work needing performed overhead people can’t be in the vicinity as it’s a liability. Not to mention the products smell. Can work be performed after hours and over the weekend when closed? If not, can the area be closed off during construction?
ANSWER: The area will be closed off during the project duration. Note requirement in Sections 8 and 9 of Statement of Work for Construction IAQ Management Plan to address indoor air quality.
2) Where stated in SOW to skim coat 500 square feet of damaged ceiling is that the total square footage of the ceiling that is to be repaired and painted or is that just a section of the entire ceiling?
ANSWER: The 500 sq feet is an estimated amount of total area, the damage is not in one specific location. See pictures below for example of damage. Contractor to verify all measurements.
3) It’s also stated that 2160 square footage of ceiling and walls is to be painted the same color to match. So is it the ceiling and all the walls in courtroom 1 that’ll be painted? If so, how many colors?
ANSWER: Ceiling and walls above woodwork in Courtroom 1 will all be painted same color. See pictures below.
4) Where will listed furniture need to be relocated to?
ANSWER: There is space on the same floor where furniture will be stored, see plan below.
5) The Focus of the project, as stated, is to repair damaged areas and prevent further cracking.
Repairing cracked and pealing plaster and paint is manageable but guaranteeing the prevention of further cracking is not possible. The building will continue to settle, shift, and move, inevitably cracking will occur again as it has in the past. Whenever you deal with organic construction materials, wood sheetrock plaster ectera, there will always be expansion and contraction from hot and cold temperatures. Are we expected to warranty against cracking all the same?
ANSWER: Reference FAR clause 52.246-21, Warranty of Construction, for warranty information.
6) Could pictures or rough dimensions be provided for the majority of us that can’t make the site visit. For a project of this scale pictures would go a long way to providing accurate estimates.
ANSWER: Room is approximately 47’ x 37’ x 19’. See pictures below.
| Amendment 0001 Q&A.pdf |
| 1) Designated work hours are between 7am-5pm but with any work needing performed overhead people can’t be in the vicinity as it’s a liability. Not to mention the products smell. Can work be performed after hours and over the weekend when closed? If no... |
| ANSWER: The area will be closed off during the project duration. Note requirement in Sections 8 and 9 of Statement of Work for Construction IAQ Management Plan to address indoor air quality. |
| 2) Where stated in SOW to skim coat 500 square feet of damaged ceiling is that the total square footage of the ceiling that is to be repaired and painted or is that just a section of the entire ceiling? |
| ANSWER: The 500 sq feet is an estimated amount of total area, the damage is not in one specific location. See pictures below for example of damage. Contractor to verify all measurements. |
| 3) It’s also stated that 2160 square footage of ceiling and walls is to be painted the same color to match. So is it the ceiling and all the walls in courtroom 1 that’ll be painted? If so, how many colors? |
| ANSWER: Ceiling and walls above woodwork in Courtroom 1 will all be painted same color. See pictures below. |
| 4) Where will listed furniture need to be relocated to? |
| ANSWER: There is space on the same floor where furniture will be stored, see plan below. |
| 5) The Focus of the project, as stated, is to repair damaged areas and prevent further cracking. Repairing cracked and pealing plaster and paint is manageable but guaranteeing the prevention of further cracking is not possible. The building will conti... |
| ANSWER: Reference FAR clause 52.246-21, Warranty of Construction, for warranty information. |
| 6) Could pictures or rough dimensions be provided for the majority of us that can’t make the site visit. For a project of this scale pictures would go a long way to providing accurate estimates. |
| topmostSubform[0]: |
| Page2[0]: |
| TextField1[5]: |
| TextField1[2]: |
| TextField1[1]: |
| TextField1[4]: |
| TextField1[3]: |
| TextField1[0]: |
| Page1[0]: |
| Code[0]: 8PQ |
| Copies[0]: |
| CheckBox9[0]: 1 |
| Code[2]: |
| NameandTitleOfficer[0]: |
| Is[0]: Off |
| CheckBox10[0]: Off |
| NameandAddress[0]: |
| DateSigned[1]: |
| Pages[0]: 10 |
| AmendmentNo[0]: 0001 |
| Dated10B[0]: |
| ModificationNo[0]: |
| AdministeredBy[0]: |
| FacilityCode[0]: |
| CheckBox13B[0]: Off |
| CheckBox13D[0]: Off |
| ReqNumber[0]: EQ8PSMMS-24-0014 |
| Dated9B[0]: 2/13/2024 |
| C13[0]: |
| Description[0]: Project: Ceiling Repair and Paint in Courtroom 1, US Courthouse, Sioux Falls, SD |
This amendment provides answers to questions received. See attached for details.
| NotExtended[0]: 1 |
| Code[1]: |
| AmendmentNo[1]: 47PJ0024R0031 |
| ContractIDCode[0]: |
| DateSigned[0]: |
| CheckBox11[0]: 1 |
| Page[0]: 1 |
| AccountingData[0]: |
| CopiesReturned[0]: |
| CheckBox13A[0]: Off |
| IsNot[0]: Off |
| EffectiveDate[0]: 3/5/2024 |
| A13[0]: |
| ProjectNo[0]: |
| CheckBox13C[0]: Off |
| Extended[0]: Off |
| D13[0]: |
| IssuedBy[0]: GSA PBS Acquisition Division 8PQ |
1 Denver Federal Center PO Box 25546, Building 41 Denver, CO 80225-0546 USA NameandTitleSigner[0]: