FDA_Equipment_List_12.20.17.xlsx

XLSX spreadsheet 832 KB Posted

Attached to
FDA O&M and Elevator, Cincinnati OH Federal contract opportunity
Solicitation number
47PF0018R0006
Issued by
General Services Administration Public Buildings Service Region 5

About this file

FDA Equipment List

View the file

Other files for this federal contract opportunity

Other files attached to FDA O&M and Elevator, Cincinnati OH, newest first.
File Type Posted
Amend_0003.pdf PDF
Wage_Determination__1968-0300,_60.pdf PDF
RFI_5.pdf PDF
RFI_4.pdf PDF
FDA_Silco.pdf PDF
Fire_Pump_Test_Report.pdf PDF
Vendor_Contact_List_(2).pdf PDF
RFI_2.pdf PDF
CCF01112018.pdf PDF
Amend_0002.pdf PDF
Non_GSA-Owned_or_or_Maintained_Equipment_List_12.20.17.xlsx XLSX spreadsheet
Amend_0001.pdf PDF
SITE_VISIT_ATTENDANCE_CONFIRMATION_FORM.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Use the Asset Uploader tab (Red) to capture new assets/equipment for import into NCMMS. The template consists of a total of 66 unique data fields. Only about 1/3 of the fields are required (highlighted in blue), the remaining fields are informational, optional or not applicable. Refer to the legend below. The table below provides specific instructions for what to enter in each field.

Some fields are free-form data entry and others have drop down lists to pick from. The drop down pick lists are provided in the reference tabs (Green).

Note: For the purposes of this tool the terms Asset and Equipment are used interchangeably.

Legend
Reference only, do not edit
Required
Not Required - (Hidden Rows)
Optional
Field NameField DescriptionField Action/Instructions
ASSETNUMUnique NCMMS Auto Genarated/Assigned Asset NumberTemporary Asset Number provided, do not edit this field.
ASSETTAGOriginal/Legacy Equipment ID NumberAsset Tag field is currently used to capture legacy equipment ID number. Not Applicable for New Assets.
ASSETTYPEAsset Type CodeSelect an Asset Type from the drop down. If not listed select XXX Unknown and type in asset type description in Colum F.
CLASSSTRUCTUREIDClass Structure IDField hidden leave blank.
ASSETTYPE_DESCRIPTIONAsset Type DescriptionField hidden. To be completed by NCMMS Team
DESCRIPTION_LONGDESCRIPTIONAsset Long Description field is free form field that is used to house additional asset information such as attributes like amparage, voltage, etc. Or additional description information on the asset.The Long Description field is free form field that is used to house additional asset information such as attributes like amparage, voltage, CFM, Gallons, HP, PSI, BTUs, etc. Or additional asset description information on the asset.
EQ1Not Required Leave BlankField hidden leave blank.
FAILURECODENot Required Leave BlankField hidden leave blank.
GLACCOUNTNot Required Leave BlankField hidden leave blank.
GSAASSET1Not Required Leave BlankField hidden leave blank.
GSAASSETYEARNot Required Leave BlankField hidden leave blank.
GSABARCODENot Required Leave BlankField hidden leave blank.
GSACRITICALITYCLASSIFICATIONNot Required Leave BlankField hidden leave blank.
GSACSIMF2004Not Required Leave BlankField hidden leave blank.
GSADATEENERGIZEDNot Required Leave BlankField hidden leave blank.
GSADATERETIREDNot Required Leave BlankField hidden leave blank.
GSAEQUIPMENTIDNCMMS Auto Generated Equipment ID number.Field hidden leave blank.
GSA 1995 PM GUIDE STANDARDS1995 GSA PM Maintenance StandardSelect corresponding 1995 GSA PM Maintenance Standard using drop down. Note: Select either 2012 or 1995, not both.
GSAFACTSNot Required Leave BlankField hidden leave blank.
GSAGSACLASSNot Required Leave BlankField hidden leave blank.
GSA 2012 PM GUIDE STANDARDS2012 GSA PM Maintenance StandardSelect corresponding 2012 GSA PM Maintenance Standard using drop down. Note: Select either 2012 or 1995, not both.
GSAEQUIPMENTOWNEREquipment OwnerFor new assets select GSA or Not GSA Owned.
GSALINKINITIALSPARKDATENot Required Leave BlankField hidden leave blank.
GSALINKMOSTRECENTEVENTDATENot Required Leave BlankField hidden leave blank.
GSALINKTOTALESTIMATEDCOSTNot Required Leave BlankField hidden leave blank.
GSALEGACYLOCLegacy LocationEnter a new Location in "Floor ## - Room ### - Room /Name or Description" format. Include additional location information i.e. cardinal direction or column number or quadrant as applicable.
GSALIFECYCLEENDDATELife Cycle End DateEnter the asset life cycle end date in MM/DD/YYYY format
GSAMAINTENANCERESPONSIBILITYMaintenance ResponsibilitySelect Party responsible for performing Maintenance from drop down. If neither choice applys select "Other"
GSAMAKEAsset MakeIf applicable provide asset or manufacturer make, if not leave blank.
GSAOMNICLASSTABLE21Not Required Leave BlankNot Required Leave Blank
GSAOMNICLASSTABLE23Not Required Leave BlankNot Required Leave Blank
GSAMANUFACTUREYEARManufacturer YearEnter year asset was manufactured in MM/DD/YYY.
GSARCMCRITICALITYNot Required Leave BlankNot Required Leave Blank
GSARCMFAILURECONSEQUENCENot Required Leave BlankNot Required Leave Blank
GSARCMFAILUREPROBABILITYNot Required Leave BlankNot Required Leave Blank
GSARCMFUNCTIONNot Required Leave BlankNot Required Leave Blank
GSARCMMACNot Required Leave BlankNot Required Leave Blank
GSARCMRUNTOFAILNot Required Leave BlankNot Required Leave Blank
GSARCMTASKREFERENCENot Required Leave BlankNot Required Leave Blank
GSAREVIEWCOMMENTSNot Required Leave BlankNot Required Leave Blank
GSAREVIEWDATENot Required Leave BlankNot Required Leave Blank
GSAREVIEWFLAGNot Required Leave BlankNot Required Leave Blank
GSARSMPMCODENot Required Leave BlankNot Required Leave Blank
GSASKYSPARKASSETDESCRIPTIONNot Required Leave BlankNot Required Leave Blank
GSASKYSPARKEQUIPMENTIDNot Required Leave BlankNot Required Leave Blank
GSATENANTNot Required Leave BlankNot Required Leave Blank
GSATENANTSYSTEMIDNot Required Leave BlankNot Required Leave Blank
GSATESTTYPENot Required Leave BlankNot Required Leave Blank
GSAUNIFORMATDESCRIPTIONNot Required Leave BlankNot Required Leave Blank
GSAUNIFORMATIINot Required Leave BlankNot Required Leave Blank
GSAMODELNOAsset Model NumberEnter model number
GSAQUANTITYQuantityEnter quanity
INSTALLDATEInstallation dateEnter asset installation date in MM/DD/YYYY format
MOBRFIDTAGNot Required Leave BlankNot Required Leave Blank
MODELIDNot Required Leave BlankNot Required Leave Blank
LOCATIONLocation Code To be completed by NCMMS Team. Leave BlankLeave blank
MANUFACTURERManufacturerSelect a manufacturer using the drop down.
PRIORITYNot Required Leave BlankNot Required Leave Blank
PRODUCTIDNot Required Leave BlankNot Required Leave Blank
ORGIDOrganization IDThis field is pre-populated with "GSA".
REPLACECOSTNot Required Leave BlankNot Required Leave Blank
PARENTParentUse this field to establish/identify Parent/Child relationship between assets. Enter Temporary Asset Number from Column A of 'Asset Uploader' tab to Identify an assets Parent
PURCHASEPRICEAsset purchase priceEnter asset purchase price
SADDRESSCODEGSA Building NumberEnter GSA Building Number
SERIALNUMAsset serial numberEnter asset serial number
SITEIDRegion Code (01-11)Select region code (05).
STATUSAsset Status CodeFor new assets select Add Pending.

