This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Kinneary Nitrogen Generator & Dry Pipe System project located at the Joseph P. Kinneary U.S. Courthouse in Columbus, OH. The amendment accomplishes two primary actions: 1) extending the proposal due date by 7 days from April 15, 2025 to April 22, 2025, and 2) providing pre-bid sign-in sheets from two site visits conducted on 3/26/2025 and 4/8/2025.
The amendment is part of Solicitation 47PF0025R0021, issued by the GSA AMD Repair & Alterations Contracting Branch Southern Team. The attached sign-in sheets document attendees from various organizations including GSA, DSEA Services, Martin Pauly, and other potential contractors who participated in the pre-bid meetings. The solicitation seeks construction services for replacing the existing nitrogen generator and dry pipe system, which will involve lead paint remediation, asbestos abatement, piping replacement, and associated architectural repairs at the courthouse facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| site photos.zip | ZIP file | |
| RFI_Clarification Log - Pre-Bid RFI.pdf | ||
| Second Pre Bid Kinneary NGen (1).pdf | ||
| prebid sign in.pdf | ||
| Solicitation Amendment 47PF0025R0021_0001.pdf | ||
| 47PF0025R0021 package.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Description of Modification Continuation Page
1. Extend the proposal due date by 7 days, from April 15, 2025 to April 22, 2025.
2. Provide the pre-bid sign in sheets for both site visits All other terms and conditions remain the same.
ATTACHED:
Pre-bid sign in sheet 4/8/2025 Pre-bid sign in sheet 3/26/2025
47PF0025R0021/0002
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0002 |
| Code[0]: 5P2QCB |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: Rhonda Booker, Contracting Officer |
| Description[0]: Solicitation 47PF0025R0021, Amendment 0002 - Nitrogen Generator & Dry Pipe System project - Joseph P. Kinneary Courthouse in Columbus, OH. |
The purpose of this amendment is to:
[See Description of Modification Continuation Page]
| FacilityCode[0]: |
| Code[2]: 5P2QCB |
| IssuedBy[0]: R5 AMD Repair & Alterations Contracting Branch Southern Team |
230 S Dearborn St Chicago, IL 60604 USA
| NameandAddress[0]: |
| AdministeredBy[0]: R5 AMD Repair & Alterations Contracting Branch Southern Team |
230 S Dearborn St Chicago, IL 60604 USA
| ContractIDCode[0]: |
| ReqNumber[0]: EQ5P1SEAC-25-0001 |
| AmendmentNo[1]: 47PF0025R0021 |
| ModificationNo[0]: |
| ProjectNo[0]: 3605 |
| Page[0]: 1 |
| Pages[0]: 4 |
| EffectiveDate[0]: 4/10/2025 |
| Dated9B[0]: 3/13/2025 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .