This document outlines the base requirements for asbestos abatement projects in North Dakota for the General Services Administration. Key details include:
-
Asbestos abatement work must be conducted by a licensed North Dakota contractor in accordance with OSHA, EPA, and state regulations. Negative air machines must exhaust to the exterior and odors must be controlled. Clearance sampling will be conducted by an independent industrial hygienist.
-
The related federal contract opportunity is a pre-solicitation notice for a small business set-aside to remove and replace carpet and paint walls at a Senate office in Bismarck, ND between $25,000-$100,000. A site visit is scheduled for February 22nd and offers are due March 4th. The work must follow Buy American Act requirements and personnel must comply with HSPD-12 security directives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scope of Work 47PJ0024R0030.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. General Services Administration
Rocky Mountain Region 8 Public Buildings Service Office of Facilities Management - Industrial Hygiene Group
One Denver Federal Center, Building 41 Denver, CO 80225
GSA Region 8 PBS ND Asbestos Abatement Base Requirements Version 1.0, April 2021 Page 1
GSA BASE ASBESTOS ABATEMENT REQUIREMENTS
STATE OF NORTH DAKOTA
NOTE: This document provides the minimum (base) GSA requirements for all asbestos abatement activities in the State of North Dakota. Specific requirements for the disturbance or removal of asbestos containing materials may vary due to field conditions, types or quantities of involved asbestos materials, proposed abatement methodologies, etc. For project-specific requirements please consult with the GSA OFM Industrial Hygiene Group for guidance.
1. PROJECT OBJECTIVES
1.1. The contractor shall provide all labor, materials, equipment and supervision necessary to perform abatement of the asbestos-containing materials (ACM).
2. PERMITTING/REGULATIONS/CODES
2.1. Contractor shall be responsible for obtaining all necessary local, state, and federal permits and licenses and payment of related fees.
2.2. Contractor shall comply with all applicable federal, state, and local regulations including but not limited to:
2.2.1. Occupational Safety & Health Administration (OSHA) Asbestos in Construction Standard - 29 CFR 1926.1101
2.2.2. OSHA Asbestos in General Industry Standard – 29 CFR 1910.1001
2.2.3. OSHA Respiratory Protection Standard - 29 CFR 1910.134
2.2.4. U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAP) - 40 CFR 61 Subpart M
2.2.5. EPA Asbestos Hazard Emergency Response Act (AHERA) - 40 CFR 763
2.2.6. Federal Management Regulation, Real Property, Safety and Environmental Management, Asbestos -
41 CFR 102-80.15
2.2.7. U.S. Department of Transportation Hazardous Material Transportation Regulations – 49 CFR 171 and
2.2.8. North Dakota Administrative Code Chapter 33-15-13 Emission Standards for Hazardous Air Pollutants
2.2.9. North Dakota Century Code Chapter 23-25 Air Pollution Control
2.3. All work shall comply with codes and standards applicable to each type of work through the course of this project. The contractor shall also comply with the requirements of GSA BuildGreen standards, and PBS P- 100.
Office of Facilities Management - Industrial Hygiene Group
Version 1.0, April 2021 Page 2
3. ASBESTOS ABATEMENT REQUIREMENTS
3.1. General
3.1.1. All regulated asbestos abatement activities shall be conducted by a North Dakota licensed asbestos abatement contractor in good standing with North Dakota Department of Environmental Quality (NDDEQ) & North Dakota Department of Health (NDDH) and utilizing properly trained and certified asbestos abatement supervisors and workers.
3.1.2. Contractor shall field verify all conditions, requirements, and quantity of asbestos containing material (ACM) to be abated at time of pre-bid walk through.
3.1.3. Contractor to coordinate schedule of work with the GSA Building and Project Manager. Asbestos abatement shall be performed during off-hours.
3.2. Abatement Work Practices and Control Requirements
3.2.1. All asbestos abatement work shall follow applicable State of North Dakota requirements of North Dakota Administrative Code 33-15-13-02 and OSHA Asbestos in Construction Standard requirements of 29 CFR 1926.1101.