Asset Uploader

ASSETNUMASSETTAGASSETTYPECLASSSTRUCTUREIDASSETTYPE_DESCRIPTIONDESCRIPTION_LONGDESCRIPTIONEQ1FAILURECODEGLACCOUNTGSAASSET1GSAASSETYEARGSABARCODEGSACRITICALITYCLASSIFICATIONGSACSIMF2004GSADATEENERGIZEDGSADATERETIREDGSAEQUIPMENTIDGSAEQUIPMENTOWNERGSAFACTSGSAGSACLASSGSALEGACYLOCGSALIFECYCLEENDDATEGSALINKINITIALSPARKDATEGSALINKMOSTRECENTEVENTDATEGSALINKTOTALESTIMATEDCOSTGSAMAINTENANCERESPONSIBILITYGSAMAKEGSAMANUFACTUREYEARGSAMODELNOGSAOMNICLASSTABLE21GSAOMNICLASSTABLE23GSAQUANTITYGSARCMCRITICALITYGSARCMFAILURECONSEQUENCEGSARCMFAILUREPROBABILITYGSARCMFUNCTIONGSARCMMACGSARCMRUNTOFAILGSARCMTASKREFERENCEGSAREVIEWCOMMENTSGSAREVIEWDATEGSAREVIEWFLAGGSARSMPMCODEGSASKYSPARKASSETDESCRIPTIONGSASKYSPARKEQUIPMENTIDGSATENANTGSATENANTSYSTEMIDGSATESTTYPEGSAUNIFORMATDESCRIPTION
NEW--Actuator EF-16Actuator EF-16GSABSL 3 Room BM 101- Mechanical PenthouseGSAGGD221.IU
NEW--Actuator EF-17Actuator EF-17GSABSL 3 Room BM 101- Mechanical PenthouseGSA
NEW-From Original Docs.ACR-03Air Conditioning Unit or Heat Pump Split SystemThere is a ductless split system that has been installed The condensing unit is located on the roof.GSARoofGSA1
NEW-ACC-1ACR-06Evaporative CondenserEvaporator UnitsGSARoom 009 - UPS RoomGSA2
NEW-ADRAir DryerAir Dryer - 1000 GallonGSARoom 163 MezzanineGSADH-451
NEW-AHUMechanical Room Air HandlerMechanical Room Air HandlerGSARoom 163 MezzanineGSA1
NEW-AC-1AHU-03Air Handling Unit, 3 ton thru 24 tonAir‐handling unit AC‐1 This is a variable air volume unit. 51,780 cfm. located on the roofGSARoofGSACF-600001
NEW-AC-2AHU-03Air Handling Unit, 3 ton thru 24 tonair‐handling unit AC‐2 serve the lab spaces. 50,475 CFM pre‐filter (30% efficiency), final filter (95% efficiency), HEPA filter (99.9% efficiency), heating coils, cooling coils and humidification sectionGSARoofGSACF-600001
NEW-AC-3AHU-03Air Handling Unit, 3 ton thru 24 tonair‐handling unit AC‐3 serve the lab spaces. 49,714 CFM. pre‐filter (30% efficiency), final filter (95% efficiency), HEPA filter (99.9% efficiency), heating coils, cooling coils and humidification sectionGSARoofGSACF-600001
NEW-Air-04Air SeparatorAir SeparatorGSABSL 3 Room BM 101- Mechanical PenthouseGSA1
NEW-AIR-04Air Separators 1/2"Air Separators 1/2"GSARoom 163 MezzanineGSA4
NEW-ALMHeat DetectorsHeat DetectorsGSARoom 163 Mechanical RoomGSA2
NEW-ALMHeat DetectorsHeat DetectorsGSARoom 163 MezzanineGSA2
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSAB003 - Entrance to elevator cabGSA1
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSACorridor CGSA2
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSACorridor DGSA1
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSACorridor EGSA1
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSAMain CorridorGSA6
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSAParking GarageGSA1
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSARoom 002 - LobbyGSA1
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSARoom 012 - Food Service AreaGSA1
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSARoom 020 - Cinci District AdminGSA2
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSARoom 037 - D.P.U. EquipmentGSA1
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSARoom 141 - FCC Conference RoomGSA1
NEW-ALMHorn StrobeStrobe - D503001.03.03.02GSARoom 143GSA1
NEW-ALMHorn StrobesHorn StrobesGSARoom 009 - UPS RoomGSA
NEW-ALMHorn StrobesHorn StrobesGSARoom 163 Mechanical RoomGSA3
NEW-ALMHorn StrobesHorn StrobesGSARoom 163 MezzanineGSA2
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSARoom 002 - LobbyGSA1
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSABSL 3 CorridorGSA1
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSABSL 3 Room B101 - Electrical RoomGSA1
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSABSL 3 Room BM 101- Mechanical PenthouseGSA1
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSACorrdior BGSA1
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSACorridor A (50-73; 163-166)GSA1
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSACorridor CGSA1
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSACorridor DGSA1
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSACorridor EGSA1
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSAMain CorridorGSA2
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.01GSAParking GarageGSA1
NEW-ALMManual Pull StationFire Alarm Pull - D503001.03.01.00GSARoom 164 Main Electrical RoomGSA1
NEW-ALMRoof Horn StrobeRoof Horn StrobeGSARoof - Outside of Room 163 MezzanineGSA1
NEW-ALMSprinklersSprinklersGSARoom 163 Mechanical RoomGSA8
NEW-ALMStrobeStrobe - D503001.03.03.02GSABSL 3 Room BM 101- Mechanical PenthouseGSA2
NEW-ALMStrobeStrobe - D503001.03.03.02GSACorrdior BGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSACorridor A (50-73; 163-166)GSA2
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 003 - Conference TrainingGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 006 - Electrical ClosetGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 010 - Men's Lockers & ToiletsGSA3
