This document contains an amendment to a request for proposal and answers to questions from potential offerors. The amendment provides responses to questions received regarding a solicitation by the General Services Administration to perform water infiltration repairs at the Birch Bayh Federal Building and U.S. Courthouse in Indianapolis, Indiana. The scope of work involves temporary repairs to address water infiltration issues, including removing and replacing limestone panels, windows trim, sealants, damaged plaster and drywall, and painting interior surfaces. The amendment clarifies that scaffolding must be installed after hours, access to the work area is through a small door, scaffolding should be self-supporting without anchors to the building, window restoration can occur during daylight hours with some exceptions, security escorts will be required for one facade, replacement hardware should match existing designs, all glazing was intact as of early 2021, and the painting scope is expanded to include areas with deteriorated plaster up to one inch from decorative borders in some locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 to RFP 47PF0022R0014.pdf | ||
| RFP 47PF0022R0014.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable x
X
5P2QCB
Aneesah Muhammad, Contracting Officer
Amendment 0001 to RFP 47PF0022R0014 - Water Infiltration Project, located at the Birch Bayh Federal Buildings and U.S.
Courthouse, 46 E. Ohio Street, Indianapolis IN, is being issued to provide Answers to Request For Information (RFI) Questions that were received.
*Note: The last day that RFI questions will be received from contractors is on February 1, 2022.
Please see attached
General Services Administration 230 S. Dearborn, Room 3500 Chicago, IL. 60604
General Services Administration 230 S. Dearborn, Room 3500 Chicago, IL. 60604
RFP 47PF0022R0014
1 3
01/25/2022
01/05/2022
Amendment 0001 to RFP 47PF0022R0014 – Water Infiltration Project, located at the Birch Bayh Federal Buildings and U.S. Courthouse, 46 E. Ohio Street, Indianapolis, IN.
Answers to Request for Information (RFI) Questions
Question 1. Will Scaffolding erection and installation be considered “noisy activity” and need to be installed after hours?
Answer 1. Metal scaffolding assembly and transportation will create a ‘noisy activity’, requiring after hour installation.
Question 2. Will street closures be required for the scaffolding to be loaded and unloaded in the courtyard area?
Answer 2. Access to the courtyard is through a 3’x7’ door in a public male restroom. Although no street closures are anticipated, scaffolding specific delivery methods may require temporary closure of public elements.
Question 3. Can scaffolding be secured to the building?
Answer 3. The scaffolding should be self-supporting with no physical anchoring to the building, the project must avoid creating additional damage to the limestone panels.
Question 4. Please confirm that the window restoration can be done during the day.
The bid specifies only that the limestone work must be done off hours.
Answer 4. The window restoration can be done during the day. The only exception is the use of power tools that generate vibration transmitted through the building.
Question 5. Are there security issues that will inhibit/limit access to any of the rooms where windows are to be restored?
Answer 5. Security escort will be required for one facade of the restoration scope and will be scheduled to support construction/restoration activities.
Question 6. The solicitation mentions hardware to be replaced if required. Will any replacement hardware have to match the existing historical hardware?
Answer 6. Any hardware replacement will be as close as historically possible. A case-by-case request will be reviewed.
Question 7. Solicitation states remove and replace glass broken during construction.
Are we to assume that all glass windows are currently intact?
Answer 7. When the windows were photographed in early 2021, all glazing was intact. A final review will be conducted during the pre-bid meeting.
Question 8. How many locations are we to quote for notes 1, 2, and 3 on sheet A103?
Just the (2) locations identified by lines connecting the pictures to the floor plan?
Answer 8. The two locations were identified at the original site investigation that generated the scope of work. The bid price should be based on two locations, as indicated, with three remedial scope.
Question 9. Sheet A106 states to maintain 4” away from painted ornamental boarder but paint is flaking in the painted ornamental boarder in some locations (see attached pictures). Are we to include these in remediation and repaint or leave as is?
Answer 9. Based on current conditions as assessed during our site pre-bid visit on January 18, 2022, we will expand the remedial/improvement to 1" from the current border. With the exception of the noted area, that was discussed, of the vertical deterioration adjacent and beyond the border (between the outer border and the corner, where restoration scope will include the removal of damaged materials and painting of the surface to match the existing color and decoration treatment. No additional areas have been identified beyond the inner border.
File details come from the government source that posted it. Updated .