Scope of Work

View the file

Other files

File Type Posted
SF30-Amendment_3.pdf PDF
SF30-Amendment_3.pdf PDF
SF30-Amendment_2.pdf PDF
SF30-Amendment_1.pdf PDF
vendor_fitness_manual.pdf PDF
C301_GC_Reps_&_Certs.docx DOCX document
PBS_3490.2.pdf PDF
PBS_Past_Performance_Form_Rev_6_12_15_(1).docx DOCX document
Sample_Bid_Schedule.xlsx XLSX spreadsheet
Solicitation_&_Agreement.pdf PDF
GSA527-15b.pdf PDF
LA45_12Jan18.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. General Services Administration

Public Buildings Service

Greater Southwest Region

1 Boggs FBCH Fire Sprinkler Upgrades (45138) SOW v5 01/15/2016

January 26, 2018

Scope of Work

1. Project Title: Boggs FBCH Fire Sprinkler Upgrades - 45138

2. Project Location: LA0085

Hale Boggs 500 Poydras St.

New Orleans, LA 70130

3. Building Location Hours: Contractor may work, normal hours, after hours, or weekend but must ensure Fire Safety of tenants

4. Purpose: GSA is requesting a sprinkler rework of the Hale Boggs building’s sprinkler system. The sprinkler rework will consist of correcting sprinkler spacing deficiencies and replacing standard response heads with quick response heads. GSA will provide an inspection survey performed by a registered professional fire protection engineer that identifies and lists deficient areas to assist the Sprinkler contractor to correct the known sprinkler findings in the bldg.

5. Points of Contact:

5.1 Contracting Officer: Stephan Harris

819 Taylor Street Fort Worth, TX 76102 Phone #: 817-978-0106

5.2 Project Manager: Ryan Smith

500 Poydras St. Suite 1040 New Orleans, LA 70130 Phone #: 504-218-2937

5.3 Other: John Mancuso

224 So Boulder Ave Tulsa OK 74103 Phone #: 817-978-0053

6. Notice to Proceed:

6.1 The Contracting Officer is the ONLY individual from the Government that can give the contractor a notice to proceed.

6.2 Before any of the work within the scope of the contract is started, the Contractor shall confer with the COR (Contracting Officer Representative) and agree on a sequence of procedure; means of access to premises and building; delivery of material and use of approaches; use of corridors, stairways, elevators, and similar means of communications; and the location partitions, eating spaces for spaces for Contractor’s employees and the like.

Greater Southwest Region

2 Boggs FBCH Fire Sprinkler Upgrades (45138) SOW v5 01/15/2016

6.3 Contractor shall provide a work schedule within 7 days of receipt of the Notice to Proceed.

7. Period of Performance: The total period of performance for this contract is 455 calendar days inclusive of required security clearances, pre-work submittals, and material ordering and receipt.

8. Description of Work: Contractor shall provide all materials, labor, tools, equipment and supervision to accomplish tasks as outlined in contractor documents.

DESCRIPTION:

The Hale Boggs Building, constructed in 1976, is approximately 600,000 gross square feet.

The building consists of two structures, an East building and a West building. The East building is 14-stories, has a basement, sub basement and is approximately 350,000SF. The West building is 6-stories, has a basement and penthouse. The two buildings are connected at the basement, levels 1 through 3 and a skywalk on level 6.

The building generally has recessed, standard response sprinkler heads, though a mixture of concealed, recessed and pendent sprinklers are used throughout the common areas.

Upright heads are located in the mechanical spaces and the parking garage. Institutional heads are located within the holding cells on floor 6 in the West building. For the most part, the sprinkler system is properly installed and spaced but through the years, renovations sometimes occurred with little attention to the sprinkler system.

SCOPE OF WORK:

A qualified, licensed fire sprinkler contractor shall inspect, bid and perform corrections as indicated on the inspection survey.

Specific sprinkler concerns are spacing, omission, and obstruction. Other issues may be the removal of old, recalled heads, recessed heads located too far in or out, inappropriate use or mixed sprinkler heads (pendent for upright, upright for a pendent, wrong temperature, quick response in an area of ordinary response, etc) and use of double escutcheon style heads, which are to be replaced due to aesthetics.

The contractor shall remove and dispose of all removed sprinklers. Replace all standard response sprinklers with quick response sprinklers. Threadable light wall/thin wall pipe, Flex heads, and double escutcheons shall not be used. The building will be occupied; therefore a majority of this work shall be performed at night. Care and caution shall be exercised when performing work, especially in the Courts area. Debris and dust from each evening’s activities shall be cleaned at the end of each work night. Any damaged tiles shall be replaced.

All sprinkler work is to be per the latest edition of NFPA 13. GSA does not allow use of the small room rule. The GSA Fire Protection Engineer (FPE) is the Authority Having Jurisdiction (AHJ) for all technical issues relating to Fire Protection and shall be the sole interpreter of all Codes, Standards and design guides. All construction crews shall work directly under the supervision of their NICET Level IV Technician/Forman.