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 011 - Women's Lockers & ToiletsGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 020 - Cinci District AdminGSA2
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 021 - Mail / File / Copy RoomGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 021 A/B File RoomGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 061 - Evidence RoomGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 062 - Analyzed and Un-Analyzed Surplus RoomGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 106 - Clean RoomGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 139 - Women's RestroomGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 142 - FCC LibraryGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 143GSA3
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 144 - Admin OfficerGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 148 - Team Leader IIGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 153 - Mail/File/CopyGSA1
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 159 - Men's Lockers & ToiletsGSA2
NEW-ALMStrobeStrobe - D503001.03.03.02GSARoom 161 - Women's Lockers & ToiletsGSA2
NEW-DuplicateALM -07Fire Alarm Panel/Security ServerFire Alarm Panel/Security ServerGSARoom 007 - TelephoneGSA1
NEW-ALM-05Heat SensorsHeat SensorsGSAB004 - Elevator Machine RoomGSA1
NEW-ALM-05Heat SensorsHeat SensorsGSARoom 070 - Volatile SolventsGSA2
NEW-ALM-05Heat SensorsHeat SensorsGSARoom 142 - FCC LibraryGSA1
NEW-ALM-05Heat SensorsHeat SensorsGSARoom 143GSA1
NEW-DuplicateALM-07AnnunciatorAnnunciatorGSARoom 002 - LobbyGSA1
NEW-ALM-07Fire Alarm Control Panel and Remote AnnunciatorsRemote annunciatorGSARoom 002 - Lobby - Main EntranceGSA1
NEW-ALM-08Fire Alarm Control Panel - Special SystemsFire Alarm Panel The panel is located in the main telecom room near the entry lobby. The fire alarm system is Edwards EST3 Network and can support 64 panels (NODES).GSAFloor 01 Room 006 - ElectricGSAEST 31
NEW-STS-1ATSStatic Transfer SwitchesStatic Transfer SwitchesGSARoom 09A - Switchgear & Electrical RoomGSA1
NEW-STA-2ATSStatic Transfer SwitchesStatic Transfer SwitchesGSARoom 09A - Switchgear & Electrical RoomGSA1
NEW-ATS-EDPAATSSwitch, Automatic TransferAutomatic Transfer SwitchGSABSL 3 Room B101 - Electrical RoomGSA7000 Series1
NEW-ATSATSSwitch, Automatic TransferAutomatic Transfer SwitchGSABSL 3 Room B101 - Electrical RoomGSA???
NEW-ATS-2ATSSwitch, Automatic TransferAutomatic Transfer SwitchGSARoom 009 - UPS RoomGSA1
NEW-ATS-3ATSSwitch, Automatic TransferAutomatic Transfer SwitchGSARoom 009 - UPS RoomGSA1
NEW-ATS-4ATSSwitch, Automatic TransferAutomatic Transfer SwitchGSARoom 009 - UPS RoomGSA1
NEW-ATS-1ATSSwitch, Automatic TransferAutomatic Transfer SwitchGSARoom 164 - Electrical RoomGSAMPAC 12001
BASBAS PanelHigh low aire pressure switchGSARoom 163 Mechanical RoomGSASystem 600 Apogee1
NEW-BASBuilding Automation System, DDCSiemens ApogeeGSABSL 3 Room BM 101- Mechanical PenthouseGSA1
BAS-01BASBASGSARoom 163 MezzenineGSASystem 600 Apogee1
NEW-BAS-03Building Automation System, Terminal End DevicesBAS-03: Building Automation System, Terminal End DevicesGSABuildingGSA?
NEW-BFPBackflowBackflowGSABSL 3 Room BM 101- Mechanical PenthouseGSA1
NEW-BFPBackflow Prevention DeviceBackflow Prev. Maintenance Water FeedGSARoom 163 Mechanical RoomGSA3
NEW-BFPBackflow Prevention DeviceBackflow Preventer 2" 9/16GSARoom 163 MezzanineGSA1
NEW-BFPBackflow Prevention DeviceBackflow Preventer 2.5" 9/16GSARoom 163 MezzanineGSA1
NEW-Boiler 1BLRBoilerBoilerGSABSL 3 Room BM 101- Mechanical PenthouseGSAKBN6011
NEW-Boiler 2BLRBoilerBoilerGSABSL 3 Room BM 101- Mechanical PenthouseGSAKBN6011
NEW-#3BLR-HW4Boiler, Hot Water, Oil/Gas/Comb, over 1000 MBHAtmospheric natural gas fired water tube boilers. Each boiler has an Input capacity of 13,500 MBH and was manufactured by Rite Boilers in 1996. The boiler plant operates 24 hours a day/7 days a week throughout the year to provide reheat on the VAV terminal units. The boilers and pumps are located in a mezzanine right above the chillersGSARoom 163 MezzanineGSA350S1
NEW-#4BLR-HW4Boiler, Hot Water, Oil/Gas/Comb, over 1000 MBHAtmospheric natural gas fired water tube boilers. Each boiler has an Input capacity of 13,500 MBH and was manufactured by Rite Boilers in 1996. The boiler plant operates 24 hours a day/7 days a week throughout the year to provide reheat on the VAV terminal units. The boilers and pumps are located in a mezzanine right above the chillersGSARoom 163 MezzanineGSA350S1
NEW-#1BLR-ST2Boiler, Steam, Natural Gas or Oil/Gas/CombGas‐fired steam boilersGSARoom 163 MezzanineGSA1150W1
NEW-#2BLR-ST2Boiler, Steam, Natural Gas or Oil/Gas/CombGas‐fired steam boilersGSARoom 163 MezzanineGSA1150W1
NEW-#1CHL-CW2Chiller, Centrifugal, water cooled600 ton electric centrifugal chillers. The chillers use R‐22 refrigerant.
