OSH Findings

View the file

Other files

File Type Posted
The_Agreement.pdf PDF
SF1442_47PG0419R0006__Form.pdf PDF
SOW_OSH_Remediation_dated_02_12_2019.pdf PDF
The_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States General Services Administration Heartland Region Public Buildings Service (6PET) Two Pershing Square 2300 Main Street Kansas City, Missouri 64108

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

Do not remove this notice. Properly destroy documents when no longer needed.

OSH Equipment Survey & Safety Study

Building IA0027ZZ US Courthouse

131 East 4th Street Davenport, Iowa 52801

Submission: Final Report, Revision 1

December 20, 2018 GSA Contract Number: GS-06P-15-GZ-D-7000

Architect:

Etegra, Inc.

1121 Olivette Executive Parkway Suite 100 Olivette, MO 63132

(314) 533-2200

Safety Consultants:

Haines, Janson & Associates PO Box 510396 St. Louis, MO 63151

(314) 845-3516

OSH Equipment Survey & Safety Study – Final Report U.S. Courthouse, Davenport, Iowa

1121 Olivette Executive Parkway, Suite 100, Olivette, Missouri 63132 December 20, 2018 Page 1

TABLE OF CONTENTS

1.0 Overview of Existing Building

2.0 Project Summary

3.0 Corrective Actions Summary

4.0 Summary Scope of Work

Appendices Appendix A – Corrective Actions List Appendix B – Engineering Judgements Appendix C - Corrective Action Drawings

December 20, 2018 Page 2

EQUIPMENT SURVEY & SAFETY STUDY - FINAL REPORT

December 14, 2018

Revision 1, December 20, 2018

1.0 OVERVIEW OF EXISTING BUILDING

The U.S. Courthouse is located at 131 East Fourth Street, at the southwest corner of Perry and East Fourth streets in downtown Davenport, Iowa. The U.S. Courthouse is a 79,853 GSF, 3-story federal building with a structural steel frame and concrete floor slabs. The federal building has a nearly rectangular footprint, which results in a box-like form with a flat roof. The exterior walls are clad in a warm beige Minnesota Kasota Travertine limestone ashlar with a base of dark gray polished granite. The building is detailed with stripped-down Classical elements such as fluted carvings and low relief spandrels.

The U.S. Courthouse was originally constructed from 1932-1933 as a post office and courthouse. After the first renovation in the 1960s, which converted the former postal facilities into offices, there were additional renovations during the 1970s and 1990s. Between 2003 and 2005, the building was renovated under GSA's Design Excellence program. The project, which converted the building to a dedicated courthouse facility, included the construction of two new courtrooms, restoration of the historic courtroom, and renovation of the first-floor lobby

The principal facade faces north onto East Fourth Street and is the most elaborate of the four elevations.

This elevation is nine bays wide on the first story, with two entrances. The south elevation, facing a public alley, is utilitarian in character. The east elevation, facing Perry Street, and west elevation, facing a private alley, are nearly identical. Lacking entrances, these elevations are less elaborate than the principal elevation. A recessed loading platform occupies a seven-bay wide area of the elevation, resulting in a U-shaped footprint with two wings. The building contains courtrooms, judge’s chambers, 4 elevators, (1 judge’s,1 prisoner, 1 public, and one 2-stop freight [i.e., basement to 1st floor]) with surface parking.

Building Code Information

Use and Occupancy Classification:

Mixed use occupancy consisting predominantly of business, assembly and ordinary contents storage uses. A non-separated mixed-use occupancy approach is permitted for this building.

Construction Classification:

NFPA Type II (222); IBC Type IB 3 stories plus basement, two mezzanine levels and the roof.

Fully sprinklered. Rated corridors are not required per NFPA 101, 38.3.6.1(3) for business and 12.3.6(3) for assembly.

The Davenport U.S. Courthouse is arranged with three stairwells.

