Sol Amendment 47PF0024R0041_0002 (1).pdf
PDF 204 KB Posted
- Solicitation number
- 47PF0024R0041
About this file
This document is an Amendment to Solicitation 47PF0024R0041 for the Birch Bayh Secured Historic Entryway Improvements project. The purpose of the amendment is to provide a Past Performance Questionnaire for references to complete and submit directly to the Contracting Specialist.
The solicitation is a Request for Proposal (RFP) issued by the General Services Administration (GSA) Region 5 for updates to the secured historic entryways of the Birch Bayh Federal Building in Indianapolis, Indiana. It is a Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside. The project will replace the exterior doors, framing, and the door in the vestibule partition, replicating the original design. Offers must be submitted by May 1, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 0001 - 47PF0024R0041_0001.pdf | ||
| RFP 47PF0024R0041 package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
5P2QCB
Kathern Williams, Contracting Officer
The purpose of this amendment is to provide the Past Performance Questionnaire to be completed by each reference.
Attachment: Past Performance Questionnaire
R5 AMD Repair & Alterations Contracting Branch Southern
Team
230 S Dearborn St
Chicago, IL 60604 USA
EQ5P1SEBIN-24-0011
47PF0024R0041
RIN12077 SIN00033
1 2
4/19/2024
3/19/2024
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
PAST PERFORMANCE QUESTIONNAIRE
FOR RFP 47PF0024R0041
BIRCH BAYH SECURED HISTORIC ENTRYWAY IMPROVEMENTS
Please complete and submit this reference directly to the GSA Contracting Specialist, Stephanie Mathless, at stephanie.mathless@gsa.gov, no later than May 1, 2024
Section 1 – To be completed by the Contractor
Contractor’s Name:
Address:
Telephone Number:
Point of Contact (POC):
Role of the POC:
Project Title or Brief Description of the Work:
Dates of Performance:
Section 2 – To be completed by the Reference
Please complete the following questionnaire on behalf of the contractor listed in Section 1. Only the project listed in Section 1 shall be considered for this evaluation. For each question below, select the rating that best describes the Contractor’s performance. Please provide a narrative explanation where appropriate; any narrative comments are greatly appreciated. The completed questionnaire should be emailed directly to the
Contracting Office to ensure the confidentially of your responses. Your responses will be reviewed solely for the purposes of a past performance evaluation and only the selection committee will see your response.
Name of Respondent:
Title/Company Name:
Role of Respondent on the
Project being Referenced:
Telephone:
Email:
If you have additional comments to provide, please add them at the end of the attached questionnaire. Thank you, in advance, for your time and providing GSA with this valuable feedback.
QUALITY
1. Overall, how well did the quality of the work conform to the contract requirements?
Excellent - 5 4 3 2 1 - Poor
BUDGET
2. Overall, how was the contractor’s performance with regards to budget?
Excellent - 5 4 3 2 1 - Poor
3. Was the project completed within the original contract budget? Yes No
If not, please provide the reason for actual cost differences. (e.g. owner driven changes, differing site conditions, errors and omissions, etc…)
4. Was change order work pricing determined fair and responsible? Yes No
If there were issues with change order pricing, please explain.
SCHEDULE
5. Overall, how was the contractor’s performance with regards to schedule?
Excellent - 5 4 3 2 1 - Poor
6. Did the contractor complete the project within the original contract schedule? Yes No
If not, what were the reasons for changes to the schedule?
MANAGEMENT & STAFFING
7. Did the Contractor staff the job adequately? (PM, Superintendent, etc.) Yes No
8. Were key personnel adequately qualified for their positions? Yes No
9. How well did the prime contractor manage his subcontractors? (e.g. Coordinating trades, updating subs on changes to the SOW, prompt payment, performance issues, etc…)
Excellent - 5 4 3 2 1 - Poor
10. How effective was the Contractor at communicating with key project stakeholders?
Excellent - 5 4 3 2 1 - Poor
11. How well did the Contractor demonstrate sensitivity to client/tenant concerns? (e. g. Coordination issues, site cleanliness, noise, etc…)
Excellent - 5 4 3 2 1 - Poor
ADMINISTRATION
12. How responsive and responsible was the contractor in administrative areas? (e.g. Documenting progress, responding to RFI’s, processing payments, tracking changes, etc.)
Excellent - 5 4 3 2 1 - Poor
OVERALL
13. How would you rate this Contractor’s overall performance?
Excellent - 5 4 3 2 1 - Poor
File details come from the government source that posted it. Updated .