0.6490 kW/tonGSARoom 163 Mechanical RoomGSA02XB465CR11/1/96Carrier
NEW-#2CHL-CW2Chiller, Centrifugal, water cooled600 ton electric centrifugal chillers. The chillers use R‐22 refrigerant.
0.6490 kW/tonGSARoom 163 Mechanical RoomGSA19XL535465CR11/1/96Carrier
NEW-CLR-06Refrigerant MonitorRefrigerant MonitorGSARoom 163 Mechanical Room NorthGSATGM1 Series1
NEW-CMPAir CompressorDuplex air compressor, provides compressed air to the laboratories.
3 HP, 460 Volts, 3 PhaseGSARoom 163 MezzanineGSAHR315D-8CC1Champion
NEW-CMPAir Compressor - 460VAir Compressor - 460VGSARoom 163 Mechanical RoomGSA1
NEW-CND-01Condensing Unit, RefrigerationCondenser Unit R-22GSARoofGSA30RAN040---611KA1
NEW-ACCU-1CND-01Condensing Unit, RefrigerationCondenser UnitGSARoofGSAPUHY-P72TKMU-A1
NEW-CND-01Condensing Unit, RefrigerationCondenser Unit R-404AGSARoof WestGSAM0S020M62S1
NEW-CND-01Condensing Unit, RefrigerationCondenser UnitGSARoof WestGSAM0Z035L64S1
NEW-AC-2COLCoil, CoolingCoil,CoolingGSARoofGSA1Coil,Heating/CoolingCoil,Heating/CoolingGSARoof
NEW-AC-3COLCoil, CoolingCoil, CoolingGSARoofGSA1
NEW-AC-2COLCoil, HeatingCoil,HeatingGSARoofGSA1
NEW-AC-1COLCoil,CoolingCoil,CoolingGSARoofGSA1
NEW-CTRCooling Tower2 cell cooling tower Total heat rejection capacity of the tower is 1500 tonsGSARoofGSA1
NEW-CTRCooling Tower2 cell cooling tower Total heat rejection capacity of the tower is 1500 tonsGSARoofGSA1
NEW-DCS-01DC Battery System, Lead AcidDC Battery System, Lead AcidGSARoom 009 - UPS RoomGSA???
NEW-HTR CTRL PNLDCTSwitch, DisconnectDisconnect 60 amp Hot water heaterGSABSL 3 Room BM 101- Mechanical PenthouseGSA1
NEW-Steam GeneratorDCTSwitch, DisconnectSwitch, DisconnectGSABSL 3 Room BM 101- Mechanical PenthouseGSA1
NEW-CHP-1DCTSwitch, DisconnectSwitch, DisconnectGSABSL 3 Room BM 101- Mechanical PenthouseGSA1
NEW-CHP-2DCTSwitch, DisconnectSwitch, DisconnectGSABSL 3 Room BM 101- Mechanical PenthouseGSA1
NEW-DCTSwitch, DisconnectDisconnect 30 ampGSALaundryGSANFR351B1
NEW-AC-1DCTSwitch, DisconnectDisconnect (AC-1)GSARoofGSANFR 353 Series B (100 AMP)1
NEW-RF-1DCTSwitch, DisconnectDisconnect (RF-1)GSARoofGSANFR 353 Series B (100 AMP)1
NEW-AC-2DCTSwitch, DisconnectDisconnect (AC-2)GSARoofGSANFR 354 Series B (200 AMP)1
NEW-AC-3DCTSwitch, DisconnectDisconnect (AC-3)GSARoofGSANFR 354 Series B (200 AMP)1
NEW-DCTSwitch, Disconnect18 Lab exhaust fan disconnectsGSARoofGSAFR 351 Series C (30 AMP)18
NEW-DCTSwitch, DisconnectSwitch, DisconnectGSARoofGSA30 AMP1
NEW-DCTSwitch, DisconnectSwitch, DisconnectGSARoofGSANFR 354 B (200 AMP)1
NEW-ACCU-1DCTSwitch, DisconnectSwitch, DisconnectGSARoofGSA30 AMP1
NEW-CH-1DCTSwitch, DisconnectSwitch, DisconnectGSARoofGSA100 AMP1
NEW-RF-1DCTSwitch, DisconnectDisconnectsGSARoofGSANFR 353 B (100 AMP)1
NEW-DCTSwitch, DisconnectDisconnectsGSARoof WestGSA30 AMP1
NEW-DCTSwitch, DisconnectDisconnectsGSARoom 085 - Electrical ClosetGSA14
NEW-DCTSwitch, DisconnectMarathon Motor DisconnectGSARoom 163 Mechanical RoomGSA1
NEW-HLP-EM-SUBDCTSwitch, DisconnectDisconnectsGSARoom 163 MezzanineGSA30 AMP1
NEW-DCTSwitch, Disconnect30 amp DIsconnect for EF4GSARoom 163 MezzanineGSA111111111111111111
NEW-DCTSwitch, DisconnectDisconnectsGSARoom 165 - Electrical RoomGSANF 352 A (60 AMP)1
NEW-ELV CTRL PNLDCTSwitch, DisconnectDisconnect 60 AmpGSARoom B004 Elevator RoomGSA1
NEW-DCTDisconnect - Unit HeaterDisconnect - Unit HeaterGSABSL 3 Room B101 - Electrical RoomGSA1
NEW-AC-1DCTSwitch, DisconnectDisconnect for AC1GSARoom 009 - UPS RoomGSA1
NEW-AC-2DCTSwitch, DisconnectDisconnect for AC2GSARoom 009 - UPS RoomGSAGSAGSA1
NEW-EF -17DCTSwitch, Disconnect - Explosion ProofSwitch, Disconnect - Explosion ProofGSABSL 3 RoofGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSACorridor A (50-73; 163-166)GSA3
NEW-DFSDIFFUSER - LAY INDiffuserGSAMain CorridorGSA5
NEW-DFSDIFFUSER - LAY INDIFFUSER - LAY INGSARoom 010 - Men's Lockers & ToiletsGSA3
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 011 - Women's Lockers & ToiletsGSA3
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 014 - Invest. Branch StorageGSA2
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 015 - Compliance Evidence StorageGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 016 - R&E OfficeGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 017 - OfficeGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 018 - OfficeGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 019 - Hearing RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 021 A/B File RoomGSA4
