Amendment 0001 RFQ 47PH0621R0019.pdf
PDF 207 KB Posted
- Attached to
- GALLUP FEDERAL BLDG- Fire Alarm System Upgrade
- Solicitation number
- 47PH0622R0019
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is required to sign this document and return copies to the issuing office.Contractor is not
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
R10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
is not extended.The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
CODE6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
GENERAL SERVICES ADMINISTRATION (7PQC)
NON PROSPECTUS BRANCH
819 TAYLOR ST. RM 12B1
FORT WORTH, TX 76102
SAME AS BLK 6
Tiffany Weber-Supervisory Contracting Officer
3. EFFECTIVE DATE
06/30/2022
9A. AMENDMENT OF SOLICITATION NUMBER
47PH0622R0019
9B. DATED (SEE ITEM 11)
05/24/2022
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0001: The purpose of this amendment is - Incorporate the attach revised RFI. The proposal due date has not been extended and will remain NLT Tuesday, July 12, 2022 by 4:00PM CT.
All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
4. REQUISITION/PURCHASE REQUISITION NUMBER
EQ7PACS-22-0084
PAGE OF PAGES
1 5
Gallup Fire Alarm RFI’s
1. Are there as-built fire alarm plans for purposes of confirming new locations vs existing?
Answer: There are no as-builts.
2. Are there as-built ductwork (HVAC) plans to reference the smoke dampers to confirm how many are tied into the new FA system?
Answer: No, this is to be confirmed with job walk
3. Is there an asbestos report to provide?
Answer: Floor tiles and Boiler Flue have been identified as containing Asbestos
Per Asbestos Building Re-Inspection Gallup Federal Building Dated 2019, “Non-ACM Materials This category includes materials that were considered suspect and were sampled during this re- inspection or during prior surveys and were not found to be asbestos containing:
Acoustical ceiling tile and ceiling tile mastic, wallboard (sheetrock) joint compound, texturing, duct insulation, sealants (white), cove base and mastic, mechanical pipe fittings, insulation, roof drain insulation, domestic water fitting insulations. plaster, and caulking.”
4. The mastic on the suspended acoustic tile could potentially be hot. Will GSA abate? Or is this to be part of the scope of work?
Answer: Asbestos Abatement is not part of this work.
Per Asbestos Building Re-Inspection Gallup Federal Building Dated 2019, “Non-ACM Materials This category includes materials that were considered suspect and were sampled during this re- inspection or during prior surveys and were not found to be asbestos containing:
Acoustical ceiling tile and ceiling tile mastic, wallboard (sheetrock) joint compound, texturing, duct insulation, sealants (white), cove base and mastic, mechanical pipe
5. The existing generator is not tied into the FA system. Is the generator to be tied into the FA system?
Answer: No the fire alarm system will not be tied into the generator.
6. Currently the building has a combination of surface mounted and in the wall conduit. Is exposed/surface mounted conduit acceptable throughout?
No: See item 7 below
7. If all conduits cannot be surface mounted, then provide a floor plan showing which walls are masonry vs gyp board.
Answer: The intent is that conduit be concealed above the ceiling, any exceptions would be reviewed on a case-by-case basis. It should be clarified that the use of FMC or MC cable is permitted to be used above hard ceilings as noted on dwg FA-1 General Note 11.
8. In lieu of patching the gyp board, can cover plates be used and painted to match existing walls as they are currently? Answer: Yes
9. The conduit is called for red painted conduit. Is it to be painted to match the wall like it currently is or is it to remain “red”?
Answer: The intent is that conduit be concealed above the ceiling, any exceptions would be reviewed on a case-by-case basis. It should be clarified that the use of FMC or MC cable is permitted to be used above hard ceilings as noted on dwg FA-1 General Note 11.
10. The new system is to be fully functional before disconnecting and removing the existing system. The Lobby has granite walls with a pull station and an annunciator. How are these areas to be patched once the new system is operational?
Answer: these specific devices mentioned are to be replaced in the same location. Conduit & wire are to be run to the location and these devices will be exchanged just prior to new system testing.
11. GSA will need two additional phone lines to operate the new system. Is this anticipated?
Answer: use existing phone lines
12. Is GSA carrying a contingency for inflation? Answer: GSA is asking you to bid the project,
13. Fire Alarm Plans Sheet FA-1 general note 2 lists all wiring to be 14 AWG FPLP 2 Conductor cable. This is not a typical requirement for fire alarm systems, typical for SLC is 16 AWG, can cabling be sized based on voltage drop calculation requirements? Answer: No
14. Fire Alarm Plans Sheet FA-1 general note 5 “Voice intelligibility will be field verified”
Document C101-SB-GC/October 2020, the agreement, page 4 “provide a minimum common intelligibility scale rating of 0.07.” What is the preferred measurement clarification (DB, Dba?)/tools. What are the documentation requirements of the measurements recorded?
Answer: Dba will be measured with a decibel meter. Intelligibility will be measured with a speech intelligibility meter.
