Elevator Modernization Project at Ted Weiss Federal Office Building at 290 Broadway
47PC0318R0004
RFI Responses as of 5/9/18
For RFI Responses 1-6, please see Amendment 0002 to the solicitation.
For RFI Responses 7-10, please see Amendment 0003 to the solicitation.
For RFI Responses 11-33, Please see Amendment 0004 to the solicitation.
For RFI Responses 34-48, Please see Amendment 0005 to the solicitation.
For RFI Responses 49-57, Please see Amendment 0006 to the solicitation
RFI58: Drawing E-203 shows a UPS12 power supply. Is the UPS system existing? There was no reference to it in the spec’s. If not existing which contractor is responsible for supplying it – the electrical contractor or the elevator contractor?
Response58: This is for intercom system, thus the electrical contractor’s responsibility.
RFI59: The SF-1442 form seems to contradict what was discussed previously at the site visit. The base bid should NOT include and HVAC work or Intercom work, correct? The 1442 reads like a deduct, and I want to make sure I don’t need to include those in the base number…
Response59: The base bid should include HVAC and communication system work as line items. Please provide bids based off of the provided SF 1442 format.
RFI60: REVISION to Previous answer for RFI:51
Response60: The note #13 on Drawing M-002 “No Substitutions Permitted,” is a typo, please delete.
Alternate product may be accepted, if it is proven to be “Equal or Better” product.
Note that the specification section 237413 lists (3) manufactures.
Note the specification calls out for “Packaged Compressor and Condenser Units” which must be factory assembled and tested
Resp