47PC1019R0005
Martin Luther King, Jr. Federal Building and U.S. Courthouse Construction Services for
Roof Replacement Project
Building Description: The Martin Luther King, Jr. Federal Building and U.S. Courthouse
(MLK Courthouse) is part of the “Federal Campus” in Newark, NJ, and fronts Walnut Street.
Construction of the five story building was completed in 1992. The roofing system is a combination of low slope and steep slope systems. The existing low slope roofing system is a gravel surfaced built-up roof system which was installed in approximately 2001. The steep slope roof systems are standing seam metal roof systems. Additionally, a significant amount of mechanical equipment, duct work, electrical equipment, conduit, roof drains, lightning protection components, penthouse skylights, security cameras and equipment, bird control netting, and other building systems are located on the roof.
Project Background: In 2014, the roof was experiencing numerous leaks. Roofing Resources, Inc. (RRI) was contracted by GSA to perform an inspection of the roof and prepare a condition assessment report. RRI identified potential sources of leaks, and recommended that the low slope roof system be replaced in its entirety. Subsequently, Gensler was contracted to complete design of the roof replacement project and furnish construction documents for this work. In addition to replacement of the low slope roofing system, the work of this project includes, but is not limited to, mechanical, electrical, and bird control netting work.
General: Contractor shall provide any and all construction services, design services (if applicable), labor, and materials necessary to provide a complete roofing system complying with the requirments of the Contract Documents and referenced standards.
Contractor shall provide a Construction Project Mqanager that shall attend all progress meetings in person and shall be at the Project Site at least once a week during the construction period of performance to observe, inspect, and ensure the construction is completed in accordance with the
Contract Documents and other specified contract requirements.
Contractor shall be responsible for furnishing a workforce which satisfies the security requirements that will be described in the solicitation. Contractors and sub-contractors shall undergo a law enforcement check and background investigations.
Period of Performance: The work shall be Substantially Complete within 100 calendar days from Notice to Proceed (NTP)
Bonding Requirements: Contractor shall obtain Bid Bonds and if awarded contract shall obtain
Payment and Performance Bonds sufficient to cover all expenses related to construction of this project. Failure to provide either Bid Bonds or Payment and Performance Bonds will make a
Contractor ineligible for award.
Logistics: The campus that MLK is located on has no parking for contractor vehicles other than what is necessary to complete this project. It shall be the contractors responsibility to coordinate an and all material and vehicle placement for construction prior to execution.
Solicitation Timeframe and other details: A solicitation for this project will be issued on or about April 17, 2019. The NAICS Code for this project is 238160, Roofing Contractors. The size standard is $15,000,000.00.
Solicitation Evaluation: This solicitation shall be awarded on a Lowest Price Technically
Acceptable (LPTA) basis. The Solicitation will detail what will be considered Technically
Acceptable.