About this file

Amendment 0001 Package for solicitation 47PE0019R0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

Description of Amendment/Modification

The purpose of this amendment is to accomplish the following:

1. Provide responses to contractor's questions. Responses to questions are included in Attachment 1, with additional information included in Attachment 2 and Attachment 3.

2. Incorporate the following clauses:

FAR 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2019); FAR clause 52.204-25 is incorporated by reference.

GSAM 552.204-70, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2019); and FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2019). GSAM clause 552.204-70 and FAR clause 52.204-24 are incorporated in full text, Attachment 4 and should be filled out and provided with the contractorâs proposal.

3. The proposal due date is extended to September 16, 2019 no later than 5:00 PM Eastern Standard Time.

ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME

47PE0019R0001/0001

Attachment 1 - Questions-Answers Timeberlake Jr. 4th Floor Renovation - USAF

Questions Answers

Do you have to attend the site visit to bid this project?

In accordance with the solicitation terms, Offerors are urged and expected to inspect the site where the work will be performed.

When is the start date?

The contract start date will be affected by the contract award date. There are then submittal reviews and security clearances thet must be processed before the actual onsite work can start.

This project will be further affected by the completion of the separate demolition and asbestos removal project. As discussed at the prebid conference contractors should forcast about a 6 month delay to start the actual onsite construction to allow for the completion of the demolition.

If we are awarded this project what security procedures?

All workers will be required to submit their personal information on a Contractors Information Worksheet. The process will vary depending on the type of clearance required as determined by the length of time theyt will be on the contract. For this project we anticipate most workers will require a Tier 1 clearance. (See Attachment 2 Security Information Fact Sheet for additional information).

Communications Cabinets

Sheet T-101: The enlarged Comm Room Plan shows 16 cabinets.

Sheets T-502 (detail 2 & 3) & T-503 (detail 1) show the buildout of 6 cabinets Sheet T-502 (detail 2) shows a standard cabinet.

Therefore, should the bid include 10 standard cabinets?

The specifications do not include any information on the cabinets.

Please provide a spec for the dimensions of the cabinets and any special requirements; i.e., fan, lockable, plexiglass front, etc.

Vertiv™ VR Rack: VR3350 or approved equal meeting the following;42U 1998mm (78.6”)H x 800mm (31.50”)W x 1215mm (47.83”)D with (1) 77% Perf Locking Front Door, (2) 77% Perf Split Locking Rear Doors, (2) pair 19” Mounting Rails,(4) Split Side Panels with locking slam latch, Toolless Removeable Top Panel, Casters and Leveling Feet, (2) Full Height PDU/Cable Mgt Brackets, (1) Baying Kit, (50) M6 Cage Nuts and Screws, Color White

7th Floor Terminal Equipment

The plans do not include any details regarding the Fiber Optic patch panels or Category 6 STP patch panels for the backbone links on the 7th floor. Please quantify what terminal equipment is required on the 7th floor.

Should we also include one 2RU horizonal wire manager for each patch panel?

Will this equipment be installed in an existing cabinet? If not, how many new cabinets are required?

We require industry standard LIUs (Lightguide Interconnect Unit) and Cat6 patch panels to properly support the infrastructure. We’re relying on the our engineering support to identify make and model of these units. Horizontal wire managers are only required for copper (Cat6) patch panels. All cabling and terminal equipment will be installed in new cabinets, total quantity

(16) – (8) in each data center.

Sheet T-102

This floor plan shows security keypads and cameras; however, there is no specification for any security systems. Does the scope include only conduit or are we responsible for any cabling or equipment?

Contractor to provide pathways from security devices and equipment to head end equipment location. The current Bosch Alarm panel is located on the 7th floor.

Sheet T-504, Keynote T6

This keynote calls for a 6-strand OM3 fiber cable to the workstations.

However, the faceplate detail shows six 2-strand jacks in the faceplate.

Should Keynote T6 require 12-strand fiber cable?

correct. Keynote T6 should read "OM3 12 STRAND FIBER OPTIC CABLE TO

WORKSTATION OUTLETS"

Sheet T-504, Keynote T3

Will this RG-11 cable be terminated and left coiled in both Comm Rooms or landed on a splitter?

If you require this link to be landed on a patch panel, it is not shown.

All RG-11 cabling should be terminated, connected, and routed in support of the newly installed security system. We’re rely on the GSA/Contractors to provide all equipment and integration of the security systems.

Sheet T-504, Detail 3

Will these Wall Outlets be free-wired in the ceiling and require cable supports or will they be installed in conduit or under the floor in the cable tray?

Refer to Detail 5 on Sheet T-501. Free wiring is not permitted. There is no ceiling in the unsecured area.

Cordage Requirements

It probably makes sense for us to provide Category 6 shielded patch cords on both ends of the station and backbone links. However, with over 2,000 strands of station and backbone fiber, it might not make sense to provide patch cords on both ends of all links. Please quantity the Cat 6 and fiber cordage that we should provide. Will we be responsible to install any cordage?

Only the Cat6 drops will require patch cords and only 50% of the drops will need patch cords on both ends with the following specs.

20% - 2 Meter

60% - 4 Meter

20% - 5 Meter

Sheet T-504: The faceplate details call for 6-port angled faceplates. I have looked at most of the manufacturers of these components, googled the internet, and could not find a 6-port angled faceplate. The largest single gang angled faceplate available is 4-port. Here are some possible solutions:

The Legrand EFB45S is a 4/5 gang box. One gang is used for power. Install 2 – 4-port faceplates for the fiber and 1 – 4 Port faceplate for the single Cat 6 shielded jack.

Land 2 of the fiber duplex jacks in the faceplate with the Cat 6 Shielded jack.

Install a flat 6-port faceplate for the fiber jacks.

Please advise on which solution we should use.

Consider modular faceplates such as Panduit and Ortronics. Angled faceplates not required in floorbox outlets, but should be utilized for wall outlets.

There isn’t a specification for the 16 cabinets shown on the drawings.

Please provide a spec and dimensions for these cabinets.

Vertiv™ VR Rack: VR3350 or approved equal meeting the following;42U 1998mm (78.6”)H x 800mm (31.50”)W x 1215mm (47.83”)D with (1) 77% Perf Locking Front Door, (2) 77% Perf Split Locking Rear Doors, (2) pair 19” Mounting Rails,(4) Split Side Panels with locking slam latch, Toolless Removeable Top Panel, Casters and Leveling Feet, (2) Full Height PDU/Cable Mgt Brackets, (1) Baying Kit, (50) M6 Cage Nuts and Screws, Color White

Can we use the existing elevators for material delivery The freight elevator will be available for contractor material deliveries.

General Demo note states floor demo under a separate contract. Floor finish notes states contractor to remove the existing floor The flooring demolition will be under separate contract.

A-6.01 Door Schedule Door 413B specified as wood. Detail 9A at A6.01 states metal door.

Please Clarify.

Door 413B should be solid core wood. Refer to "Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities" Version 1.4 for all door requirements.

In other SCIFs that we have built, they have allowed us to screw the 10GA Expanded Metal to the Studs instead of welding. (safety).

Correct, "Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities" Version 1.4, Chapter 3 section C.3.d.3 gives an alternative method for fastening the expanded metal in lieu of welding. It states "Hardened screws with one inch washers or hardened clips may be used in lieu of welding to fasten metal to the studs.Screws shall be applied every six inches along the length of each vertical stud and at the ceiling and floor."

Is this project limited to workers with USA citizenship Yes

Please provide hvac, electrical and plumbing plans of the base building systems. Please provide existing building structural plans. These can be provided after award to the sucessful bidder

A-002 Note 15 Please provide the locations of the existing expansion joints if any exist. Can they be identified and shown or provide as built drawings? These can be provided after award to the sucessful bidder

For the work to be conducted in the 3rd Floor Ceiling, who is the tenant currently on the 3rd floor if it is occupied. Will access to this floor be available during normal working hours?

The 3rd floor area where the work is to take place is vacant and access can provided anytime necessary.

If work for shut-downs of mechanical and electrical systems require working on the weekends or after hours, is there a requirement to have Security Officers present beyond their normal shifts? If so what is the hourly rate the GC will be required to pay them?