2.0 PROJECT SUMMARY

In January 2018, the GSA field office notified the Regional Safety Specialist that multiple pieces of equipment do not have safe access for regular maintenance. The Regional Office issued a work order to perform a field survey to document safety deficiencies throughout the building and develop corrective actions.

In June 2018, Etegra, Inc. performed a site survey along with Haines Janson & Associates safety consultants. Several deficiencies were documented and discussed with GSA. Additional field work was

December 20, 2018 Page 3 performed in October 2018 to identify several additional items and to gather information to further develop the corrective actions.

3.0 CORRECTIVE ACTIONS SUMMARY

Sixteen individual items have been identified for corrective action. These are classified as walking/working surface items. Corrective actions will provide appropriate safe access to the equipment.

A spreadsheet of deficiencies can be found in Appendix A. Each item is identified with a unique finding number. The abbreviations used identify the type and general location of the deficiency.

Example: xx-OSH-##

First letter/number group: Floor Level. R indicated roof level. 1M and 3M are mezzanine maintenance levels located above the first and third floors, respectively.

Second letter group: Deficiency type. OSH = Occupational Safety & Health Deficiency Third group: Sequential numbering of deficiencies found. Numbers may be skipped, as some items have been removed from the final scope of work.

Appendix B contains engineering judgment pages for each deficiency, including a photograph of the location and a recommended corrective action.

4.0 SUMMARY SCOPE OF WORK

Appendix C contains drawings identifying the location of each deficiency using the finding number.

Additional drawings are included for some items to describe the suggested corrections. Below is a narrative description of the work required for each corrective action.

1. Cooling Towers (R-OSH-01, R-OSH-01A, R-OSH-01B)

New self-closing gates are required at three (3) maintenance platforms to close the gap in the railing system.

a. Provide new galvanized pipe metal self-closing gate at maintenance platform. Match existing railing system.

2. Fan on Ductwork near AHU-3M (3M-OSH-04)

The existing catwalk system is to be extended to provide maintenance access to this equipment.

a. Remove existing railing as required for extension of catwalk.

b. Provide a new galvanized metal grating platform suspended from existing building structure to match elevation of existing catwalk.

c. At new platform provide 42” high pipe rail guardrail with intermediate rails. Provide galvanized steel angle at base of platform to provide 4” minimum height guard plate above top of grating.

3. VAV Box above Room 356 – Women’s (3M-OSH-04A)

December 20, 2018 Page 4

This VAV box is located above the existing gypsum board ceiling. A new access panel will be installed to accommodate an extension ladder placed at the recommended slope or angle required by OSH. A small platform will be installed at VAV box level, approximately 5’ above the ceiling.

a. Remove existing gypsum board and suspension system as required for new work.

b. Provide a new galvanized metal grating platform suspended from existing building structure. Field verify height required.

c. At new platform provide 42” high pipe rail guardrail with intermediate rails. Provide galvanized steel angle at base of platform to provide 4” minimum height guard plate above top of grating.

d. Provide a new access panel to accommodate extension ladder access at OSH required angle.

e. Provide new gypsum board ceiling and suspension system to match existing ceiling.

f. Paint access panel and new gypsum board ceiling to match the existing ceiling.

4. VAV Box above Room 358 – Men’s (3M-OSH-04B)

The existing catwalk system is to be extended to provide maintenance access to this equipment.

a. Remove existing railing as required for extension of catwalk.

b. Provide a new galvanized metal grating platform suspended from existing building structure to match elevation of existing catwalk.

c. At new platform provide new 42” high pipe rail guardrail with intermediate rails. Provide galvanized steel angle at base of platform to provide 4” minimum height guard plate above top of grating.

5. VAV Box above Room 312G – Prison Property (3M-OSH-04E)

The access panel in the secure ceiling is broken and cannot be opened. Repair or replace the existing access panel.

a. Remove existing secure ceiling to verify location of the VAV box.

b. Repair existing access panel if possible and if this provides the required access to the VAV box.

c. If repair is not possible, or required access is not provided, remove existing access panel and provide new access panel to access VAV box.

d. Provide new secure ceiling to match existing secure ceiling. New secure ceiling shall comply with US

Marshals Publication 64, latest edition.