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 022 - Open OfficesGSA4
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 023 - Library / Resource CenterGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 024 - Library / Resource CenterGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 027 - OfficeGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 030 - District DirectorGSA3
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 031 - Admin. OfficerGSA2
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 036 - D.P.U. OfficesGSA4
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 051 - Invest. Sample Prep.GSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 052 - Office / StorageGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 058 - VaultGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 067 - Lab Equipment Storage RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 072 - Shipping Clerk RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 075CGSA2
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 081 - Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 084 - Telephone RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 085 - Electrical ClosetGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 089 - Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 090 - Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 092 - Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 093 - Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 098 - Separation III Lab Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 099 - Separation III Lab Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 100 - Separation III Lab Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 101 - Separatioin III Lab Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 102 - Separation III Lab Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 114 - Data RoomGSA2
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 118 - Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 119 - Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 122GSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 125 - Separation I Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 126 - Separation I Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 127 - Separation I Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 128 - Separation I Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 129 - Separation I Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 131GSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 133 - Separation II Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 134 - Separation II Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 135 - Separation II Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 136 - Separation II Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 137 - Separation II Data RoomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 139 - Women's RestroomGSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 153 - Mail/File/CopyGSA2
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 154 - Food Technica.GSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 155 - Statist.GSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 156 - Toxicol.GSA1
NEW-DFSDIFFUSER - LAY INDiffuserGSARoom 158 - General Lab StorageGSA4
NEW-DFSDIFFUSER- LAY INDIFFUSER- LAY INGSARoom 141 - FCC Conference RoomGSA6
NEW-DFSDIFFUSER- LAY INDIFFUSER- LAY INGSARoom 142 - FCC LibraryGSA4
NEW-DFSDIFFUSER- LAY INDIFFUSER- LAY INGSARoom 143GSA3
NEW-DFSDIFFUSER- LAY INDIFFUSER- LAY INGSARoom 144 - Admin OfficerGSA1
NEW-DFSDIFFUSER- LINEAR 4ftDIFFUSER- LINEAR 4ftGSARoom 141 - FCC Conference RoomGSA4
NEW-DFSDIFFUSER- LINEAR 4ftDIFFUSER- LINEAR 4ftGSARoom 145 - FCC Director's OfficeGSA3
NEW-DFSDIFFUSER- LINEAR 4ftDIFFUSER- LINEAR 4ftGSARoom 146 - Lab Director IIIGSA3
NEW-DFSDIFFUSER- LINEAR 4ftDIFFUSER- LINEAR 4ftGSARoom 147 - Team Leader IIIGSA2
NEW-DFSDIFFUSER- LINEAR 4ftDIFFUSER- LINEAR 4ftGSARoom 149 - Lab Director IIGSA3
NEW-DFSDIFFUSER-LINEAR AND LAY INDiffuserGSARoom 148 - Team Leader IIGSA1
NEW-DFSLinear Air DIffuser (4ft)Linear Air DIffuser (4ft)GSARoom 003 - Conference TrainingGSA7
NEW-DFSLinear Air DIffuser (4ft)Linear Air DIffuser (4ft)GSARoom 012 - Food Service AreaGSA19
NEW-DFSLinear Air Diffuser (8ft)Linear Air Diffuser (8ft)GSARoom 003 - Conference TrainingGSA1
NEW-DMP-01DamperDamperGSABSL 3 Room B101 - Electrical RoomGSA1