The only requirement for after hours work is that all workers must have a current HSPD-12 clearance.

There are security devices shown on T-102 and some details on T-501, however, there are no spec sections for security devices. Is the security system included in this SOW or is that being provided by others?

Contractor to provide pathways from security devices and equipment to head end equipment location provided by end user.

The 4" RGS Welded Conduit shown on the 4th floor has a note "continue to 7th Floor". Is this required to be welded RGS from the fourth floor up to the 7th Floor?

Correct this is for the 4" RGS conduit with the PDS system. All connection points for the conduit need to be welded. See Sheet T-601, Detail 1.

Roof Warranty must be maintained. Please provide contact and manufacturer currently providing warranty on existing roof.

Warranty No.: 101-006346 Premium NDL Roof Warranty Building Address: R.L. Timberlake Federal Building, 501 East Zack Street, Tampa, FL 33602 Owner : General Services Administration Region, 401 West Peachtree St. N.W., Atlanta, GA 30308 Area in Squares: 163 Membrane: 32s92/3092 Membrane Flashing: 3292 Substantial Completion Date: 08.13.2010 Length of Warranty: Twenty (20) Years Authorized Roofer: Associates Roofing 7 Construction, 1153 Burgess Rd., Murrells Inlet, SC 29576

Is there noise control in place for this project

Question is unclear; However this is an active federal building and the contractor must plan their work so that any noisy or disruptive work is completed after hours or on the weekend. Refer to Specification 015000

Is there a specific work hours for this project? Or are we allowed to work 24/7 as per 1.8 Work Restrictions B

The project site is available 24/7 however work being performed during normal work hours must not disrupt the current tenant operations and after hours work must be coordinated with security.

Window A in the Window Schedule on Sheet A-602 shows to an Aluminum Window. There are no Specifications for Aluminum Windows

Window A is refering to the RF Shielded Polycarbonate Storm Window. Refer to specification 088400 - PLASTIC GLAZING and detail 4/A-602 TYP STORM WINDOW RETENTION CLIP for information.

Where are the Fire Extinguishers Specified in Section 104416 to be installed?

Per the P100 (2018) section 7.9.5 PORTABLE FIRE EXTINGUISHERS, Fire Extinguishers should be installed in room 414 Un-Classified Server Room, room 415 UPS Room, and room 416 Classified Server Room.

There are no Specifications for the Metal Lockers.

Spec 105113 - Metal Lockers will be provided (See Attachment 3 105113 Metal Lockers)

Specification 263353 2.8A Battery Contractor shall supply Lithium Ion Batteries in lieu of lead acid batteries specified.

How long does the GSA badging process is expected to take for new contractors or employees?

This is unknown and depends on may factors related to the individual person requesting the clearance and the type of clearance. However all workers will require a clearance.

Where will the designated laydown and parking area be for workers accessing the construction site? No

During construction in an area where the ceilings or fire suppression system will be disrupted, will NFPA 241 apply? Yes

Will the government require additional security measures beyond NFPA code such as fire watch, temporary fire alarms, adjustments to sprinkler heads, etc. Yes

Who is the fire alarm servicer that is currently working onsite with? None

Please confirm that all demo has already been done and site is ready for rough in and new materials to be erected?

No, demolition is awarded but is not complete. As discussed on site the contractor should include a delayed start until demolition is completed.

What will be the working hours?

The contractor can have access 24/7 provided it is coordinated with the building manager and all noisy and disruptive work is done after hours.

Can the GC use elevators for materials and personnel? Only the freight elevator

Does the GSA has an anticipated NTP day? Not at this time

What is the desired color for the Kirei-Deep Cloud Ceiling Panels? Unknown, the contractor shall submit products as outlined in the submittal process.

Office of Mission Assurance

New GSA Form 850– Contractor Information Worksheet

The Requesting Official will initiate a CIW template upon the award of any new contract/task order, etc.

All items in sections 2, 3, 4 and 6 must be completed.

Email it to the Zone B Help Desk.

Any modifications to the contract that affect the contract end date, GSA or vendor POCs, contact information, etc. require a new CIW template be submitted to the Zonal Help Desk.