6. VAV Box above Room 312E – Sally Port (3M-OSH-04F)

The access panel in the secure ceiling is broken and cannot be opened. Repair or replace the existing access panel.

a. Remove existing secure ceiling to verify location of the VAV box.

b. Repair existing access panel if possible and if this provides the required access to the VAV box.

c. If repair is not possible, or required access is not provided, remove existing access panel and provide new access panel to access VAV box.

d. Provide new secure ceiling to match existing secure ceiling. New secure ceiling shall comply with US

Marshals Publication 64, latest edition.

7. Fan Powered Terminal Unit FPB-P1-1 at 3rd Floor Mezzanine - South Catwalk (3M-0SH-05)

Equipment requiring access is too far from the platform. The rear of the FPB requires access.

a. Remove existing railing as required for extension of addition of new platform.

December 20, 2018 Page 5

b. Provide a galvanized metal grating platform approximately 3’ x 5’ extending catwalk to equipment.

Tie into existing catwalk. Suspend from structure above.

c. Provide metal grating upper platform extending over unit to provide access to rear of fan powered terminal unit. Suspend from structure above.

d. Rear of unit is blocked by existing ductwork. Access will be from upper platform.

e. Provide anchors/anchor points for harnesses, as railings are not practical at this location. Each anchor/anchor point shall be rated for OSHA-required 5000 lb minimum. Anchors/anchor points and personal fall arrest systems shall meet OSHA 29 CFR 1910.140 requirements.

8. Fan Powered Terminal Unit FPB-P1-2 at 3rd Floor Mezzanine - South Catwalk (3M-0SH-06)

Equipment requiring access is too far from the platform. The rear of the FPB requires access.

a. Remove existing railing as required for extension of addition of new platform.

b. Provide a galvanized metal grating platform approximately 3’ x 6’ extending catwalk to equipment.

Tie into existing catwalk. Suspend from structure above.

c. Provide metal grating upper platform extending over unit to provide access to rear of fan powered terminal unit. Suspend from structure above.

d. Rear of unit is blocked by existing ductwork. Access will be from upper platform.

e. Provide anchors/anchor points for harnesses, as railings are not practical at this location. Each anchor/anchor point shall be rated for OSHA-required 5000 lb minimum. Anchors/anchor points and personal fall arrest systems shall meet OSHA 29 CFR 1910.140 requirements.

9. HEPA Exhaust Unit – Access for Filter Change above Room 316 - Property(3M-OSH-07)

New access panel and platform required to accommodate two-person changing of filter and access equipment.

a. Remove existing secure ceiling, suspension system and access panel as required for new work.

b. Provide a larger galvanized metal grating platform – approximately 3’ x 6’ - suspended from existing building structure to accommodate 2-person filter change.

c. Extend platform to provide access to side of HEPA unit, and other damper locations.

d. Provide anchors/anchor points for harnesses at platforms. Each anchor/anchor point shall be rated for OSHA-required 5000 lb minimum. Anchors/anchor points and personal fall arrest systems shall meet OSHA 29 CFR 1910.140 requirements.

e. Provide new access panel in room to provide access to platforms.

f. Provide new secure ceiling and suspension system to match existing ceiling.

10. Fan Powered Terminal Unit FPB-1M1-1 at First Floor Mezzanine (1M-OSH-08)

Provide access to electronics on west side of unit.

a. Provide galvanized steel grating metal platform – approx. 3’ wide, extend from top of platform railing to wall.

b. Provide metal angle at base of platform. Angle to extend 4” above platform surface.

c. At side of platform opposite unit provide 2” square welded wire mesh supported on steel angles from base angle to underside structure above.

11. Fan Powered Terminal Unit FPB-1M1-2 at First Floor Mezzanine (1M-OSH-09)

Provide larger access panel to electronics on west side of unit.

a. Remove existing gypsum board ceiling and support system as required for new work.

