Solicitation Amendment 47PJ0021R0069_0002.pdf

PDF 734 KB Posted

Attached to
Install Second Floor Corridor Ceiling and Lighting Federal contract opportunity
Solicitation number
47PJ0021R0069
Issued by
General Services Administration Public Buildings Service Region 8

View the file

Other files for this federal contract opportunity

Other files attached to Install Second Floor Corridor Ceiling and Lighting, newest first.
File Type Posted
Solicitation Amendment 47PJ0021R0069_0001.pdf PDF
C201 Solicitation 47PJ0021R0069.pdf PDF
C301 Reps and Certs 47PJ0021R0069.pdf PDF
SF 1442 47PJ0021R0069.pdf PDF
C101 Agreement 47PJ0021R0069.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

Solicitation No. 47PJ0021R0069, Install Second Floor Corridor Ceiling and

Lighting, Federal Building/US Courthouse, Rapid City, SD

Amendment 0002 statement of work revised 5/26/21:

1. Under Agreement, Attachment 1 – Scope of Work, Section 5: Project

Objectives, 3) Products:

ADD: Add pre-approved light fixture, basis of design light fixtures: Elite Lighting

Architectural LED Recessed Linear o Note: Substitutions are allowed, but must be GSA-approved

2. Under Agreement, Attachment 1 – Scope of Work, Section 5: Project

Objectives, 3) Products:

DELETE: Delete the following from section 3 paragraph g) i. 3. a., light fixture key attributes: lighted intersections (+, T, L shapes), Perimeter mounting (bracket and wall rail)

3. Under Agreement, Attachment 1 – Scope of Work, Section 5: Project

Objectives, 3) Products:

ADD:

• Add to section 3, paragraph h: install six (6) return air grilles o 6” x 24” return air grilles, 3/16" holes and approximately 51% free area o The grilles will be installed within the ceiling grid layout o The grilles shall be powder coated, in a color to match the ceiling grid o Exact location of grilles to be coordinated on site with GSA.

4. Under Agreement, Attachment 1 – Scope of Work, Section 5: Project

Objectives, 4) Execution:

ADD:

• Add to section 4, paragraph e: Coordinate with security camera contractor throughout duration of project

• Add to section 4, paragraph f: Recertify fire alarm system

5. REPLACE original drawing with attached new drawing:

Summary of changes:

• Remove all perimeter lighting, as shown on updated drawing

• Update quantities for transverse lighting, as shown on updated drawing

• Update quantities for ceiling grid, as shown on updated drawing

SCALE: 1/16" = 1'-0"

CEILING PLAN

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, OR

SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED. Do not remove this notice. Properly destroy documents when no longer needed.

CONTRACTOR SHALL FIELD VERIFY ALL SITE CONDITIONS AND MEASUREMENTS.

SEE SPECIFICATIONS FOR FURTHER INSTRUCTIONS.

JohnRiker Callout

REMOVE & REPLACE CEILING & LIGHTING TO EXTENT SHOWN

JohnRiker Callout

NO WORK IN THIS AREA

JohnRiker Callout

NO WORK IN THIS AREA

JohnRiker Callout

NEW LIGHTING, TYP

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Rectangle

JohnRiker Date

JohnRiker Cloud

topmostSubform[0]:
Page2[0]:
TextField1[5]:
TextField1[2]:
TextField1[1]:
TextField1[4]:
TextField1[3]:
TextField1[0]:
Page1[0]:
Code[0]: 8PSMMS
Copies[0]:
CheckBox9[0]: 1
Code[2]:
NameandTitleOfficer[0]:
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 4
AmendmentNo[0]: 0002
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]:
FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ8PSMMS-21-0027
Dated9B[0]: 4/29/2021
C13[0]:
Description[0]: Project: Install Second Floor Corridor Ceiling and Lighting, Federal Building/US Courthouse, Rapid City, SD

The statement of work is amended to change scope requirements. See attached for details. Proposal due date remains June 15, 2021 at 12 noon CDT as extended by Amendment 0001.

Reference Item 11 above for acknowledgement of this amendment.

NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PJ0021R0069
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 5/27/2021
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: GSA, PBS

FEDERAL BUILDING, 115 4TH AVE SE, RM 120

ABERDEEN, SD 57401 USA

NameandTitleSigner[0]:

File details come from the government source that posted it. Updated .