Contractor Information Worksheet (CIW)

Attachment 2- Security Information Fact Sheet

Contractor Information Worksheet (CIW), cont.

Contractor Information Worksheet (CIW), cont.

* REQUIRED FIELD

* IF APPLICABLE

The Zonal Help Desk will provide this form to Vendor Prime, along with training on the fitness determination process.

Vendor completes and sends to RO for review. The RO reviews;

completes type of investigation and credential information; then forwards to Zonal Help Desk, with copy to Vendor. Submission of the RO Contractor Approval List authorizes fitness determination processing and GSA access card issuance.

If a CIW is received for an applicant that does not appear on this list, the CIW will not be processed and the vendor prime will be notified that the individual cannot be processed until their name appears on the approval list.

Requesting Official (RO) Contractor Approval List

Each time contractor(s) are added or removed from a contract, the list must be updated by Vendor, sent through the RO for approval, and forwarded to the Zone B Help Desk.

All items on the RO Contractor Approval List are required for each contractor.

To be completed by the RO:

• Type of Investigation Required

SAC – up to 6 months (more than one as needed) Tier 1 – typical low risk more than 6 months

• GAC/PIV Required?

Requesting Official Contractor Approval List Contract/TO/DO/RWA #________________

Vendor Prime: _____________________________ Full Legal Name Individual Specific Escorting Credentialing

Last Name

First Name

Middle Name Suf

Position Title

Dates Required on

Project Vendor Name, if Subcontractor

Date Removed from

Project/Contract Name of Escort

Dates of Escort

Type of Investigation

Required (SAC or Tier

1, 2, or 4)

GAC/PIV

Required?

Individuals needing escort-only access must be listed on the RO Contractor Approval List.

To receive approval for escort-only access on a GSA project, the vendor must submit a CIW as well as the full legal name of the individual doing the escorting and the dates of escort in the email containing their CIW.

Contractors may be approved for escorted access up to 15 days within a 6-month period.

Those who will be working more than 15 days must complete the applicable fitness determination process.

Individuals in the process of completing a GSA fitness determination are not allowed to be escorted.

Office of Mission Assurance

Escort Procedures

Applicants who have previously been found unfit or have received notice that they must wait for final fitness determination cannot be considered for escort-only access.

The person doing the escorting must be a federal employee, FPS security personnel, or GSA contractor who is in possession of a GSA-issued PIV credential .

Escorts are responsible for the whereabouts and activities of escorted personnel at all times, and must remain within line of sight of escorted individuals at all times while in non-public space.

GSA PMs/CORs should consider the type of project and proximity to escorted contractors. It is suggested that 5-7 people per escort is typically manageable.

Office of Mission Assurance

Escort Procedures, cont.

Contractor Investigation Credential IT Access Tier 1 or Above GAC

Routine building access up to 6 months SAC None/TBD

Lessor employees and contractors in leased facilities FSL 4 or FSL 3, if 100% government occupied requiring access up to 6 months

SAC None/TBD

Routine building access longer than 6 months Tier 1 or above GAC

Lessor employees and contractors in leased facilities FSL 4 or FSL 3, if 100% government occupied requiring access longer than 6 months

Tier 1 or above GAC

Escorted for less than 15 days None None

Working outside only (landscapers, etc.) None None

New Constructions, prior to substantial completion None None

Construction in existing facility, cordoned off from remainder of building, with separate contractor entrance

None None

Lessor employees and contractors in leased facilities FSL 1 or 2, or FSL 3 with less than 100% government occupied.

None None

When is a Background Investigation Required?

Office of Mission Assurance 9

Contractor HSPD‐12 Investigation Decision Flowchart

No. Process Step Short-Term Contractor (working up to 6 months)

1 Requirements •Contractor Information Worksheet (CIW) •Complete OF306 Declaration of Federal Employment •Fingerprint enrollment appointment at MSO station

2 Fingerprinting Captured electronically at USAccess/MSO credentialing station after sponsorship in the GSA GCIMS security database.

Required for contractors within 100 miles of center. Any exceptions must be requested through Zone B Help Desk

3 Fitness Determination Results

Results typically between 3-5 business days. Sent by GSA email address to GSA Requesting Official(s), Vendor POC, and applicant with fitness determination results in the email.