December 20, 2018 Page 6

b. Provide a new larger access panel to accommodate extension ladder access at OSH required angle.

c. Patch existing gypsum board ceiling at new access panel.

d. Cut top of existing partition to access mechanical unit beyond.

e. Paint access panel and new gypsum board ceiling to match the existing ceiling.

12. West Courtroom Entrance – First Floor (1-OSH-10)

Provide access to inaccessible courtroom lights above glass ceiling.

a. Remove horizontal glazing panels.

b. Patch existing walls and wood trim where glazing was removed.

c. Provide new wood framed millwork glass wall from door head to underside of existing ceiling.

d. New wood frame millwork to match existing frame millwork species and cut. Horizontal spacing to match existing panel divisions of the wall below.

e. Brace wood framing to structure above as required for stability.

f. Provide 1/4” tempered safety glass infill panels.

g. Stain new wood frame millwork to match existing woodwork.

h. Remove two (2) inaccessible light fixtures above wood acoustic cloud ceiling. Paint and patch ceiling to match adjacent.

13. East Courtroom Entrance – First Floor (1-OSH-11)

Provide access to inaccessible courtroom lights above glass ceiling.

a. Remove horizontal glazing panels.

b. Patch existing walls and wood trim where glazing was removed.

c. Provide new wood framed millwork glass wall from door head to underside of existing ceiling.

d. New wood frame millwork to match existing frame millwork species and cut.

e. Brace wood framing to structure above as required for stability. Horizontal spacing to match existing panel divisions of the wall below.

f. Provide 1/4” tempered safety glass infill panels.

g. Stain new wood frame millwork to match existing woodwork.

h. Remove two (2) inaccessible light fixtures above wood acoustic cloud ceiling. Paint and patch ceiling to match adjacent.

14. Access to Space between AHU-B2 and AHU-B1, Basement - Room 052A – Mech/Elec Provide Access over Large Duct in Mech/Elec Room (B-OSH-12)

a. Create a removable segment of ductwork between the two large mechanical units. Provide wheels on the removable segment for easier movement.

15. Guardrails at third floor mezzanine (3M-OSH-13)

a. Existing guardrails are 36” above walking surface. Per OSHA technical requirements, guardrail heights must be 42” above the walking surface. However, OSHA Instruction STD 01-01-010 allows an exception for existing guardrails that are at least 36” above the walking surface.

b. At the catwalk area near the maintenance platform, the existing rails are 32”-33” above the walking surface. Because these are below the allowed exception, these must be modified to be 42” above the walking surface.

End of Report

APPENDIX A

OSH Equipment Survey Safety Study - Final Report

Appendix A - Corrective Actions List

Finding

Number

Floor Location Detail Source/Issue Description of Deficiency Comments/Correction

R-OSH-01 Roof Roof, Southeast corner at mechanical units

Cooling Tower- periodic maintenance access to top of equipment

Gap in railing at top of ladder Provide Self Closing Gate

R-OSH-01A Roof Roof, southwest corner Lower Roof Access - periodic maintenance access to top of equipment

Gap in railing at top of ladder Provide (2) Self Closing Gates

R-OSH-01B Roof Roof, south Lower Roof Access - periodic maintenance access to top of equipment

Gap in railing at top of ladder Provide Self Closing Gate

3M-OSH-04 3 Mezzanine 3 rd floor Mezzanine, north catwalk, north of col. A between col. 6 & 7

Fan (motor and belt) on ductwork near AHU-3M3

Cannot be reached for periodic maintenance

Extend platform and railing

3M-OSH-04A 3 Mezzanine 3rd Floor Mezzanine -northeast corner, above 356

Women's

VAV Boxes Cannot be reached for periodic maintenance

Provide access panel from 356 Women’s ceiling.

Install small platform and anchor point at VAV level, approximately 5’ above ceiling level.

