RFI_4.pdf
PDF 12 KB Posted
- Attached to
- Dayton Ohio Operations and Maintenance Federal contract opportunity
- Solicitation number
- 47PF0019R0071A
About this file
RFI #4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_003.pdf | ||
| J16_-_Equipment_Inventory_-_OH0196ZZ.xlsx | XLSX spreadsheet | |
| J16_-_Equipment_Inventory_-_OH0195ZZ.xlsx | XLSX spreadsheet | |
| J16_-_Equipment_Inventory_-_OH0514DD.xml | XML file | |
| RFI_2_Amend_001.pdf | ||
| J16_-_Equipment_Inventory_-_PGK32_OH0195ZZ_and_OH0196ZZ.xlsx | XLSX spreadsheet | |
| Amend_001.pdf | ||
| Sign_in_Sheet_Walkthrough_1.pdf | ||
| GSP0509SL0276_CMC_CBA_Dayton_OM.pdf | ||
| RFI_1.pdf | ||
| SITE_VISIT_ATTENDANCE_CONFIRMATION_FORM.pdf | ||
| Walkthrough_Cancellation.pdf | ||
| Tentative_Walk_Through_Dates.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI 4
1. Please provide the number of non-reimbursable repairs over the past two (2) years.
This is not tracked.
2. After reviewing Section C.1.1 , I was unable to determine the Scope of Work for the Federal Parking Lot. Please provide.
See C.2.7, C.39
3. Will Infrared Testing be required annually or every three (3) years (as part of the 3 year electrical testing)?
Please follow Preventative Maintenance Guide requirements per solicitation.
4. Will the contractor be allowed to perform preventive maintenance on the emergency generator during normal business hours?
16 hour on site requirement typically has mechanics stagger shift thus allow for maintenance without building interruption.
5. RS Means will not provide the Dayton Ohio Cost Index and a standard coefficient without purchasing an annual subscription. Can GSA provide this information?
Assume current city cost index for Dayton, Oh as .896 (weighted average)
6. What type of bulbs are currently installed in the pole lights at the Federal Parking Lot.
All exterior lighting has been converted to LED.
File details come from the government source that posted it.