Short-term Contractor Fitness Determination Process

Office of Mission Assurance 11

No. Process Step Long-Term Contractor ( working > 6 months, or requiring GSA network access)

Requirements

•Contractor Information Worksheet (CIW) •OF306 Declaration of Federal Employment •GSA Form 3665-Authorization to Obtain Credit Report •SF85P via online e-QIP questionnaire •Fingerprint enrollment appointment at MSO station

2 Fingerprinting Captured electronically at USAccess/MSO credentialing stations after sponsorship in the GSA GCIMS security database. Required for contractors within 100 miles of center. Any exceptions must be requested through the Zone B Help Desk. Note: MSO prints are mandatory for those requiring a GAC/PIV credential.

3 eQIP Process eQIP invites will be issued by OMA National Office. Form requirements will be the SF85P, 306 and the 3665; completed via the online e-QIP questionnaire. Communications regarding e-QIP status will be sent to the GSA RO and all those listed on the CIW, Vendor POC, and applicant.

4 Fitness Determination Results

Results typically between 3-5 business days. Sent to email addresses on the CIW (GSA Requesting Official, Vendor POC, etc.) with fitness determination results in the email.

Long-term Contractor Fitness Determination Process

Office of Mission Assurance 12

Acronyms

OMA: Office of Mission Assurance

RO: Requesting Official

FAC: Facility Access Card

CIW: Contractor Information Worksheet

GCIMS: GSA Credential & Identity Management System

MSO: Managed Service Office

GAC: GSA Access Card

PIV: Personal Identity Verification (PIV), also known as

GAC, HSPD-12 Credential, etc.

13Office of Mission Assurance

Air Force 4th Floor Office

R.L Timberlake Jr Federal Building

FL0064AE

Tampa, FL 100% Submittal 12/16

METAL LOCKERS 105113 - 1

SECTION 105113 - METAL LOCKERS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Welded athletic lockers.

2. Locker benches.

1.2 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product, include:

1. Preparation instructions and recommendations

2. Storage and handling requirements and recommendations.

3. Installation methods.

B. Shop Drawings: For metal lockers.

1. Include plans, elevations, sections, and attachment details.

2. Include locker identification system and numbering sequence.

3. Include schedule of finishes and accessories.

C. Samples: For each color specified.

1.4 INFORMATIONAL SUBMITTALS

A. Sample warranty.

1.5 CLOSEOUT SUBMITTALS

A. Maintenance data.

1.6 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace components of metal lockers that fail in materials or workmanship, excluding finish, within specified warranty period.

1. Warranty Period for Welded Metal Lockers: 10 years from date of Substantial

Completion.

Attachment 3 - 105113 Metal Lockers

FL0064AE

Tampa, FL 100% Submittal 12/16

METAL LOCKERS 105113 - 2

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Accessibility Standard: For lockers indicated to be accessible, comply with applicable provisions in the ABA standards of the Federal agency having jurisdiction.

2.2 WELDED ATHLETIC LOCKERS

A. Perforated Doors: One piece; fabricated from 0.075-inch (1.90-mm) nominal-thickness steel sheet with manufacturer's standard diamond perforations; formed into channel shape with double bend at vertical edges and with right-angle single bend at horizontal edges and latch point (bottom) and right-angle single bend at remaining edges for box lockers.

1. Reinforcement: Manufacturer's standard reinforcing angles, channels, or stiffeners for doors more than 15 inches (381 mm) wide; welded to inner face of doors.

B. Body: Assembled by welding body components together. Fabricate from unperforated steel sheet with thicknesses as follows:

1. Tops and Bottoms: 0.060-inch (1.52-mm) nominal thickness, with single bend at edges.

2. Backs: 0.048-inch (1.21-mm) nominal thickness.

3. Shelves: 0.060-inch (1.52-mm) nominal thickness, with double bend at front and single bend at sides and back.

C. Perforated Sides: Fabricated from 0.060-inch (1.52-mm) nominal-thickness steel sheet with manufacturer's standard diamond perforations.