3M-OSH-04B 3 Mezzanine 3rd Floor Mezzanine, northeast corner above 358

Men's

VAV Boxes Cannot be reached for periodic maintenance

Extend catwalk and guardrails to VAV location.

3M-OSH-04E 3 3rd Floor, 312G Prisoner

Property

VAV Boxes Access panel in secure ceiling is broken, cannot open.

Remove security ceiling panels to verify location of

VAV. Repair or relocate access panel.

3M-OSH-04F 3 3rd Floor, 312 Secure

Corridor

VAV Boxes Access panel in secure ceiling is broken, cannot open.

Remove security ceiling panels to verify location of

VAV. Repair or relocate access panel.

3M-OSH-05 3 Mezzanine 3rd Floor Mezzanine south catwalk

Fan Powered Terminal Unit FPB-P1-

For each unit:

- equipment is too far from platform

- the rear of the FPB requires and access platform

- Extend platform to equipment

- Provide platform across top of unit

- Provide anchor point for harness at upper platform

- Provide gate and signage at transition to upper platform

3M-OSH-06 3 Mezzanine 3rd Floor Mezzanine south catwalk

Fan Powered Terminal Unit FPB-P1-

For each unit:

- equipment is too far from platform

- the rear of the FPB requires and access platform

- Extend platform to equipment

- Provide platform across top of unit

- Provide anchor point for harness at upper platform

- Provide gate and signage at transition to upper platform

December 14, 2018 1 of 2

OSH Equipment Survey Safety Study - Final Report

Appendix A - Corrective Actions List

Finding

Number

Floor Location Detail Source/Issue Description of Deficiency Comments/Correction

3M-0SH-07 3 Above 3 rd

Floor Ceiling, 316

Process

HEPA Exhaust Unit

Access for filter change

Changing the large filter requires 2 people.

Provide:

1. Larger platform and rail (approx. 3’ x 6’) to accommodate 2-person removal of filter

2. Relocate access panel within room. Extend existing small platform for access to filter and dampers.

4. Provide two safety anchor points at platform.

1M-OSH-08 1 Mezzanine First Floor Mezzanine Fan Powered Terminal Unit

FPB-1M1-1

Access needed to valve (eastside of equipment) and to electronics

(westside)

To access valves:

- Valve is accessible from 132I Office on first floor.

The ceiling has been recently modified, ACT ceiling has been installed instead of gypsum board ceiling.

To access electronics:

- Provide platform for support to access

1M-OSH-09 1 Mezzanine First Floor Mezzanine Fan Powered Terminal Unit

FPB-1M1-2

Access needed to valve (east side of equipment) and to electronics

(west side)

Valves are accessible

To access electronics:

- Provide larger access panel from first floor

- From below, cut back upper corner of wall to reach electronics

01-OSH-10 1 First Floor West Courtroom Entrance Courtroom entrance lights are not accessible due to glass ceiling below and wood acoustic cloud ceiling in courtroom

Correction:

- Eliminate glass ceiling

- Building glass wall from door head up to ceiling

- Eliminate 2 light fixtures not accessible above wood acoustic cloud ceiling in courtroom

01-OSH-11 1 First Floor East Courtroom Entrance Courtroom entrance lights are not accessible due to glass ceiling below and wood acoustic cloud ceiling in courtroom

Correction:

- Eliminate glass ceiling

- Building glass wall from door head up to ceiling

- Eliminate 2 light fixtures not accessible above wood acoustic cloud ceiling in courtroom

B-OSH-12 B Basement Access to space between AHU-B2 and AHU -B1

Access over large duct required Correction:

- Modify duct to provide a removable section

3M-OSH-13 3 Mezzanine 3rd Floor Mezzanine, near maintenance platform

Guardrail height Gurardrail is below 42" Add framing to raise guardrail height

December 14, 2018 2 of 2

APPENDIX B

HJA HAINES, JANSON & ASSOCIATES, LLC

SAFETY CONSULTANTS

704 FORDER CROSSING COURT ST. LOUIS, MISSSOURI 63129 314-845-3516

www.hainesjanson.com

December 14, 2018 Page 1 of 19

Engineering Judgement Number R-OSH-01 Roof, Southeast corner at mechanical units

Provide (2) self-closing gates to comply with 29 CFR 1910.28(b)(3)(iv) which states: “Each employee is protected from falling into a ladderway floor hole or ladderway platform hole by a guardrail system and toeboards erected on all exposed sides, except at the entrance to the hole, where a self-closing gate or an offset must be used.”

