Q and A 47PJ0021R0031.pdf
PDF 13 KB Posted
- Attached to
- Install New Acoustical Ceiling, Light Fixtures and New Supply Air Diffusers, Federal Building, Aberdeen, SD
- Solicitation number
- 47PJ0021R0031
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C201 Solicitation 47PJ0021R0031.pdf | ||
| C301 Reps Certs 47PJ0021R0031.pdf | ||
| C101 Agreement 47PJ0021R0031.pdf | ||
| SF 1442 47PJ0021R0031.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 47PJ0021R0031, Install New Acoustical Ceiling, Light Fixtures and New
Supply Air Diffusers, Federal Building, Aberdeen, SD
A. Questions and Answers:
1. Can you please confirm that the actual Subcontractor quotes need to be provided within the proposal submission?
Answer: No. Actual subcontractor quotes do not need to be included, just identified in the required cost breakdown as a subcontractor quote.
2. What is the required manufacturer for the ceiling grid and tile? Please provide a manufacturer and material model numbers and or a specification.
Answer: Reference C101 Agreement, Attachment 1, Section 5, paragraph A.1 on page of 28 of
48. There is not a required manufacturer.
3. Will the work area be occupied?
Answer: No.
4. What are the working hours for this project?
Answer: Reference C101 Agreement, Attachment 1, Section 10, paragraph 1 on page of 31 of 48 (after normal work hours for this building are 5:00 PM to 7:00 AM).
5. How many ceiling lighting light fixtures are to be removed? What is the desired new light fixture? Please provide a specification.
Answer: Reference C101 Agreement, Attachment 1, Section 5, paragraph A.1 on page of 29 of
48. Contractor shall verify all site conditions and measurements.
6. How many new supply diffusers are required? What is the desired diffuser? Please provide a specification.
Answer: Reference C101 Agreement, Attachment 1, Section 5, paragraph A.1 on page of 29 of
48. Contractor shall verify all site conditions and measurements.
7. Are the funds presently available for the award of the solicitation?
Answer: Reference C201 Solicitation, Section III.A.
8. How long does it take to get security clearances?
Answer: Allow a minimum of 30 days for badging and clearance process, which varies dependent on action of the contractor.
B. The period for questions and answers is now closed.