D. Frames: Channel formed; fabricated from 0.060-inch (1.52-mm) nominal-thickness steel sheet or 0.097-inch (2.45-mm) nominal-thickness steel angles; lapped and factory welded at corners;

with top and bottom main frames factory welded into vertical main frames. Form continuous, integral, full-height door strikes on vertical main frames.

E. Reinforced Bottoms: Structural channels, formed from 0.060-inch (1.52-mm nominal-thickness steel sheet; welded to front and rear of side-panel frames.

F. Hinges:

1. Knuckle Hinges: Steel, full loop, five or seven knuckles, tight pin; minimum 2 inches (51

mm) high. Provide no fewer than three hinges for each door more than 42 inches (1067

mm) high.

G. Recessed Door Handle and Latch: Stainless-steel cup with integral door pull, recessed so locking device does not protrude beyond door face; pry and vandal resistant.

1. Single-Point Latching: Nonmoving latch hook with steel padlock loop that projects through recessed cup and is finished to match metal locker body.

FL0064AE

Tampa, FL 100% Submittal 12/16

METAL LOCKERS 105113 - 3

a. Latch Hook: Equip each door with one latch hook.

H. Hooks: Manufacturer's standard ball-pointed, aluminum or steel; zinc plated.

I. Coat Rods: Manufacturer's standard.

J. Continuous Zee Base: 4 inches (102 mm) high; fabricated from 0.075-inch (1.90-mm) nominal-thickness steel sheet.

K. Continuous Sloping Tops: Fabricated from 0.048-inch (1.21-mm) nominal-thickness steel sheet, with a pitch of approximately 20 degrees.

1. Closures: Vertical-end type.

L. Materials:

1. Cold-Rolled Steel Sheet: ASTM A1008/A1008M, Commercial Steel (CS), Type B, suitable for exposed applications.

2. Metallic-Coated Steel Sheet: ASTM A653/A653M, Commercial Steel (CS), Type B; with

A60 (ZF180) zinc-iron, alloy (galvannealed) coating designation.

M. Finish: Baked enamel or powder coat.

1. Color: As selected by Architect from manufacturer's full range.

2.3 LOCKS

2.4 LOCKER BENCHES

A. Provide bench units with overall assembly height of 17-1/2 inches (445 mm) .

B. Bench Tops: Manufacturer's standard one-piece units, with rounded corners and edges.

1. Size: Minimum 20- to 24-inch- (508- to 610-mm-) wide tops.

2. Laminated clear hardwood with one coat of clear sealer on all surfaces and one coat of clear lacquer on top and sides.

C. Movable-Bench Pedestals: Manufacturer's standard supports, with predrilled fastener holes for attaching bench top, complete with fasteners, and as follows:

1. Finish: Manufacturer's standard.

D. Materials:

1. Stainless Steel: ASTM A666, Type 304.

FL0064AE

Tampa, FL 100% Submittal 12/16

METAL LOCKERS 105113 - 4

2.5 FABRICATION

A. Fabricate metal lockers square, rigid, without warp, and with metal faces flat and free of dents or distortion. Make exposed metal edges safe to touch and free of sharp edges and burrs.

B. Fabricate each metal locker with an individual door and frame; individual top, bottom, and back; and common intermediate uprights separating compartments.

C. Equipment: Provide each locker with an identification plate and the following equipment:

1. Single-Tier Units: Shelf, one double-prong ceiling hook, and two single-prong wall hooks.

D. Welded Construction: Factory preassemble metal lockers by welding all joints, seams, and connections; with no bolts, nuts, screws, or rivets used in assembly of main locker groups.

Factory weld main locker groups into one-piece structures. Grind exposed welds smooth and flush.

E. Accessible Lockers: Fabricate as follows:

1. Locate bottom shelf no lower than 15 inches (381 mm) above the floor.

2. Where hooks, coat rods, or additional shelves are provided, locate no higher than 48 inches (1219 mm) above the floor.

F. Continuous Sloping Tops: Fabricated in lengths as long as practical, without visible fasteners at splice locations; finished to match lockers.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install lockers level, plumb, and true; shim as required, using concealed shims.