NEW-DMP-01Dampers, PneumaticPneumatic Dampers - Outside Air for CombustionGSARoom 163 MezzenineGSA2
NEW-BoilersDMP-01Motorized Dampers, Pneumatic or ElectricMotorized Dampers, Pneumatic or Electric above bag in bag outGSABSL 3 Room BM 101- Mechanical PenthouseGSA1
NEW-Bag in bag outDMP-01Motorized Dampers, Pneumatic or ElectricMotorized Dampers, Pneumatic or Electric above boilersGSABSL 3 Room BM 101- Mechanical PenthouseGSA1
NEW-DORDoors - Leading out to roofDoors - Leading out to roofGSARoom 163 MezzanineGSA2
NEW-DORExterior DoorsExterior DoorsGSAThroughout BuildingGSA14
NEW-DORGlass DoorsGlass DoorsGSARoom 071GSA2
NEW-DOR-01Door, Power OperatedPowered overhead door to dockGSARoom 068 - Shipping & ReceivingGSA1
NEW-DRNFloor DrainFloor DrainGSARoom 008 - JanitorGSA1
NEW-DRN-01Roof Drains, Downspout, and Gutter InspectionRoof Drains, Downspout, and Gutter InspectionGSA22 each roof drains, 392' of 6" gutteringGSA22
NEW-DRN-02Drains: Areaway, Driveway, StormDrains - Garage - 3 , Parking /Drive Way - 8GSAParking Garage , drive way storm drainsGSA11
NEW-T-RPADTTTransformerTransformerGSABSL 3 Room B101 - Electrical RoomGSA1
NEW-T-EDPDTTTransformerTransformerGSABSL 3 Room B101 - Electrical RoomGSAK-Factor Transmore1
NEW-FRP-VPSDTTTransformerTransformerGSABSL 3 Room B101 - Electrical RoomGSA1
NEW-T-4DTTTransformerTransformerGSARoom 164 Main Electrical RoomGSA1
NEW-T-1DTTTransformerTransformerGSAFloor 01 Room 006 - ElectricGSA1
NEW-DWV-05Emergency ShowerEmergency ShowerGSARoom 010 - Men's Lockers & ToiletsGSA1
NEW-DWV-05Emergency ShowerEmergency ShowerGSARoom 011 - Women's Lockers & ToiletsGSA1
NEW-DWV-05Emergency ShowerEmergency ShowerGSARoom 073 - Hazardous Waste RoomGSA1
NEW-DWV-05Emergency ShowerEmergency ShowerGSARoom 120 - Inorganic Sample PrepGSA1
NEW-DWV-05Emergency ShowerEmergency ShowerGSARoom 132 - Separation IIGSA1
NEW-DWV-05Emergency ShowerEmergency ShowerGSARoom 161 - Women's Lockers & ToiletsGSA2
NEW-EHFFume HoodFume HoodFDAFTIR LabGSA1
NEW-EHFFume HoodFume HoodFDAStandards Prep LabGSA1
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDABSL 2 Biology LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 063 - General Chemistry LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 063 - General Chemistry LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 096 - Analytical Sample Prep LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 096 - Analytical Sample Prep LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 110 - Mass Spec. LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 110 - Mass Spec. LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 113 - Ion Chromotography LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 113 - Ion Chromotography LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 117 - ICP, ESI, AA LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 117 - ICP, ESI, AA LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 120 - Inorganic Sample Prep PabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 120 - Inorganic Sample Prep PabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 120 - Inorganic Sample Prep PabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 120 - Inorganic Sample Prep PabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 121 - ICP Mass Spec LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDARoom 121 - ICP Mass Spec LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation I LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation I LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation I LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation I LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation II LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation II LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation II LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation II LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation III LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation III LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation III LabGSA705321
NEW-EHFFume Hood - Hamiltion Safeaire 70532Fume Hood - Hamiltion Safeaire 70532FDASeparation III LabGSA705321
NEW-EHFFume Hood - NuaireFume Hood - NuaireFDAFTIR LabGSA1
NEW-EHFHoodHoodFDAMicroscopy / Photo LabGSA1
NEW-EHFHood - Labconco MinihoodHood - Labconco MinihoodFDAStandards Prep LabGSALabconco Minihood1
NEW-EHFTable HoodTable HoodFDASeparation II LabGSA1
NEW-From Original Docs.ELTEmergency LightingEmergency LightingGSAGSA???