Christopher E. Janson, MS, CSP, CHMM, CXLT

December 14, 2018 Page 2 of 19

Engineering Judgement Number R-OSH-01A Roof, south center

Provide two self-closing gates, one at each ladder, to comply with 29 CFR 1910.28(b)(3)(iv) which states: “Each employee is protected from falling into a ladderway floor hole or ladderway platform hole by a guardrail system and toeboards erected on all exposed sides, except at the entrance to the hole, where a self-closing gate or an offset must be used.”

December 14, 2018 Page 3 of 19

Engineering Judgement Number R-OSH-01B Roof, south center

Provide a self-closing gate to comply with 29 CFR 1910.28(b)(3)(iv) which states: “Each employee is protected from falling into a ladderway floor hole or ladderway platform hole by a guardrail system and toeboards erected on all exposed sides, except at the entrance to the hole, where a self-closing gate or an offset must be used.”

December 14, 2018 Page 4 of 19

Engineering Judgement Number 3M-OSH-04

3rd floor Mezzanine, north catwalk, north of col. A between col. 6 & 7

Extend platform and guardrail to safely access equipment for maintenance and comply with 29 CFR 1910.28(b(1)(i). Provide access to both sides of horizontal duct at access panels.

December 14, 2018 Page 5 of 19

Engineering Judgement Number 3M-OSH-04A 3rd Floor Mezzanine - northeast corner, above 356 Women's Restroom

View of VAV box from third floor mezzanine catwalk

View of Women’s Restroom ceiling below VAV box

Provide access panel from 356 Women’s Restroom. Install small platform at VAV level, approximately 5’ above ceiling level. As guardrails for the platform do not appear to be feasible, provide personal fall arrest systems consisting of an anchor point, self-retracting lifeline, D-ring extension and full-body harness.

December 14, 2018 Page 6 of 19

Engineering Judgement Number 3M-OSH-04B 3rd Floor Mezzanine, northeast corner above 358 Men's

Extend catwalk to VAV location to safely access equipment for maintenance and comply with 29 CFR 1910.28(b(1)(i). Provide guardrails at open edges.

December 14, 2018 Page 7 of 19

Engineering Judgement Number 3M-OSH-04E 3rd Floor, 312G Prisoner Property

Photo of similar ceiling condition

Remove security ceiling panels to verify location of VAV. Repair or relocate access panel.

December 14, 2018 Page 8 of 19

Engineering Judgement Number 3M-OSH-04F 3rd Floor, 312E Sally Port

Photo of similar ceiling condition

Remove security ceiling panels to verify location of VAV. Repair or relocate access panel.

December 14, 2018 Page 9 of 19

Engineering Judgement Number 3M-OSH-05 3rd Floor Mezzanine south catwalk

Extend platform and guardrails to equipment (approx. 3' x 7')

Add platform over the unit to get access to the back

Provide gate between lower platform and upper platform. Provide signage on gate: “DANGER. Fall protection required beyond this point.”

As guardrails for the upper platform do not appear to be feasible, provide personal fall arrest systems consisting of an anchor/anchor point, self-retracting lifeline, D-ring extension and full-body harness.

December 14, 2018 Page 10 of 19

Engineering Judgement Number 3M-OSH-06 3rd Floor Mezzanine south catwalk

Extend platform and guardrails to equipment (approx. 3' x 7')

Add platform over the unit to get access to the back

Provide gate between lower platform and upper platform. Provide signage on gate: “DANGER. Fall protection required beyond this point.”