1. Anchor locker runs at ends and at intervals recommended by manufacturer, but not more than 36 inches (910 mm) o.c. Using concealed fasteners, install anchors through backup reinforcing plates, channels, or blocking as required to prevent metal distortion.

2. Anchor single rows of metal lockers to walls near top and bottom of lockers.

B. Welded Lockers: Connect groups together with manufacturer's standard fasteners, with no exposed fasteners on face frames.

C. Fixed Benches: Provide no fewer than two pedestals for each bench, uniformly spaced not more than 72 inches (1830 mm) apart.

END OF SECTION 105113

GSAR 552.204-70, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019)

(a) Definitions. As used in this clause-

“Covered telecommunications equipment or services”, “Critical technology”, and “Substantial or essential component” have the meanings provided in FAR 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition. Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Contractors are not prohibited from providing-

(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Representation. The Offeror or Contractor represents that it [ ] will or [ ] will not [Contractor to complete and submit to the Contracting Officer] provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract, order, or other contractual instrument resulting from this contract. This representation shall be provided as part of the proposal and resubmitted on an annual basis from the date of award.

(d) Disclosures. If the Offeror or Contractor has responded affirmatively to the representation in paragraph (c) of this clause, the Offeror or Contractor shall provide the following additional information to the Contracting Officer--

(1) All covered telecommunications equipment and services offered or provided (include brand; model number, such as original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable);

(2) Explanation of the proposed use of covered telecommunications equipment and services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b) of this provision;

(3) For services, the entity providing the covered telecommunications services (include entity name, unique entity identifier, and Commercial and Government Entity (CAGE) code, if known); and

(4) For equipment, the entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known). (End of clause)

FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2019)

(a) Definitions. As used in this provision—

“Covered telecommunications equipment or services”, “Critical technology”, and “Substantial or essential component” have the meanings provided in clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition. Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential https://www.acquisition.gov/content/52204-25-prohibition-contracting-certain-telecommunications-and-video-surveillance-services#id1989I600I4C component of any system, or as critical technology as part of any system. Contractors are not prohibited from providing—

(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Representation. The Offeror represents that—

It □ will, □ will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.

(d) Disclosures. If the Offeror has responded affirmatively to the representation in paragraph (c) of this provision, the Offeror shall provide the following information as part of the offer

(1) All covered telecommunications equipment and services offered (include brand; model number, such as original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable);

(2) Explanation of the proposed use of covered telecommunications equipment and services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b) of this provision;

(3) For services, the entity providing the covered telecommunications services (include entity name, unique entity identifier, and Commercial and Government Entity (CAGE) code, if known); and

(4) For equipment, the entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known).

(End of provision)

Solicitation Amendment 47PE0019R0001 0001
Attachment 1 - Questions-Answers Timeberlake Jr. 4th Floor Renovation - USAF
Attachment 2 - Security Information Fact Sheet
Attachment 3 - 105113 - Metal Lockers
Attachment 4 GSAR 552.204-70 and FAR 52.204-24 Full Text
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0001
Code[0]: 4PQ1
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Tiffanie Oglesby, Contracting Officer
Description[0]: Please see attached
FacilityCode[0]:
Code[2]: 4PQ1
IssuedBy[0]: Deputy Director (AMD)

77 Forsyth Street SW Atlanta, GA 30303-3490 USA

NameandAddress[0]:
AdministeredBy[0]: Deputy Director (AMD)

77 Forsyth Street SW Atlanta, GA 30303-3490 USA

ContractIDCode[0]:
ReqNumber[0]: EQ4PPF-19-0077
AmendmentNo[1]: 47PE0019R0001
ModificationNo[0]:
ProjectNo[0]: N1904396
Page[0]: 1
Pages[0]: 27
EffectiveDate[0]: 9/3/2019
Dated9B[0]: 8/2/2019
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: 1
NotExtended[0]: Off
DateSigned[0]:
DateSigned[1]:
Copies[0]:
CopiesReturned[0]:
Page2[0]:
TextField1[0]:
TextField1[1]:
TextField1[2]:
TextField1[3]:
TextField1[4]:
TextField1[5]:

File details come from the government source that posted it.