Greater Southwest Region

3 Boggs FBCH Fire Sprinkler Upgrades (45138) SOW v5 01/15/2016

9. Liquidated Damages: $138 per day

10. Sustainability: [Please refer to spec 01130 Section 1.4 Sustainability for All requirements, at a minimum the following will be required.]

10.1 Green Purchasing: See attachment 1: green purchasing requirements

10.2 Waste Diversion: Fourteen days from Notice to Proceed, the Contractor shall submit to the Project Manager an updated Non-Hazardous Solid Waste Management Plan attachment 2: Waste Diversion Plan, to include (not limited to):

a) List of materials Contractor will reuse

b) List of materials the Contractor will donate and name and address of donation recipient.

c) List of materials the Contractor will recycle and the name and address of the recycler. If Contractor receives recycling revenue, Contractor shall keep revenue and provide receipt for GSA for reference.

d) Name and location of solid waste landfill for non-diverted material.

11. Other Requirements: All Federal, State and Municipal applicable Fire and Life Safety requirements

12. Submittal:

12.1 Waste Diversion Submittal: Preconstruction

12.2 Waste Diversion Submittal: Post Construction

12.3 Green Purchasing items

12.4 As Built Drawings

12.5 Product Manufacturer’s information

12.6 Schedule

12.7 Estimate

13. Attachments: [The following items will become part of the Scope of Work.]

13.1 Attachment 1: Green Purchasing

13.2 Attachment 2: Waste Diversion Plan

13.3 Fire Life Safety Requirements Addendum

14. Closeout Plan:

14.1 Customer Acceptance

14.2 Final Punch list complete

14.3 Financial Closeout

4 Boggs FBCH Fire Sprinkler Upgrades (45138) SOW v5 01/15/2016

Attachment 1: Green Purchasing

Sustainability:

Green Purchasing:

o The contractor shall refer to the “Green Procurement Compilation” for all products being installed in federal facilities. The Green Procurement

Compilation can be found at https://sftool.gov/greenprocurement. The standards found in this compilation shall guide all product purchasing decisions as they relate to federal facilities.

o The use of the following standards (“Key Sustainable Product” or “KSP” standards) is mandatory for all contracts and task orders. See https://sftool.gov/green-products/1037/key-sustainable-products for more details.

Nylon Carpet: NSF 140 Gold certification and > 10% post-consumer recovered content.

Interior Latex Paint: < 50 grams per liter (g/L) VOCs post tint (i.e.

SCAQMD Rule 1113 standard).

Gypsum Board: Greenguard Gold Standard or 0 g/L VOCs.

Acoustical Ceiling Tiles: Meets California Section 01350 standard for low-VOC materials and total recycled content > 20% and recyclable in a closed loop process and USDA Certified BioPreferred and

Environmental Product Declaration (EPD) available.

Concrete (ready-mix and site-mix): > 25% fly ash or > 15% ground granulated blast-furnace (GGBF) slag

A. For each KSP listed, the Contractor shall submit proof of compliance to the CO or his designee prior to the installation of the product or material. The CO’s designee shall verify compliance.

B. If the KSP materials listed above are 1) not reasonably available within a reasonable period of time; 2) fail to meet the performance standards set forth in the specification or fail to meet reasonable performance standards of GSA; or 3) are available only at an unreasonable price, only then can the Contractor use other types of products. In these cases the Contractor shall select products and materials, to the extent possible, which are the safest and most environmentally friendly. Exemptions must be submitted in writing and can only be approved by the CO.

5 Boggs FBCH Fire Sprinkler Upgrades (45138) SOW v5 01/15/2016

Attachment 2: Waste Diversion Plan

1. Submital Type: Pre-Construction or Final (Circle Appropriate Type)

2. ePM Number: ___________________ (Should receive from GSA PM)

3. Field Office: Circle Appropriate Field Office: (Oklahoma City, Tulsa, New Mexico, Little

Rock, Shreveport, Tyler, New Orleans, Baton Rouge, Dallas, Fort Worth, Lubbock, Houston, Austin, San Antonio, McAllen, El Paso)

4. GSA Project Manager: _________________

5. Contract Number:______________________

6. Categories to Track:

6.1 Carpet: (rolled or tiled) Weight(lbs):_____ Recover Method:___________

6.2 Architectural:(doors,windows,frames,millwork) Weight(lbs):_____ Recover Method:___________

6.3 Ferrous Metals: (structural steel, studs, rebar) Weight(lbs):_____ Recover Method:___________

6.4 Non-Ferrous: (wire, piping, duct) Weight(lbs):_____ Recover Method:___________

6.5 Aggregate: (concrete,brick,blocks) Weight(lbs):_____ Recover Method:___________

6.6 Plumbing Fixtures: (sinks,toilets,urinals) Weight(lbs):_____ Recover Method:___________

6.7 Furniture: (Systems, casual, equip.) Weight(lbs):_____ Recover Method:___________

6.8 Ceiling/Wall: (gypsum, tiles) Weight(lbs):_____ Recover Method:___________

6.9 Roofing: (Shingles, Paper, membrane) Weight(lbs):_____ Recover Method:___________

7. Landfill Hauler:___________________

8. Landfill Waste:____________________