47PH0822R0008 SF30 - Amendment 0001 - Q and A - AE Oklahoma.pdf

PDF 235 KB Posted

Attached to
Supplemental Architecture and Engineering Services for Oklahoma
Solicitation number
47PH0822R0008
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is required to sign this document and return copies to the issuing office.Contractor is not

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

CODE6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

7PQA

ACQUISITION MANAGEMENT DIVISION

ACQUISITION PROGRAM SUPPORT BRANCH

819 TAYLOR ST RM 12B01

FORT WORTH, TX 76102 USA

ACQUISITION MANAGEMENT DIVISION

ACQUISITION PROGRAM SUPPORT BRANCH

819 TAYLOR ST RM 12B01

FORT WORTH, TX 76102 USA

1 3

9A. AMENDMENT OF SOLICITATION NUMBER

47PH0822R0008

4. REQUISITION/PURCHASE REQUISITION NUMBER

EQ7PCA-22-0006

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The Purpose of this Amendment is to provide questions and answers (Q&A) that were submitted through email or asked in the Preproposal Conference held on April 12, 2022 at 10a.m. CST for Synopsis/Solicitation Number 47PH0822R0008. All other terms and conditions remain in full force and effect.

3. EFFECTIVE DATE

04/13/2022

9B. DATED (SEE ITEM 11)

04/13/2022

Amendment 0001 – Q&A – A/E Oklahoma Attendees:

Dani McDonald – Stanley Consultants

Chuck Kuzma – Stanley Consultants

Tylora Falls – Stanley Consultants

Laird Fisher – Benham Design, LLC

Robert Burton – Benham Design, LLC

Vanessa Whitehorse – Hartman+Majewski Design Group

Jeff Zellner – Hartman+Majewski Design Group

Kathy Smith – Cyntergy

Vincent Pedraza – CMTA MEP Engineers

Ashley Schnetzer– ecoPreserve

Tracy Richard - Kennedy Architects

Heather Root - Kennedy Architects

Alicia Wohl – GH2 Architects

Katy Hall –GH2 Architects

Nick Schreiber -SLA Architects

Questions:

1. Q-Who is the incumbent of this IDIQ Contract?

A-POND FSB

2. Q-Are you aware of the SBA size standard changes and is going to impact this procurement or NAICS Code?

A-Will not impact because it is open to all business.

3. Q-Please clarify the cascading method.

A-Proposals received from small businesses will be evaluated first to determine whether there are at least three small businesses capable of performing the requirement. If the evaluation board concludes that there are less than three technically acceptable proposals from small businesses, then the board will evaluate all the proposals received, including any technically acceptable proposals received from small businesses.

4. Q-Has the cascading method been used before?

A-Yes.

5. Q-Will there be three awards for this contract?

A-No, this is a single award contract.

6. Q- Are there any sustainability requirements or goals in the scope of work?

A-It is something that is graded favorably in the evaluation but there is no stand-alone feature. It is blended into other evaluation criteria.

7. Q- Will the attendees list be available?

A-Yes. Please see the top of this page.

8. Q- Why is the requirement placed under the Architectural Services NAICS code

(541310) and not under Engineering Services NAICS (541330)?

A-At this time the NAICS code will remain what is in the current solicitation. The current

NAICS code is 541310 - Architectural Services. In the past we have had engineering firms be the prime and teamed with architects, but the engineering firm would have to have the 541310 NAICS in its SAM profile. Engineering firms acting as the prime contractor may subcontract with architect firms, but the prime contractor must have the

541310 NAICS code in their SAM Registration and meet the small business size standard for it.

9. Q-Can you speak to the 35% of the work being performed from within the geographical delineated areas of the contract?

A-The firm should demonstrate knowledge of local conditions within the geographical area including tactical, operational, strategic issues for all areas of construction related to the key disciplines as well as design and bidding. This will include everything from supply, labor force, and weather to the local construction climate’s impact on cost estimating. Discuss how key team members can conduct pre-design site review of the proposed work without incurring extra cost to the government for travel.

10. Q-Are you okay with Teaming Arrangement within the geographical delineated areas?

A-Teaming and JV are acceptable but must be clear stated in proposal/SF330 submissions.

11. Q-The synopsis, page 5, requires us to include Resumes of Key Personnel Proposed for this Contract. It states that “Only a few individuals in the lead firm and prime consultants will work with the GSA team members on a regular basis. GSA considers these individuals as the ‘Key personnel’.” The synopsis includes examples including the

Project Manager, Primary Spec Writer and Constructability Coordinator, Historic

Preservation Specialist, Prime: Civil Engineer; it also states that the Lead Architectural

Designer, Lead Engineering Designer, and the Primary Point of Contact are explicitly required. In order to provide equitable evaluation between Offerors, we request that GSA provide additional definition of which positions, exactly, are considered “Key

Personnel”. Are the three explicit positions (Lead Architectural Designer, Lead

Engineering Designer and Primary Point of Contact) the only ones required?

A-Key Personnel is anyone who will be directly involved in providing the contract services and have direct responsibility for accomplishing the task orders. Important team members or consultants that would have a primary but not regular role can be placed after the initial “KEY” designation. It is only required that you include the Lead Architectural

Designer, Lead Engineering Designer and the Primary Point of Contact that would be responsible for managing this contract and assigning task orders in Section E. It is recommended that personnel directly responsible for work submitted in Section F should also be included in Section E.

File details come from the government source that posted it. Updated .