Responses_to_Industry's_RFIs_4-11-2018.pdf

PDF 72 KB Posted

Attached to
290 Broadway Elevator Modernization Phase 2
Solicitation number
47PC0318R0004(GS-02-P-18-DT-C-ELEV)
Issued by

About this file

Responses to Industry's RFIs as of 4/11/2018

View the file

Other files

File Type Posted
Responses_to_Industry's_RFIs_5-10-2018.pdf PDF
Responses_to_Industry's_RFIs_5-9-2018.pdf PDF
SF30__Amendment_0006_47PC0318R0004_0006_Signed_LZ.pdf PDF
1228.15.00_-_VT-101_LOW-MID_RISE_ELEV-Layout1.pdf PDF
1228.15.00_-_M-002_MECH_SCHEDULES-Layout1.pdf PDF
1228.15.00_-_SP-201_17th_FL_SPRK_PLAN-Layout1.pdf PDF
Responses_to_Industry's_RFIs_5-4-2018.pdf PDF
Reps_and_Certs_C301.pdf PDF
Responses_to_Industry's_RFIs_4-26-2018.pdf PDF
Proposal_Preparation_Instructions_4-26-2018.doc DOC document
Revised_GC_Solicitation_290_Broadway_4-26-_2018.pdf PDF
Solicitation_Amendment_SF_30_47PC0318R0004_0005_Signed.pdf PDF
47PC0318R0004__Form_SF_1442_4-26-2018.pdf PDF
Second_Site_Visit_Attendees_List.pdf PDF
Solicitation_Amendment_47PC0318R0004_0004.pdf PDF
Revised_Additional_Information__-_RFP_47PC0318R0004.pdf PDF
Revised_47PC0318R0004__Form.pdf PDF
Responses_to_Industry's_RFIs_4-19-2018.pdf PDF
Responses_to_Industry's_RFIs_4-17-2018.pdf PDF
Solicitation_Amendment_47PC0318R0004_0003.pdf PDF
290_Photo_Set.pdf PDF
Site_Visit_Attendees_list.pdf PDF
Solicitation_Amendment_47PC0318R0004_0002.pdf PDF
Revised_GC_Solicitation_290_Broadway_4-4-2018.pdf PDF
Revised_GC_Solicitation_290_Broadway.pdf PDF
Revised_47PC0318R0004__Form_1442.pdf PDF
Solicitation_Amendment_47PC0318R0004_0001.pdf PDF
Revised_ATTACHMENT_A1.pdf PDF
Proposal_Preparation_Instructions.pdf PDF
GSA527-15b.pdf PDF
C101_-_GC_Agreement_(1)_(1).pdf PDF
00200_-_Wage_Determination.pdf PDF
01050_-_Partnering.pdf PDF
RFP_Attachments.pdf PDF
47PC0318R0004__Form.pdf PDF
C201_GC_Solicitation_290_Broadway.pdf PDF
New_York_State_Tax_Notice.pdf PDF
SF24-16_(1).pdf PDF
Additional_Information__-_RFP_47PC0318R0004.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Elevator Modernization Project at Ted Weiss Federal Office Building at 290 Broadway

47PC0318R0004

RFI Responses as of 4/11/18

RFI1: Can you please confirm if the elevator maintenance is being bid with the modernization work?

Response1: The building maintenance contractor (LCOR) will remain responsible for maintenance and operation of elevators that remain in operation (in service) and will be responsible for all elevators when this elevator project is complete.

RFI2: s setting this effort aside for an SDVOSB elevator company under consideration as you perform Market Research?

Response2: After consideration, the requirement will remain full and open to all businesses. We encourage all SDVOSB and other small businesses to submit proposals.

RFI3: Yesterday I downloaded the documents for this project from the FBO website. It contained drawings, access flooring spec and and a 206 page Project manual specification but I could not find the specifications for the various trades involved such as Vertical transportation, Electrical HVAC, Fire sprinkler etc. They are listed in the index of the project manual but are not contained in the manual. I know they exist because I have them from the original bid from back in December 2017. I need these current specification as soon as possible in order to get this out to my sub-contractors as soon as possible. Please advise.

Response3: The full specification package has been uploaded to the FBO.gov notice.

RFI4: Page 7 of the Solicitation, Technical Qualifications, Experience on Elevator Modernization Projects, states to provide 3 projects with a minimum construction cost of $3m. We understand this to mean total construction value, not just the value of the elevator portion of the work. Please confirm.

Response4: Confirmed that the $3 million threshold is for the total construction value, not solely the elevator portion of those projects.

RFI5: An information sheet was handed out at the site visit which states 1 project must have a minimum value of $3m and 2 projects with no minimum cost involving "modernization or new construction". Does Modernization or New Construction refer only to the elevator portion of the project or to the total construction value (GC work)?

Response5: The information sheet issued at the site visit was for informational purposes only and does not supersede or replace the requirements in the solicitation. On page seven (7) of the revised solicitation states that similar projects include "Major modernization or new construction of elevators...". The government will be looking for modernization or new construction of elevators rather than general modernization or construction work.

RFI6: Will you be incorporating the handout by Amendment to replace the requirements provided in the

RFP?

Response6: The information sheet issued at the site visit was for informational purposes only and does not supersede or replace the requirements in the solicitation. It will not be incorporated into the solicitation

File details come from the government source that posted it.