Responses_to_Industry's_RFIs_5-9-2018.pdf

PDF 385 KB Posted

Attached to
290 Broadway Elevator Modernization Phase 2
Solicitation number
47PC0318R0004(GS-02-P-18-DT-C-ELEV)
Issued by

About this file

Responses to RFI's 5-9-2018

View the file

Other files

File Type Posted
Responses_to_Industry's_RFIs_5-10-2018.pdf PDF
SF30__Amendment_0006_47PC0318R0004_0006_Signed_LZ.pdf PDF
1228.15.00_-_VT-101_LOW-MID_RISE_ELEV-Layout1.pdf PDF
1228.15.00_-_M-002_MECH_SCHEDULES-Layout1.pdf PDF
1228.15.00_-_SP-201_17th_FL_SPRK_PLAN-Layout1.pdf PDF
Responses_to_Industry's_RFIs_5-4-2018.pdf PDF
Reps_and_Certs_C301.pdf PDF
Responses_to_Industry's_RFIs_4-26-2018.pdf PDF
Proposal_Preparation_Instructions_4-26-2018.doc DOC document
Revised_GC_Solicitation_290_Broadway_4-26-_2018.pdf PDF
Solicitation_Amendment_SF_30_47PC0318R0004_0005_Signed.pdf PDF
47PC0318R0004__Form_SF_1442_4-26-2018.pdf PDF
Second_Site_Visit_Attendees_List.pdf PDF
Solicitation_Amendment_47PC0318R0004_0004.pdf PDF
Revised_Additional_Information__-_RFP_47PC0318R0004.pdf PDF
Revised_47PC0318R0004__Form.pdf PDF
Responses_to_Industry's_RFIs_4-19-2018.pdf PDF
Responses_to_Industry's_RFIs_4-17-2018.pdf PDF
Solicitation_Amendment_47PC0318R0004_0003.pdf PDF
290_Photo_Set.pdf PDF
Site_Visit_Attendees_list.pdf PDF
Responses_to_Industry's_RFIs_4-11-2018.pdf PDF
Solicitation_Amendment_47PC0318R0004_0002.pdf PDF
Revised_GC_Solicitation_290_Broadway_4-4-2018.pdf PDF
Revised_GC_Solicitation_290_Broadway.pdf PDF
Revised_47PC0318R0004__Form_1442.pdf PDF
Solicitation_Amendment_47PC0318R0004_0001.pdf PDF
Revised_ATTACHMENT_A1.pdf PDF
Proposal_Preparation_Instructions.pdf PDF
GSA527-15b.pdf PDF
C101_-_GC_Agreement_(1)_(1).pdf PDF
00200_-_Wage_Determination.pdf PDF
01050_-_Partnering.pdf PDF
RFP_Attachments.pdf PDF
47PC0318R0004__Form.pdf PDF
C201_GC_Solicitation_290_Broadway.pdf PDF
New_York_State_Tax_Notice.pdf PDF
SF24-16_(1).pdf PDF
Additional_Information__-_RFP_47PC0318R0004.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Elevator Modernization Project at Ted Weiss Federal Office Building at 290 Broadway

47PC0318R0004

RFI Responses as of 5/9/18

For RFI Responses 1-6, please see Amendment 0002 to the solicitation.

For RFI Responses 7-10, please see Amendment 0003 to the solicitation.

For RFI Responses 11-33, Please see Amendment 0004 to the solicitation.

For RFI Responses 34-48, Please see Amendment 0005 to the solicitation.

For RFI Responses 49-57, Please see Amendment 0006 to the solicitation

RFI58: Drawing E-203 shows a UPS12 power supply. Is the UPS system existing? There was no reference to it in the spec’s. If not existing which contractor is responsible for supplying it – the electrical contractor or the elevator contractor?

Response58: This is for intercom system, thus the electrical contractor’s responsibility.

RFI59: The SF-1442 form seems to contradict what was discussed previously at the site visit. The base bid should NOT include and HVAC work or Intercom work, correct? The 1442 reads like a deduct, and I want to make sure I don’t need to include those in the base number…

Response59: The base bid should include HVAC and communication system work as line items. Please provide bids based off of the provided SF 1442 format.

RFI60: REVISION to Previous answer for RFI:51

Response60: The note #13 on Drawing M-002 “No Substitutions Permitted,” is a typo, please delete.

Alternate product may be accepted, if it is proven to be “Equal or Better” product.

Note that the specification section 237413 lists (3) manufactures.

Note the specification calls out for “Packaged Compressor and Condenser Units” which must be factory assembled and tested

Resp