As guardrails for the upper platform do not appear to be feasible, provide personal fall arrest systems consisting of an anchor/anchor point, self-retracting lifeline, D-ring extension and full-body harness.

December 14, 2018 Page 11 of 19

Engineering Judgement Number 3M-OSH-07 Above 3rd Floor Ceiling, 316 Process

View of existing access panel and platform above

Continued on next page

December 14, 2018 Page 12 of 19

View of HEPA filter unit and access platform

December 14, 2018 Page 13 of 19

View above ceiling showing narrow existing access platform

Provide:

1. Larger platform and rail (approx. 3’ x 6’) to accommodate 2-person removal of filter

2. Larger access panel in ceiling approx. 4’ x 6’

3. Relocate access panel within room. Extend existing small platform for access to filter and dampers.

4. As guardrails for the platform do not appear to be feasible, provide personal fall arrest systems consisting of an anchor/anchor point, self-retracting lifeline, D-ring extension and full-body harness.

December 14, 2018 Page 14 of 19

Engineering Judgement Number 1M-OSH-08 First Floor Mezzanine

To provide safe access to electronics, provide a platform over existing conduit to support an employee.

Extend platform between east and west fan powered boxes.

December 14, 2018 Page 15 of 19

Engineering Judgement Number 1M-OSH-09 First Floor Mezzanine

View of VAV unit electrical box from first floor mezzanine platform, showing first floor wall beyond.

View from first floor access panel. Cut top of wall to access electronics beyond.

To provide safe access to electronics, provide a larger access panel in the ceiling. Cut back corner of wall board and reconfigure framing as necessary to reach electronics from first floor access panel.

December 14, 2018 Page 16 of 19

Engineering Judgement Number 1M-OSH-10 First Floor, East Courtroom Entrance

Engineering Judgement Number 1M-OSH-11 First Floor, West Courtroom Entrance

View of courtroom entry horizontal glazing

December 14, 2018 Page 17 of 19

View from interior of courtroom, light fixtures above horizontal glazing

As no safe access is possible to service lighting fixtures, eliminate the glass ceiling, and construct a glass wall from the door head up to the ceiling. In addition, eliminate 2 light fixtures not accessible above wood acoustic cloud ceiling in courtroom, and paint and patch ceiling.

704 FORDER CROSSING COURT ST. LOUIS, MISSSOURI 63129 314-845-3516

www.hainesjanson.com December 20, 2018 Page 18 of 19

Engineering Judgement Number B-OSH-12 Basement

View of duct at floor level and existing column View to space beyond duct that requires access

In order to allow safe access to equipment behind the horizontal duct work, create a removable segment in the existing ductwork.

December 14, 2018 Page 19 of 19

Engineering Judgement Number 3M-OSH-13 Third floor mezzanine

Add additional wood framing to create a top rail no less than 42” above the walking surface.

APPENDIX C

OSH Equipment Survey & Safety Study – Pre-Final Report

December 14, 2018

APPENDIX C - TABLE OF CONTENTS

• A-001 Specifications

• A-101 Basement Plan

• A-102 First Floor Plan

• A-103 First Floor Mezzanine Plan

• A-104 Second Floor Plan

• A-105 Third Floor Plan

• A-106 Third Floor Mezzanine Plan

• A-107 Roof Plan

• B-1 Basement Enlarged Plan, Elevation, and Section

• 1-1 First Floor Enlarged Plan

• 1-2 First Floor Section and Elevation

• 1-3 First Floor Mezzanine Enlarged Plan

• 3-1 Third Floor Enlarged Plans

• 3-2 Third Floor Enlarged Plans

• 3-3 Third Floor Enlarged Plans

• 3-4 Third Floor Mezzanine Enlarged Plans

• 3-5 Third Floor Mezzanine Enlarged Plan

File details come from the government source that posted it.