15. Fire Alarm Plans Sheet FA-1 General Note 15 states new pull station to be installed in same location as existing pull station. Scope of work 9.2.1.2 states no portion of the existing building fire alarm system shall be permanently taken out of service until the new fire alarm system has been installed tested and accepted by the GSA Fire Protection Engineer. Which directive should we follow?
Answer: these specific devices mentioned are to be replaced in the same location. Conduit & wire are to be run to the location and these devices will be exchanged just prior to new system testing.
16. Fire Alarm Plans Sheet FA-2 office 113 No smoke detector shown on plans, NFPA 72 requires a smoke detector mounted above the FACP. Do you want one added?
Answer: These plans are conceptual; it is the contractors job to provide a complete system following all code requirements as well as these contract bid documents (dwg’s and specifications.
17. Fire Alarm Plans Sheet FA-2 mechanical space by corridor 107 shows 2 AHU smoke detectors. 3 Duct detectors are currently installed, one per duct. Maintain what is on the plans or install 3 Duct detectors?
Answer: FA-1 shows a smoke detector in the air plenum of the air handler unit.
18. Fire Alarm Plans Sheet FA-2 telephone equipment 103B no smoke shown on plans. Existing building has a smoke detector installed in room. Install a new one?
Answer: No
19. Fire Alarm Plans Sheet FA-2 Lobby, Pull station is located more than 5’ from egress doors.
Install new pull station as plans show or as code dictates?
Answer: Pull stations in the lobby are to be installed in same locations as existing.
20. Fire Alarm Plans Sheet FA-2 No smokes are shown in the elevator pit, install for proper elevator alternate floor operation?
Answer: Do not put a smoke detector in the pit.
21. Fire Alarm Plans Sheet FA-2 HVAC smoke detector detail shows smoke detector installed in duct. Can industry standard Duct Detectors be used in lieu of shown detail?
Answer: Details show the smoke detector inside the air plenum of the air handler. This is the preferred method, however if for some reason this cannot be done this way due to physical constraints or possibly a humidifier setting off the smoke detector a duct detector will be fine.
22. Fire Alarm Plans Sheet FA-2 Tamper switch shown outside of mechanical room in parking structure. What is this for, there were no existing valves on the suppression system?
Answer: Please note that these dwgs are to communicate a design intent and are not shop dwgs. In this case we may have an extra device. Please note that the contractors are responsible for a complete fire alarm system following all NFPA 72 requirements as well as these dwgs. and specifications.
23. Fire Alarm Plans Sheet FA-3 Soils building and Laboratory, can a NAC extender and NODE be added in this building to limit circuit lengths?
Answer: Yes
24. Fire Alarm Plans Sheet FA-4 Penthouse, there is only one speaker strobe shown on plans.
Document C101-SB-GC/October 2020, I.A. project summary states “provide two (2) speaker/strobes minimum for all elevator machine and mechanical rooms.” As the penthouse contains the elevator equipment and controls shall we add another speaker strobe to this space?
Answer: Yes
25. Will any local or State AHJ’s be involved in the commissioning of this project, or will it just be the GSA Fire protection engineer? Answer: GSA FPE is the AHJ
26. The Fire alarm plans do not show heat detection in any of the janitor’s closets or mechanical rooms we usually suggest at a minimum those spaces in an un-sprinkled building. Would you be opposed to us adding detection in these areas?
Answer: Do not add heat detectors
27. Construction Scope of Work 9.1.5.2 states “The services of a NICET Level III Fire Alarm
Systems Technician currently certified on the system to be installed by the fire alarm control equipment manufacturer and a full-time employee of the installer for a minimum of 3 years shall be provided to supervise installation, adjustments, and tests of the fire alarm system. This technician shall be in attendance at all times during system installation including the installation of the conduit and fire alarm wiring.” Is your intention for us to have a NICET III on-site 40 hours a week during the subcontract electrical rough-in stage? Or will a verification/inspection of the systems conduit installation throughout the install process be acceptable?
Answer: A Nicet Level III technician shall be onsite throughout the install. Remember that FMC or MC cable can be used above hard ceilings.
28. The glue used to adhere the ceiling tiles to the suspended ceiling throughout the building is assumed to be containing asbestos. Will a hot test be performed? And who will be responsible to perform the abatement in locations that require new devices to be installed?
Answer: The only areas identified as having asbestos were floor tiles and boiler flue.
Per Asbestos Building Re-Inspection Gallup Federal Building Dated 2019, “Non-ACM Materials This category includes materials that were considered suspect and were sampled during this re- inspection or during prior surveys and were not found to be asbestos containing:
Acoustical ceiling tile and ceiling tile mastic, wallboard (sheetrock) joint compound, texturing, duct insulation, sealants (white), cove base and mastic, mechanical pipe
29. Is surface mounted conduit acceptable? Answer: No; See Item 7.
30. What are the security clearance level requirements for this project? Answer: Contractor will follow HSPD-12 Security Clearances as stated in the SOW and contractors IDIQ contract.
31. Will this project require a firefighter phone or BDA system? Answer: No