Solicitation No. 47PJ0021R0031, Install New Acoustical Ceiling, Light Fixtures and New

Supply Air Diffusers, Federal Building, Aberdeen, SD

A. Questions and Answers:

1. Can you please confirm that the actual Subcontractor quotes need to be provided within the proposal submission?

Answer: No. Actual subcontractor quotes do not need to be included, just identified in the required cost breakdown as a subcontractor quote.

2. What is the required manufacturer for the ceiling grid and tile? Please provide a manufacturer and material model numbers and or a specification.

Answer: Reference C101 Agreement, Attachment 1, Section 5, paragraph A.1 on page of 28 of

48. There is not a required manufacturer.

3. Will the work area be occupied?

Answer: No.

4. What are the working hours for this project?

Answer: Reference C101 Agreement, Attachment 1, Section 10, paragraph 1 on page of 31 of 48 (after normal work hours for this building are 5:00 PM to 7:00 AM).

5. How many ceiling lighting light fixtures are to be removed? What is the desired new light fixture? Please provide a specification.

Answer: Reference C101 Agreement, Attachment 1, Section 5, paragraph A.1 on page of 29 of

48. Contractor shall verify all site conditions and measurements.

6. How many new supply diffusers are required? What is the desired diffuser? Please provide a specification.

Answer: Reference C101 Agreement, Attachment 1, Section 5, paragraph A.1 on page of 29 of

48. Contractor shall verify all site conditions and measurements.

7. Are the funds presently available for the award of the solicitation?

Answer: Reference C201 Solicitation, Section III.A.

8. How long does it take to get security clearances?

Answer: Allow a minimum of 30 days for badging and clearance process, which varies dependent on action of the contractor.

B. The period for questions and answers is now closed.