NEW-Passenger ELVELV-01ElevatorPassenger Elevator - 2 Stop hydraulic, 25 Hp, 480 VAC, 3 Phase, 60 HzGSARoom B004 Elevator RoomGSAS510-1001
NEW-EMGEmergency Generator400 kW/500 kVA generator with 500 Gallon subbase fuel tank.GSALocated outside on grade west side of buildingGSA400REOZJB1
NEW-EMG-01Emergency Diesel GeneratorA 150kW diesel generator with 300 Gallon subbase fuel tank.GSALocated outside on grade near the BSL‐3 expansionsGSA150RE0ZJB1
NEW-RP-UPSEPBElectrical PanelElectrical PanelGSABSL 3 CorridorGSA1
NEW-ELPEPBElectrical Panel - LightingElectrical Panel - LightingGSABSL 3 Room B101 - Electrical RoomGSA1
NEW-LPAEPBElectrical Panel - LightingElectrical Panel - LightingGSABSL 3 Room B101 - Electrical RoomGSA1
NEW-HLP-AEPBElectrical Panel - LightingElectrical Panel - LightingGSAFloor 01 Room 006 - ElectricGSA1
NEW-RP-FEPBElectrical Panel - LightingElectrical Panel - LightingGSAFloor 01 Room 006 - ElectricGSA1
NEW-HLP-BEPBElectrical Panel - LightingElectrical Panel - LightingGSARoom 085 - Electrical ClosetGSA1
NEW-RP-KEPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor AGSA1
NEW-RP-L2EPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor AGSA1
NEW-RPL1 Sect 1EPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor AGSA1
NEW-RPL1SubEPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor AGSA1
NEW-RP-L3 Sect 1EPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor BGSA1
NEW-RP-L3 Sect 2EPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor BGSA1
NEW-RP-L4EPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor BGSA1
NEW-RP-L5EPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor BGSA1
NEW-RP-L6 Sect 1EPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor CGSA1
NEW-RP-L6 Sect 2EPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor CGSA1
NEW-RP-L7A Sect 1EPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor CGSA1
NEW-RP-L7A Sect 2EPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor CGSA1
NEW-RP-MEPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSAFloor 01 Corridor DGSA1
NEW-RP-L7B Sect 1EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor DGSA1
NEW-RP-L7B Sect 2EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor DGSA1
NEW-RP-L8 Sect 1EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor DGSA1
NEW-RP-L8 Sect 2EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor DGSA1
NEW-RP-NEPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor DGSA1
NEW-RP-PEPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor DGSA1
NEW-RP-13A Sect 1EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor DGSA1
NEW-RP-13A Sect 2EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor DGSA1
NEW-RP-Q Sect 1EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor EGSA1
NEW-RP-Q Sect 2EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor EGSA1
NEW-RP-L9EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor EGSA1
NEW-RP-10 Sect 1EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor EGSA1
NEW-RP-10 Sect 2EPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSAFloor 01 Corridor EGSA1
NEW-RP-AEPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSARoom 020 - Cinci District AdminGSA1
NEW-RP-BEPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSARoom 020 - Cinci District AdminGSA1
NEW-RPL-CEPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSARoom 020 - Cinci District AdminGSA1
NEW-RP-DEPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSARoom 020 - Cinci District AdminGSA1
NEW-RP-EEPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSARoom 020 - Cinci District AdminGSA1
NEW-RP-DPUEPBElectrical Panel - ReceptaclesElectrical Panel - RecepticlesGSARoom 020 - Cinci District AdminGSA1
NEW-RP-LEPBElectrical Panel - ReceptaclesElectrical Panel - ReceptaclesGSARoom 143GSA1
NEW-ERP-L1EPBElectrical Panel - RecepticlesElectrical Panel - RecepticlesGSABSL 3 CorridorGSA1

This is the start of the file's text. The full file is on GovTribe.