3.2.2. Contractor shall not seek or apply for any variance or alternative work procedures from any authority having jurisdiction (AHJ) unless previously approved in writing by GSA. Once approved by GSA, Contractor may request a variance or alternative work procedures in writing from any AHJ and must receive written approval from the AHJ prior to the commencement of abatement activities. Written AHJ approval of any variance or alternative work procedures shall be provided to GSA.
3.2.3. Negative air machine (NAM) exhaust shall be exhausted to the exterior of the building. If it is not practicable for the NAM to be exhausted to the exterior of the building, additional air sampling at the point of exhaust may be required.
3.2.4. Contractor shall take care to control the generation of odors in occupied buildings. If mastic remover is utilized, product shall be low odor and meet California Air Resources Board (CARB) volatile organic compound (VOC) content requirements.
3.2.5. Final visual clearance and air sampling will be conducted by a third-party qualified industrial hygienist independent of the asbestos abatement contractor. Final air clearance sampling shall be done in accordance with the clearance criteria of 40 CFR 763.90(i)(5). GSA reserves the right to prescribe specific sampling protocols type based on abated material and building occupancy.
3.2.6. If the area does not pass final visual inspection or final air clearance sampling, the abatement Contractor shall re-clean the area at no additional cost, and the process will be repeated until clearance is achieved.
Office of Facilities Management - Industrial Hygiene Group
Version 1.0, April 2021 Page 3
3.3. Asbestos-Containing Waste Material Disposal Requirements
3.3.1. Transportation and disposal of friable and non-friable asbestos-containing waste material shall be conducted in accordance with all applicable requirements including but not limited to North Dakota Administrative Code 33-15-13-02; 40 CFR 61.150; and 49 CFR Parts 171 & 172.
3.3.2. Asbestos-containing waste material shall be properly packaged, labeled, manifested, and transported.
4. SUBMITTAL AND DELIVERABLE REQUIREMENTS
4.1. Asbestos Abatement Specific Pre-Abatement Submittals
4.1.1. Prior to the commencement of asbestos abatement actions, the Contractor shall provide the following documentation to GSA for review and approval:
4.1.2. Contractor shall provide a written method of procedure (MOP) describing the following at a minimum:
4.1.2.1. Statement of contractor’s qualifications and copies of the firm’s relevant licenses or certifications, as applicable
4.1.2.2. Types, quantities, and locations of asbestos materials to be removed
4.1.2.3. Engineering controls and work methods to be employed
4.1.2.4. Number and types of regulated areas (e.g., glove bag, full containment, mini-enclosure, etc.)
4.1.2.5. Project phasing and tentative schedule
4.1.2.6. Name and address of disposal facility
4.1.2.7. Copies of safety data sheets (SDSs) for all chemical products to be used etc.
4.1.3. Copy of 10-day notification and/or permit to the appropriate authorities (e.g., EPA, NDDEQ, local fire department, etc.). If notification and/or permit are not required, the Contractor shall state why.
4.2. Asbestos Abatement Specific Close-Out Deliverables
4.2.1. Upon completion of abatement activities, the Contractor shall provide the following documentation in a closure report:
4.2.1.1. A written statement by the asbestos abatement contractor on their company letterhead describing the abatement activities, types, quantities and location of asbestos containing material abated, controls and work methods that were used, waste bagging and handling, and name and address of disposal facility.
Office of Facilities Management - Industrial Hygiene Group
Version 1.0, April 2021 Page 4
4.2.1.2. Copy of 10-day notification and/or permit to the appropriate authorities (e.g., EPA, NDDEQ, local fire department, etc.). If notification and/or permit are not required, the abatement contractor shall state why.
4.2.1.3. Copies of current certification and/or licenses for all asbestos supervisors and workers working onsite.
4.2.1.4. OSHA-required respirator fit testing and medical clearance documentation for each person entering the regulated area.
4.2.1.5. Copies of personal air monitoring data or supporting Negative Exposure Assessment
(NEA).
4.2.1.6. Legible copies of all daily logs.
4.2.1.7. Legible copies of the final signed waste manifests or other shipping documentation.