This document is an amendment to a solicitation (Solicitation Number: 47PF0024R0047) for the Stokes Rotunda Roof Replacement project at the Carl B. Stokes U.S. Courthouse in Cleveland, Ohio. The amendment provides clarifications, answers to Requests for Information (RFIs), and changes to the project specifications. Key details include:
The solicitation is a total Service-Disabled Veteran-Owned Small Business set-aside. The project scope includes replacement of the existing roof system and sealant in stone panel joints above and adjacent to the main Rotunda entrance, as well as patching and refinishing of the Rotunda ceiling. The amendment clarifies the type of existing roofing system, provides guidance on temporary roofing and insulation requirements, and specifies the use of a silicone sealant for sealing natural exterior stone. It also deletes the requirement for the Key Sustainable Products Initiative. The pre-proposal meeting and site visit was held on April 2, 2024, and the amendment is effective as of April 16, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1 CO Signed.pdf | ||
| Drawings.pdf | ||
| RFQ 47PF0024R0047 Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1
1. CONTRACT ID CODE
I
PA
E OF PAGES
I 3
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable) 3. EFFECTIVE
DATE 4/16/2024 ROH11195
CODE 7. ADMINISTERED BY (If other than Item 6) CODE I
2. AMENDMENT/MODIFICATION NUMBER 2
6. ISSUED BY
General Services Administration
Acquisition Management Division
508 South Eighth Street
Springfield IL 62703
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
47PF0024R0047
9B. DATED (SEE ITEM 11)
3/29/2024
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE I FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers D is extended. � is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b ).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor D is not D is required to sign this document and return ____ _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See attachment for clarifications, RFI answers, and changes to project specifications.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 1 0A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
R
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
DocuSign Envelope ID: 818596C1-ACB8-4668-9E47-8795C3324B37
1. Is there a proposed ingress/egress route for equipment onsite to access the roof and above?
a. Response: GSA recommends parking on Huron road to unload equipment, with another option being to park on Canal and carry the equipment up the stairs.
2. The bollards are spaced tight to get equipment between them. Are the bollards moveable
a. Response: GSA does not have knowledge which, if any, bollards are removable.
3. Was a core cut made to confirm the depth of the existing system.
a. Response: a core was not cut to confirm the depth of the existing system.
4. We're planning to attach scaffolding to the mortar joints of the stone facade...will there be any issues with that?
a. Response: There may be some davits existing from previous statue cleaning, any additional penetrations would need to be properly patched/repaired.
5. We're placing temporary fencing around the perimeter of our work spaces (the fencing will not restrict the public from accessing the front entrance). Is this permitted?
a. Response: We would like to see a plan / diagram indicating where the proposed scaffolding and fencing would be for review. We cannot impede access to the revolving door or the double doors. Any fencing would need to be properly weighted, as we get high winds in the plaza from time to time.
6. Exterior Joint Sealants: In the spec section “joint sealants”, it refers you to sections “076200” and sections “075423”. When you go to those sections, it refers you back to “joint sealants”. I am looking for clarification on what sealant is going to be specked.
a. Response: Silicone sealant for sealing natural exterior stone. Dowsil 790 is a recommended silicone sealant and is the basis of design, but there are others comparable.
7. Key Sustainable Products Initiative (KSP): At the first pre bid meeting, it was verbally spoken that KSP is no longer required. Can you confirm this since KSP was left in the agenda documents in today’s (4/12/2024) pre bid meeting.
a. Response: KSP is no longer a requirement.
Spec Section Clarifications:
- Revise Spec Section 07 01 50 1.7.A to: “Existing Roofing System: Single-ply membrane roofing.”
- Revise Spec Section 07 54 23 2.6.C.1 to: “Thickness: 1/2 inch, minimum or as required by the
Roof Nav listing”
- Revise Spec Section 07 01 50.19 paragraph 1.7.A to: “Existing Roofing System: Single-ply membrane roofing.”
- Revise Spec Section 07 01 50.19 paragraph 2.1.A to: “XPS Insulation: ASTM C 578.”
- Revise Spec Section 07 01 50.19 paragraph 2.2.A to: “Design and selection of materials for temporary roofing are Contractor's responsibilities and compatible with the new roof system.”
- Delete Spec Section 07 01 50.19 paragraphs 2.2.B, 2.2.C, 2.2.D, 2.2.E, 2.2.F, and 2.2.G.
- Revise Spec Section 07 01 50.19 paragraph 3.2.C.4.a to: “Remove unadhered materials such as bitumen, unadhered felts, and wet felts.”
- Revise Spec Section 07 01 50.19 paragraph 3.5.B.1 to: “Use 40-mil composite designed as a temporary roof during prolonged re-roofing projects or as a vapor barrier under new roofing systems.”
- Delete Spec Section 07 01 50.19 paragraphs 3.5.B.2 and 3.5.B.3.
- Revise Spec Section 07 01 50.19 paragraph 3.5.C to: Remove temporary roofing before installing new roofing unless this is intended to perform as a component of the new roof system (e.g., as the vapor retarder).”
- Revise Spec Section 07 01 50.19 paragraph 3.6.A.1 to: Clean substrates of contaminants, such as adhesives, asphalt, sheet materials, dirt, and debris.”
- Delete Spec Section 07 01 50.19 paragraph 3.6.B.
- Revise Spec Section 07 54 23 paragraph 1.4.B.5 to: “Insulation adhesive patterns for corner, perimeter, and field-of-roof locations.”
- Revise Spec Section 07 54 23 paragraph 2.6.C.1 to: “Thickness: 1/2 inch minimum or as required by the RoofNav listing”
- Add Spec Section 07 54 23 paragraph 3.5.C.2.a.2) to be: “Apply weights as required by the insulation manufacturer to ensure appropriate bond between the insulation and substrate.”
- Revise Spec Section 07 62 00 paragraph 3.12.1 to: “Seal joints as required for watertight construction and compatible with new stone sealant.”
- Revise Spec Section 07 92 00 paragraph 1.1.A.1 to: “Silicone sealant for sealing natural exterior stone.”
- Revise Spec Section 07 92 00 paragraph 2.1.A to: “Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another, with roofing cut-off sealant at termination bar, and with joint substrates under conditions of service and application as demonstrated by joint-sealant manufacturer based on testing and field experience.”
- Revise Spec Section 07 92 00 paragraph 2.1.B to: “Ultra-low-modulus one-part, neutral-cure silicone sealant for use with natural stone, porous stone, masonry, and concrete façades.”
- Revise Spec Section 07 92 00 paragraph 2.1.B.1 to: “Low-staining and plasticizer free, suitable for porous substrates.”
- Revise Spec Section 07 92 00 paragraph 2.1.B.2 to: “Extension/compression capability of +100/- 50 percent.”
- Revise Spec Section 07 92 00 paragraph 2.1.B.3 to: “High joint movement capabilities.”
- Add Spec Section 07 92 00 paragraph 2.1.B.4 to be: “Resistant to sunlight, rain, snow, and temperature extremes.”
- Revise Spec Section 07 92 00 paragraph 2.1.C to: “Colors of Exposed Joint Sealants: Match existing (after cleaning).”
- Delete Spec Section 07 92 00 paragraph 2.2.