This document contains questions and answers related to the Pembina Wind Turbine Demolition and Remediation federal contract opportunity issued by the General Services Administration Public Buildings Service Region 8. Key details include that the contractor will demolish and remove an existing wind turbine tower and dispose of associated components, with the exception of the transformer which will be retained by GSA. The contractor can leave equipment onsite and a work trailer for the duration of the project. Safety measures such as traffic control and drop zone planning will be required. Power is not readily available so the contractor must bring a generator, which can also remain onsite. Recycling documentation is encouraged but not mandatory.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1- What are the actual working hours? 24hrs a day 2- Do we need to have a Job trailer on site? No 3- Is Lead abatement required for the existing Wind Turbine to be disposed of? No 4- Civil was mentioned on the site walk for the access road to the turbine.

a- Can we leave equipment on the site or will it need to be moved daily? Equipment can be left onsite.

b- Will the dirt moved from access road need to be put back on road when site completed, or can it be used to backfill over turbine area?? The levee elevation will need to be maintained. Roads will be put back to original grade.

5- Being the GSA is now keeping the transformer, yes does the GSA want the conduits as well or are conduits to be disposed of? Dispose of Condit.

6- Is a Porta John going to be able to be left on working site? Yes 7- How far down is the concrete to below ground level? See Plans 8- The area to the northeast and east side is an area to be not touched. Is there a required grass seed to be planted over concrete area once concrete is removed? Standard native Grasses.

9- Do you know the actual weight of the entire tower? See SOW 10-Will the GSA assist in the removal of the transformer to be kept by the GSA? We have a location for it to be stored. Contractor will perform work.

11- Will we be able to leave a crew work trailer on site or does it need to be taken with us everyday? Work Trailer can be left onsite.

12- Who will de-energize the main power from the main transformer to transformer at the turbine? Otter Tail Power will decide this.

a- A lady at Otter Tail Power stated they will need confirmation from the site owner.

13- Do you know the exact weight of the top head unit? No 14- When removing all the concrete will we be able to have multiple dumpsters on site? The GSA will work with the contactor within reason without impeding regular day to day operations 15- Per drawings on page #9, it talks about a Silt Fence.

a- Where exactly is this to be added if any? These are the drawings for installing the tower not for the demolition.

16- Is power readily available or is subcontractor required to obtain a generator? Power is not available a- Can Generator be left on site for duration of project? yes 17- The generator and hydraulic pump to be removed a- Are they in working order? Unknown b- Where are they located? Onsite Storage area

18- The contractor shall establish a traffic route with the Property Manager to avoid public contact, using best management practices.

a- Once this is established are cones, caution tape, signage and flagger required? See

SOW

19- The contractor shall remove the pad mount and transformer at the location of the wind tower and turn it over to a GSA representative or agency. The ION 7550 meter that monitors the wind turbine will need to be decommissioned.

a- Where is the pad mount? onsite b- Will the ION 7550 meter be left with GSA? no

20- The contractor shall develop a drop zone plan and utilize GSA property for this to occur. Once the drop plan is developed this will determine whether or not, we need the temporary use of adjacent private property.

a- In the event the adjacent property is needed, will the GSA talk to landowner? TBD 21- Recycle documents are not required but encouraged for GSA records.